|
| 1 | Loading, carriage of following items from Store Centre, Gauriganj/Sultanpur to dump store including unloading and proper stacking (distance 0-70 km.) (Sl. No. 2 - 18) |
| 2 | PCC pole. |
| 3 | ACSR Weasel Conductor |
| 4 | 11 KV Cross arm |
| 5 | 25 KVA Transformer |
| 6 | 11 KV pin insulator with pin |
| 7 | 11 KV disk insulator with fitting |
| 8 | Top Channel. |
| 9 | T-off channel |
| 10 | Stay Set complete |
| 11 | Earthing complete |
| 12 | Dropper Angle |
| 13 | MS base angle |
| 14 | L.T. ABC Three phase (3*50+1*35+1*16) Sq.mm. |
| 15 | ABC Single phase Cable (1*25+1*16) Sq. mm. |
| 16 | Other Line Materials |
| 17 | Dragging of STP/PCC Pole from dump store to pit site. |
| 18 | Digging of pits up to the depth of 1650/2200 mm. as per site requirement. Fabrication & erection of single pole support on PCC pole support including digging of pit & fixing of all accessories and clamps as per RESPO norms. |
| 19 | Digging of pits up to the depth of 1650/2200 mm. as per site requirement.Fabrication & erection of double pole support on P.C.C. pole includingdigging of pit & fixing of all accessories and clamps as per RESPO norms. |
| 20 | Grouting of PCC pole in ratio 1:4:8 with cement stone ballast, coarse sand and plinthing 300 mm above ground level as well as muffing of plinth. |
| 21 | Spreading, laying & stringing of ACSR weasel conductor for construction of 11 KV line as per RESPO norms. |
| 22 | Spreading, Laying & Stringinging of L.T. ABC Three phase (3*50+1*35+1*16) Sq.mm |
| 23 | Spreading, Laying & Stringinging of ABC Single phase Cable (1*25+1*16) Sq. mm. |
| 24 | Ordinary earthing by 11 KV MS earth rod 2500 mm long as per RESPO norm. |
| 25 | Concreting & nuzzling of stay complete including fixing of necessary clamps with the help of nuts & bolts other accessorise required for completing the work as well as its grouting by civil material viz.Sand, stone ballast and cement. The contractor will provide all civil material as well as stay insulator |
| 26 | Installation of 25 KVA Transformer on newly constructed Double pole making proper connections from 11 KV system and proper testing as well as commissioning of Transformer. |
| 27 | Fabrication ofTransformer Trolleysuitable for 250 KVA Transformer and making proper connection/installation of 250 KVA Transformer on fabricated Transformer Trolley. |
| 28 | Providing and fixing of Top/T-off/Dropper Clamp for PCC |
| 29 | Providing and fixing of clamp for 11 KV cross arm |
| 30 | Providing and fixing of F Braket |
| 31 | Providing and fixing LT shakle Insulator on PCC Pole |
| 32 | Providing and fixing of LT Clamp |
| 33 | Providing and fixing of suspention clamp |
| 34 | Providing and fixing of Dead End Clamp |
| 35 | Providing and fixing of I Hook |