|
| 1 | Fixing of watch tower including Balli, wooden Plank, T&P, Cartage, loading, unloading and labour etc. complete as per direction of Engineer-in-charge at Goverdhan Parikarma Marg. (For 11 Days) |
| 2 | Fixing of Two Row Baricading including Balli, rope, T&P, Cartage, loading, unloading and labour etc. complete as per direction of Engineer-in-charge/Police Dept. at Goverdhan Parikarma Marg.(For 11 Days) |
| 3 | Fixing of Three Row Baricading including Balli, rope, T&P, Cartage, loading, unloading and labour etc. complete as per direction of Engineer-in-charge/Police Dept. at Goverdhan Parikarma Marg.(For 11 Days) |
| 4 | Fixing of Barriers at different places to control traffic as per direction of Police Dept. (For 11 Days) |
| 5 | Fixing of Temporary Police Choki (Size 15\" x 15\") with water proof tent, chairs, tables, basket, jag etc. (For 11 Days) |
| 6 | Baricading of Kund for closed the gate. (For 11 Days) |
| 7 | Fixing of old wire mesh at Kunds and Gates etc. (For 11 Days) |
| 8 | Providing, laying spreading & compactingof granular sub-base by providing coarse graded (Gr-1) materials, spreading in uniform layers with Motor Grader on prepared surface on prepared surface, mixing by mix in placed method with Rotovator at OMC and compacting with in layers with smooth wheeled Vibratory Roller to achieve the desired density, complete as per MoRT&H clause 401 & as directed by Engineer Incharge including all machinery charges & including all labour, T&P etc required for proper completion of the work. |
| 9 | Supply and laying of fine sand on various metal road to facilitate pilgrims. |
| 10 | Hire Charges of J.C.B. Machine with Driver inclduing P.O.L etc. complete |
| 11 | Hire Charges of Road Roller with Driver inclduing P.O.L etc. complete |
| 12 | Earth work of Embankment with approved material obtained from Borrow-pits with all leads & lifts upto 8.00 K.M. distance, transporting to site, spreading, grading to required slope and compacting to meet requirements etc complete as per MoRT&H clause 305 (3.16) & as directed by Engineer Incharge including all machinery charges & including all labour, T&P etc required for proper completion of the work. |
| 13 | Pulverisation of 15cms hard Kachcha Goverdhan Parikrama Road into soft soil mass with the help of Ripper & Rotavator etc. complete including all machinery charges & including all labour, T&P etc. required for proper completion of work |