Probable Items With Approximate Quantities For The Smart School At Oodlabari T.E. Primary School, Under Mal Development Block, District Japaiguri.- 1 (Item No. 8, Page No. 11 of PWD Building Schedule (2017) (3rd Corrigendum)Taking out carefully G.C.I. or C.I. or asbestossheets (including ridges etc.) from roof or wall after unscrewing bolts, nuts, screws etc.and stacking the material at site as directed. 2 (Item No. 4(b), Page No. 24 of PWD Building Schedule (2017) (3rd Corrigendum)Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.i) NB Variety 3 (Page No. 15, Item No. 7(b),of PWD Building Schedule (2017) (3rd Corrigendum)Brick work with 1st class bricks in cement mortar (1:4)(b) In superstructure, ground floor 4 (Item No. 16, Page No. 016 of PWD Building Schedule (2017)125 mm. thick brick work with 1st class bricks in cement mortar (1:4) inground floor. IN GROUND FLOOR 5 (Page No. 66 ,Item No. 36 (I) (A) of PWD Building Schedule (2017) (3rd Corrigendum)Supplying and laying true to line and level vitrified tiles of approved brand (size not less than 600 mm X 600 mm X 10 mm thick) in floor, skirting etc. set in 20 mm sand cement mortar (1:4) and 2 mm thick cement slurry back side of tiles using cement @ 2.91Kg./sqM or using polymerised adhesive(6 mm thick layer applied directly over finished artificial stone floor/Mosaic etc without any backing course) laid after application slurry using 1.75 Kg of cement per sqM below mortar only, joints grouted with admixture of white cement and colouring pigment to match with colour of tiles / epoxygrout materials of approved make as directed and removal of wax coating of top surface of tiles with warm water and polishing the tiles using soft and dry cloth upto mirror finish complete including the cost of materials, labour and all other incidental charges complete true to the manufacturersspecification and direction of Engineer-in-Charge. (White cement, synthetic adhesive and grout material to be supplied by the contrr]e)(I) With application slurry @1.75 kg/ Sq.m, 20 mm sandcement mortar (1:4) & 2 mm thick cement slurry at back sideof tiles, 0.2 kg/ Sq.m white cement for joint filling withpigment.B) Light ColourIN GROUND FLOOR 6 (Page No. 189, Item No. II(b),of PWD Building Schedule (2017) (3rd Corrigendum)Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar(a) 20 mm thick plasterIN GROUND FLOOR 7 (b) 15 mm thick plaster 8 (Page No. 198 ,Item No. 5of PWD Building Schedule (2017)Rendering the Surface of walls and ceiling with White Cement base WATER PROOF wall putty of approved make & brand.(1.5 mm thick)IN GROUND FLOOR 9 (Page No. 195 ,Item No. 7of PWD Building Schedule (2017)Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturers specification and as per direction of the EIC. (In Ground Floor)(b) Two Coatsii) Solvent based interior grade Acrylic Primer 10 (Page No. 194 ,Item No. 1(b)of PWD Building Schedule (2017)White washing including cleaning and smoothening surface thoroughly. (iii) Two coats.(b) Two coats (to be done on specific instruction)IN GROUND FLOOR 11 (Page No. 197 ,Item No. 17(c) (i) of PWD Building Schedule (2017)Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturers specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.In Ground floor (Two Coat)c) Super Protective 100% Acrylic Emulsion 12 (Page No. 104 ,Item No. 13 (a) (ii) of PWD Building Schedule (2017)(a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor.(i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr. IN GROUND FLOOR 13 (Page No. 114 ,Item No. 1 (d) of PWD Building Schedule (2017)Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals).(d) Sal : LocalIN GROUND FLOOR 14 (Page No. 198 ,Item No. 5of PWD Building Schedule (2017)Panel shutters of door and window, as per design (each panel consisting of singleplank without joint), including fitting and fixing the same in position butexcluding the cost of hinge and other fittings.In ground floor.(iii) 35mm thick shutters with 19mm thick panel of size 30 to 45 cm.(a) Ordinary Teak WoodIN GROUND FLOOR 15 (Item No. 5 iv, Page No. 140 of PWD Building Schedule (2017)Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark.(iv) 75mm. X 47mm. X 1.70mm. 16 (Item No. iv(c), Page No. 140 of PWD Building Schedule (2017)Supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar, end bifurcated with necessary screws etc. by cement concrete(1:2:4) as per direction. (Cost of concrete will be paid separately)(c) 40mm X 6mm, 125mm 17 (Item No. 5(b), Page No. 242 of PWD Building Schedule (2017)Supplying concealed type heavy duty PVC headed aluminium tower boltfor double leaf doors as per approved make and brand as per direction ofEngineer-in-Charge. 