|
| 1 | Earth work in excavation in ordinary soil including lift upto 1.5M lead upto 30M including back filling watering and ramming of excavated earth including supply of all material, labour and T&P etc. required proper completion of work |
| 2 | Earth work in filling upto 5km distance including supply of all material, labour and T&P etc. required proper completion of work |
| 3 | Concrete in 1:4:8 with cement, fine sand and brick ballast of 4cm guage including supply of all material,labour and T&P etc required for proper completion of work |
| 4 | Cement concrete with 4cm gauge approved stone ballast coarse, sand and cement in proporation of 4:2.1 bul 2cm gauge stone grite instead of 4cm gauge stone ballast including supply of all metarial, labour and T&P etc. for proper completion of word. As per S.I. No.-279A CH.- 05 |
| 5 | RCC work in 1:1.5:3 with cement, coarse sand and stone gritt of 2cm guage in raft foundation including supply of all material,labour and T&P etc required for proper completion of work |
| 6 | RCC work in 1:1.5:3 with cement, coarse sand and stone gritt of 2cm guage in plinth beam, tie beamincluding supply of all material,labour and T&P etc required for proper completion of work |
| 7 | RCC work in 1:1.5:3 with cement, coarse sand and stone gritt of 2cm guage in column including supply of all material,labour and T&P etc required for proper completion of work |
| 8 | RCC work in 1:1.5:3 with cement, coarse sand and stone gritt of 2cm guage in suspended floor slab includng supply of all material,labour and T&P etc required for proper completion of work |
| 9 | Mild steel or iron work such as reinforced including supply of all material,labour and T&P etc required for proper completion of work |
| 10 | M-150 brick work in 1:6 with One part cement and Three part fine sand of 1.25 FM mortar in foundation i/c cutting neccesary and moulding of brick including supply of all materials, labour & T&P |
| 11 | M-150 brick work in 1:6 with One part cement and Three part fine sand of 1.25 FM mortar in superstructure i/c cutting neccesary and moulding of brick including supply of all materials, labour & T&P |
| 12 | 12mm thick palaster in 1:4 with cement, coarse sand mortar incliding supply of all material, labour and T&P etc. required for proper completion of work |
| 13 | Providing and laying brick coba 12mm thick laid with M-150 class brick bat coba 7.50cm thick with gap of 15mm to each other over 20mm thick base of cement mortar 1:4 cement and coarse sand mixed with water proofing compund spreading cement slurry with top mashed false square 30cm x 30cm and side wall parapet shall be mono tythic plaster wall upto 30cm higher including supply of all material, labour and T&P etc required for proper completion of the work |
| 14 | Finishing wall with waterproof cement paint apex weather coat approved brand including supply of all material,labour and T&P etc required for proper completion of work |
| 15 | Mild steel or iron work such as trusses, purline including supply of all material,labour and T&P etc required for proper completion of work |
| 16 | Applying two coat enaimel paint over priming coat on wood or steer and other metal surface including supply of all material,labour and T&P etc required for proper completion of work |
| 17 | Supply and fixing corrugated GS sheet in 24 BG roofing including screw in position including supply of all material,labour and T&P etc required for proper completion of work |
| 18 | Supply and fixing 10cm dai of PVC pipe 6kg/sqcm pressure |
| 19 | ADD GST @18% |