Annual Rate Contract For Misc. Civil Work In Gandhinagar, Sabarkantha, & Arvalli District; 1 Demolition including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift. (i) R.C.C. work CMT 35.00 1,057.85 37,024.88 2 Dismentling doors, windows, ventilators etc. (wood or steel) shutters including chowkhats architraves, holdfasts and other attachment etc. complete and stacking them within all lead and lift.(i) Not exceeding 3 Sq.M. in area. EACH 30.00 187.71 5,631.26 3 Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(B) Loose or Soft soil CMT 30.00 117.26 3,517.83 4 Providing and laying cement concrete 1:4:8 (1- Cement : 4- coarse sand : 8- hand broken stone aggregates 40 mm nominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth (upto 10 ton) CMT 30.00 2,670.35 80,110.47 5 Providing & Laying cement concrete M-200 and curing comp. incl. the cost of form work but exl. The cost of reinforcement for reinforced work in flooring slabs and curing incl. cost of form work. Compaction and finishing of cement concrete road by trimix process incl. of labour chardes for the trimix vaccum dewatering process on cement concrete road surface by using vaccum dewatering pump, surface water floater, surface vibrator icnl. channelling & making grooves and rough finish to surface by providing expansion joints, contraction per specification. As Per R.A. CMT 70.00 6,310.09 4,41,706.03 6 Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./ Sq.Cm. in foundation and plinth in Cement Mortar 1:5 (1- Cement : 5 - fine sand) (B) Conventional (upto 10 ton) CMT 15.00 4,051.55 60,773.32 7 20mm thick sand faced cement plaster on walls upto height 10 metres above ground level consisting of 12mm thick backing coat of C.M. 1:3 (1-cement : 3-sand) and 8mm thick finishing coat of C.M. 1:1 (1- cement : 1-sand) etc. complete. SMT 400.00 300.66 1,20,262.72 8 Filling in plinth with sand under floors includingwatering ramming, consolidating and dressing complete CMT 50.00 460.09 23,004.27 9 Filling in foundation and plinth with murrum or selected soil in layers of 20cm. thickness including watering, ramming and consolidating etc. complete. CMT 50.00 265.60 13,279.99 10 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density. (i) For 45 to 63 mm size metal and Lead 60km. (As Per R.A) CMT 1,000.00 1,431.13 14,31,129.60 11 Rolling and comsolidation of soling including filling in depression which occur during the process, with power roler 8 tonne to 12 tonne SMT 1,000.00 22.36 22,361.40 12 Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 60mm thick with grade of concrete M300 pnumatic compressed / vibrated mechanically and as per approved design Confirming to IS 15658 2006 including 35 mm Sand layer for levelling and filling the joint with sand in proper line and level as per guidlines of IRC : SP 63-2018 etc. Complete. SMT 60.00 686.87 41,212.24 13 Providing and fixing Fly proof galvanised M.S. wire gauge of I.S.l gauge designation 85 G. with wire of dia.0.56 mm to windows and celevating windows including 60 x 20mm beading of teak wood. SMT 50.00 669.94 33,497.16 14 Providing cement vata (10cm. x 10 cm. size) quarter round in cement mortar 1:1 including neat cement finishing, watering etc. complete. RMT 600.00 23.68 14,210.70 15 Providing laying and jointing in true line and level 25mm dia. U.P.V.C. Pipe ( SCH- 40) for cold water including fittings as approved by Engineer In Charge. Pipe shall be fixed on the wall with the help of clamp at every two metre C/C or shall be concealed as directed including necessary fittings etc. including testing of pipe and joints and fixing the same with adhesive solvent, including cost of all materials. RMT 25.00 91.84 2,295.98 ,..... more in document