| 1 | CARRIAGE OF 11MTR. STP /8.5 MTR PCC POLE FROM ESCHASARI TO DIFFERENT CONSUMER WORK SIDE. |
| 2 | CARRIAGE OF LINE MATERIAL VIZ. CONDUCTOR ,11 KV XLPECABLE,AB CABLE, STAY ROD, EARTHING ROD, G I WIRE, STAY WIRE AND OTHER LINE MATERIAL. |
| 3 | ERRECTION OF 11MTR. STP / 8.5 MTR PCC POLE POLE WITH FIXING OF ALL ACCESSORIES INCLUDING IT\"S GRAUTING |
| 4 | ERECTION AND GRAUTING OF DOBLE POLE STRUCTURE WITH COMPLITE FITTING OF ALL ACCESSORIES. |
| 5 | CONSTRUCTION OF 11/.04/1O/25/63/100 KVA SUB. STATION COMPLITE INCLUDING THE FITTING OF ALL ACCESSORIES. |
| 6 | CARRIAGE OF 250/400 KVATRANFORMER FROM E.S.C.HASARI TOWORK SITE. |
| 7 | CARRIAGE OF 1O/16//25/63/100 KVA TRANFORMER FROM E.S.C.HASARI TOWORK SITE. |
| 8 | THE WORK OF PROPER PLACEMENT OF TRANSFORMER ON DOUBLE POLE / TRANSFORMER PLINTH. |
| 9 | DRILLING OF HOLE ON 11 KV X - ARM , TOP CHANNLE ,T-OFF,DROPER CHANNLE AND OTHER ACCESSORIES INCLUDING THE WORK OF ITS CARRIGE . |
| 10 | FIXING OF EARTHING ROD COMPLITE. |
| 11 | ERRECTION ANDGRAUTING OF STEY SET COMPLITE AS PER RESPO\". |
| 12 | PIT DIGGING OF HARD ROCKY/ DAMMAR/ RCC SURFACE ETC. |
| 13 | PAINTING OF 11 KV 11 MTR LONG STP WITH RED OXIDE/ SILVER OXIDE PAINT. |
| 14 | ERRECTION OF 11KV LINE FROM EXISTING 11KV LINE TO NEW CONSTRUCTED DOUBLE /SINGLE POLE STRUCTURE AT DIFFERENT PLACE\"S. |
| 15 | FIXING OF DANGER BOARD. |
| 16 | LAYING /FIXING OF LT P.V.C.CABLE INCLUDING THE WORK OF CRIMPING OF LUG\"S AND CONNECTION TO TANSFORMER /LINE. |
| 17 | GUARDING OF 11KV LINE WITH G.I WIRE,ANGLE AND NUT BOLT ETC. AS PER RESPO. |
| 18 | LAYING OF ACSR WEASEL / RABIT CONDUCTOR INCLUDING IT\"S SAGGING ,STRINGING , BINDING AND JUMPRING ETC. |
| 19 | LAYING OF ACSR RECOON/ DOG CONDUCTOR INCLUDING IT\"S SAGGING ,STRINGING , BINDING AND JUMPRING ETC. |
| 20 | LAYING OF AB CABLE OF SIZE 3X50/95/120 SQMM ON POLE . |
| 21 | INSTALLATION OF LT DISTRIBUTION BOX 3PH.ON POLE. |
| 22 | GIVING THE CONNECTION THROUGH INSTALLED DISTRIBUTION BOX . |
| 23 | LAYING OF 11 KV XLPE CABLE OF SIZE 3X25/35/70/120 SQMM ON POLE WITH THE HELP OF GI WIRE &UNDER THE SURFACE /CABLE TRINCH. |
| 24 | FIXING /MOUNTNING OF 11 KV TERMINATION KIT OF SIZE 3X25/35/70/120 SQMM . |
| 25 | CONSTRUCTION OFTRANFORMER PLINTH OF SIZE-5X5X4 FEET AS PERDIRECTION OF THE ENGINEER. WITH THE HELP OF BRIC,RIVER SAND & STONE BLAST INCLUDES THE COST OF LABOUR ,T&P PROVIDED BY THE CONTRACTOR FOR PROPER COMPLETION OF WORK. |
| 26 | FABRICATION AND FIXING OF SPECIAL TYPEH BRACKET MADE OF 100X50X5 MS CHANLE AND 50X50X5 MS ANGLE WITH NUT BOLT & CLAMPS ETC. |
| 27 | EARTHING OF DISTRIBUTION TRANSFORMER BY EARTHINGELECRODE BY DIGGING /DRILLING OF PIT APPROX. 10 FEET DEPTH AND INSERTING G.I.ELECRODE OF 50 MM DIA B GRADE, COMPLETE TO THE REQUIRMENT OF I.S.SPECIFICATION . ITS INCLUDE THE COST OF ALL MATERIAL , LABOUR, T&P PROVIDED BY THE CONTRACTOR FOR PROPER COMPLETION OF WORK. |
| 28 | TREE CHOPING |
| 29 | विधुत वितरण खंड झांसीके अंतर्गत बुंदेलखंड विकास निधि / सांसद निधि / विधायक निधि से पोषित बिधुतीकरणकार्यों की लागत एवं अन्य जानकारियों को प्रदर्शित करने हेतु लोहे की शीट से निर्मित साइन बोर्ड (3 x 2) को उपलब्ध कराने एवं बोर्ड की स्थापना करने हेतु कार्य |