|
| 1 | Supply Item |
| 2 | CROSS ARM HOLDING CLAMP PCC POLE W/O N/B(As per Specification of RESPO & UPCL) |
| 3 | PG CLAMP 95-95 SQ.mm. |
| 4 | STAY CLAMP WITH N&B PCC POLE 8.5MTR |
| 5 | EARTH WIRE CLAMP FOR PCC POLE WITH N/B |
| 6 | EARTH WIRE CLAMP FOR SP-55 WITH N/B |
| 7 | PP & CLAMP WITH N&B ST POLE SP-55 |
| 8 | SUSPENSION CLAMP WITH EYE HOOK |
| 9 | DOUBLE POLE CLAMPS WITH N/B FOR PCC POLE |
| 10 | DOUBLE POLE CLAMPS WITH N/B FOR SP-55 |
| 11 | MS CLAMP FOR DEAD END CLAMP WITH N&B |
| 12 | MS CLAMP PCC WITH N/B FOR SUSP.CLAMP |
| 13 | Dead End Clamp with I Hook |
| 14 | STAY INSULATOR |
| 15 | DANGER BOARD |
| 16 | IPC for 120sq. mm to 120 sq mm |
| 17 | 11 KV Fuse Set |
| 18 | MS Clamp with N&B for Suspension Clamp |
| 19 | MS Clamp withN&B for PCC DeadEnd Clamp |
| 20 | STAY CLAMP FOR SP-55 WITH NUT & BOLT |
| 21 | LT Fuse Set With Fuse Wire |
| 22 | AL. CRIMPING TYPE LUGS 120 SQ.mm |
| 23 | AL CRIMPING TYPE LUGS 400 SQ. mm |
| 24 | DTR Installation Work |
| 25 | CHEMICAL EARTHING |
| 26 | ERECTION OF EARTHING ROD |
| 27 | FABRICATION OF STEEL |
| 28 | EXCAVATION OF PIT FOR STAY SET |
| 29 | ERECTION OF LT STAY SET |
| 30 | ERECTION OF 11 KV STAY SET |
| 31 | GROUTING OF STAY SET |
| 32 | EXCAVATION OF PIT FOR POLE |
| 33 | ERECTION OF SINGLE PCC POLE |
| 34 | ERECTION OF SINGLE SP-55 POLE |
| 35 | ERECTION OF PCC DOUBLE POLE |
| 36 | ERECTION OF SP-55 DOUBLE POLE |
| 37 | GROUTING OF POLE |
| 38 | MUFFING OF POLE |
| 39 | INST. OF 250 KVA DTR ON POLE STRUCTURE |
| 40 | INST. OF 100 KVA DTR ON POLE STRUCTURE |
| 41 | INST. OF 63 KVA DTR ON POLE STRUCTURE |
| 42 | FIXING OF FUSE SET |
| 43 | FIXING OF LT FUSE SET |
| 44 | LAYING OF WEASEL CONDUCTOR IN HT LINE |
| 45 | CARTAGE PCC POLE, 21-50 KM |
| 46 | CARTAGE SP-55 POLE, 21-50 KM |
| 47 | CARTAGE OF PETTY MATERIAL,21-50 KM |
| 48 | CARTAGE OF 63 KVA DTR, 21-50 KM |
| 49 | CARTAGE OF 100 KVA DTR, 21-50 KM |
| 50 | CARTAGE OF 250 KVA DTR, 21-50 KM |
| 51 | HEADLOAD CARTAGE PCC POLE(0-1 KM) |
| 52 | HEADLOAD CARTAGE SP-55 POLE(0-1 KM) |
| 53 | HEADLOAD CARTAGE OF MATERIAL(0-1 KM) |
| 54 | HEADLOAD CARTAGE OF 63 KVA DTR(0-1 KM) |
| 55 | HEADLOAD CARTAGE OF 100 KVA DTR(0-1 KM) |
| 56 | HEADLOAD CARTAGE OF 250 KVA DTR(0-1 KM) |
| 57 | Laying of LT XLPE ABC 3X95+1X70 Sq.mm |
| 58 | Resagging of LT AB Cable |
| 59 | INST. OF DANGER BOARD/NUMBER PLATE |
| 60 | Laying & Fixing LT XLPE Cable |