Tender For Construction Work Of Two Laboratory (Lab) Veranda In Sudarshan Degree College, Bansi Lalitpur. - Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)Above Plinth Lvl as SI No-5.2.2 2 Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources). Above Plinth Lvl as SI No-5.3 3 Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (Slab) as per SI No. 5.3 4 Steel reinforcement for R.C.C. work ready to use cut and bend rebars of approved make from factory/workshop to construction site including placing in position and binding all complete in Thermo-Mechanically Treated bars of grade Fe-500D or more. As per SI. No.- 5.22 B.1 5 Centering and shuttering including stutting, propping etc. and removal of form.Beam /Band as per SI- 5.9.5 6 Centering and shuttering including stutting, propping etc. and removal of form.Column as per SI- 5.9.6 7 Centering and shuttering including stutting, propping etc. and removal of form.Slab as per SI- 5.9.3 8 Providing And Fixing Of Sign Board At Site