Rfp For New Meghalaya State Data Centre (Msdc) Engagement Of An Agency For Design, Site Preparation, Supply, Installation, Configuration, Testing, Training, For Setting Up And Operation Maintenance Of Msdc At Iccc Building, New Shillong , Product Description , Internet Router , Utm/Ngfw , Rack Server Type 1 , Rack Server Type 2 , 120 Tb Enterprise Storage , 120 Tb Backup Appliance , Backup Software , Core Switch , Access Layer Switch - Type 1 , Access Layer Switch - Type 2 , Management Switch , Kvm Complete Solution , Server Security Software , Link Load Balancer , Web Application Firewall , Anti Ddos , Siem , Ems/Nms Software , 250 Kva Diesel Generator Set With Amp Panel , Ups - 120 Kva , Intergrated Building Management System – With The Existing Infrastructure Of The Iccc And Other Equipment In The Building Or Proposed Solutions/Or New Solution , Dcim , 31.3 Kw Precision Ac And Should Be Functional On Round-Robin Mode , Server And Network Rack (3 Server Racks And 2 Network Racks) , Access Control System , Syslog Server , 65-Inch Display , Workstation (All-In-One Pc) , Pa System , Dome Camera , Bullet Camera , Ptz Camera , 32 Channel Nvr , Integration Of Fire Detection And Alarm System/New Solution , Aspiration System (Vesda)/ New Solution , Gas Based Fire Suppression System , Integration Of Rodent Repellent System/New Solution , Integration Of Water Leak Detection System/New Solution , Virtualization , Cloud Management Software , Interior For Setting Up Data Centre, Ups Room, Office Rooms And Conference Room Along With Furniture And Raised Floor For Data Centre, Comfort Ac’S (Excluding The Server Farm Area) As Per Bidders’ Proposal , Windows Server Standard - (Latest Edition) - 16-Core License (The Unit Rate Should Be Provided, So That Additional Requirement If Required May Be Purchased Later On) , Rhel Server Standard 2-Cpu/2-Guest License (Latest Edition) (The Unit Rate Should Be Provided, So That Additional Requirement If Required May Be Purchased Later On) , Supply And Installation Of Data Cable. Cabling For Network And Server Racks With Cat 6A And Fiber Inclusive Of All Items For The Entire Project , Electrical Wiring For The Entire Project As Per Requirement And Wiring Including Ups 120 Kva Wiring , Iso 27001 Certification For Msdc , Iso 20000 Certification For Msdc , Transformer & The Electrical Panel Of The Transformer Should Be Installed In The Basement Of The Iccc Building , Facility Management Services (Fms) Including Manpower For Msdc