| 1 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.(a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. |
| 2 | Extra rate over Item Nos.1 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres.01 (One) no.extra Lead |
| 3 | 2 (Two) nos.Extra Lead |
| 4 | 3 (Three) Nos.Extra Lead |
| 5 | Extra rate over Item Nos.1 for all kinds of soil for every additional lift of 1.50 metre or part thereof beyond the initial lift of 1.50 metre. 1 (one) no. extra Lift. |
| 6 | 2 nos. (Two) extra Lift. |
| 7 | Earthwork in re-excavation / silt clearance in drainage channel in all kinds of soil including sludge, slush mixed with all sorts of industrial wastes and municipal garbages, polypacks, carcasses, small khatal effluents, night soil etc. by mathor labour as may be necessary and depositing the same in places as directed by the Engineer-in-charge , in such a manner, without causing much hindrance to traffic and posing health hazard and making arrangement to maintain the site in workable condition and rough dressing when dry including making arrangement of bailing out of any seepage water and removal of sand orsoil blown from underneath, removal of khatal, temporary latrines, clearing and removing all kinds of semi compact masses formed by water hyacinth, jungles up to 30 cm girth, and burning them to ashes or removing outside Government land in conformity with the Municipal rules, including shoring shuttering as required, nicking out lines etc.(Measurement : Pre-work and Post-work level section. Pre- work section to be taken after removal of waterhyacinthandallotherfloating materials etc.)B) Beyond 1.00 km and upto 2.00 km |
| 8 | Earth work in excavation of foundation trenches drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. |
| 9 | Earth work in filling in foundation trenches or plinthwith good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layercomplete. (Payment to be made on the basis ofmeasurement of finished quantity of work)(a) With earth obtained from excavation of foundation. |
| 10 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.(i) Pakur Variety |
| 11 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.a) Pakur Variety |
| 12 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(f) 25 mm to 30 mm shuttering without staging in foundation. |
| 13 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m(i) Tor steel/Mild SteelI. SAIL/ TATA/RINL |
| 14 | Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge. |
| 15 | Pre cast cement concrete blocks or lining units as per designed section and specification in nominal mix proportion 1:1.5:3 (corresponding to M20 grade) with well graded 20 mm down stone metal aggregate, including dressing, ramming, shuttering, finishing the surface by trowel without adding any additional cement and sand mortar, curing, transporting and laying the blocks or lining units at work site in position, over sand cushion filter, with cold paper joints between the adjacent units having gap varying from 0 to 5 mm as tolerance with all leads and ifts, including supply and carriage of all materials complete. Stone Aggregate of Pakur or Rajmahal or broken stone of North Bengal varieties. |
| 16 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.(a) Depth up to 150 mm. |
| 17 | Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification. |
| 18 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).(ii) For Construction of Sub Base by consolidating Laterite (90 mm to 45 mm): |
| 19 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. |
| 20 | Turfing with chorkata or durba grass sods 5 cm. to 8 cm. thick in slope, crest berm etc. of embankments, canals and drainage channels etc. within a lead of 150 metre and all lifts including fine dressing, watering, ramming, guarding etc. complete. (sods will have to be arranged by the contractor at his own cost. Payment to be made on the grown grass only). |