18 (Item No. 10(b), Page No. 141 of PWD Building Schedule (2017)Iron hasp bolt of approved quality fitted and fixed complete (oxidised) with 16mm dia rod with centre bolt and round fitting. (b) 250mm long. 19 ( Page No. 141 Item No. 7 b of PWD Building Schedule (2017)Iron catch hook of approved quality fitted and fixed to shutter and chowkat.(b) 6mm dia x 225mm long 20 (Item No. 30(a)(ii), Page No. 145 of PWD Building Schedule (2017)Anodised aliminium D-type handle of approved quality manufactured fromextruded section conforming to I.S. specification (I.S. 230/72) fitted and fixedcomplete:(ii) 100 mm grip x 10 mm dia rod 21 (Item No. 1(b), Page No. 200 of PWD Building Schedule (2017)Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.IN GROUND FLOOR 22 ( Page No. 200 ,Item No. 1(a) of PWD Building Schedule (2017)(a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.IN GROUND FLOOR 23 (Page No. 200,Item No. 2(A)IV,of PWD Building Schedule (2017)Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On timber or plastered surface :(iv) Two coats (with any shade except white)IN GROUND FLOOR 24 (Page No. 201 Item No. 3B(b) of PWD Building Schedule (2017)Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (b) On steel or other metal surface :(iv) Two coats (with any shade except white)IN GROUND FLOOR 25 (Item No. 9, Page No. 81 of PWD Building Schedule (2017)Galvanised corrugated iron sheet work (excluding the supporting frame work) fitted and fixed with 10 mm. dia J or L hook-bolts, limpet and bitumen washers and putty complete with 150 mm. end lap and one corrugation minimum side lap. (Payment to be made on area of finished work)(GCI sheet to be supplied by contractor)b) With 0.60 mm thick sheet 26 (Page No. 165 ,Item No. 17 (I) (B) of PWD Building Schedule (2017) (3rd Corrigendum)M.F. suspended ceiling made with 12.5 mm thick Gypsum plaster board including G.I. perimeter channel of 0.55 mm flush (having two flanges 20 mm and 30 mm respectively and web 27 mm ) along with perimeter of ceiling with G.I. intermediate channel of 0.9 mm thick size 45 mmx15mm placed at 750 mm c/c with G.I. ceiling angle of size 25 mmx10mmx0.55 mm thick fixed to the ceilingwith G.I. Cleat and steel expansion fastener ceiling section 0.55 mm thick of size 51.50 mmx26mm fixed to the intermediate channels with the help of connecting clip and in the direction of perpendicular to the intermediate channel of 300 mm c/c 12.5 mm thick Gypsum plastered board are to be fixed under ceiling section as above by machine screws. The boards are to be joined and finished with jointing compound, paper tape and application of top coat etc. as per the direction ofEngineer-in-charge. (The rate includes of cost of all materials including taxes, cost of accessories, fittings and fixtures, scaffolding and labour charges etc. complete) 27 (Page No. 235 No. 1 (II)(A)(l) of PWD Building Schedule (2017)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - InCharge. (Payment will be made on finished length of the work).I) Natural whitea) 2- track sliding window 28 ii) Top frameSide frame 29 (Page No. 235 No. 1(A)(II)(d)of PWD Building Schedule (2017)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISIembossed / certified make and brand as per direction of Engineer - InCharge. (Payment will be made on finished length of the work).d) Shutter for all track sliding windowI) Natural whitei) Bottom & Top member 30 ii) Style side member 31 iii) Interlock member. 32 (Page No. 243 No. 9 (of PWD Building Schedule (2017)Supplying bubble free float glass of approved make and brandconforming to IS: 2835-1987.v) 6mm thick clear glass 33 (Page No. 242,Item No. 8 (i)(a) of PWD Building Schedule (2017)Supplying EPDM gusket of approved make and brand as per direction ofEngineer in charge.i) For sliding windows a) T shaped EPDM gasket for frames. 34 (Page No. 239 , Item No. 2,of PWD Building Schedule (2017)Labour charge for fabrication and installation of composite door, window, partitions made from annodized extruded alloy aluminium sections for the following units:-ii ) 3 /4 track sliding window.i ) 2 track sliding window 35 (Page No. 242,Item No. 7of PWD Building Schedule (2017)Supplying maruti lock (100mm) 36 Suplying and Installation of Alloy Steel Study Chair With Cushion & Writing PadDimension 20D x 10W x 10Hcentimeter (Payment will made as per quotation) 37 Supply Fitting Fixing CC TV 8 Chennel (Payment will made as per quotation) 38 Monitor Set (Payment will made as per quotation) 39 Broadband installation (Payment will made as per quotation) 40 Add Electrification work 41 Add:- GST @ 18% 42 Add:- Cess @ 1%