| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. Including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l. |
| 2 | Providing coarse clean sand in filling In foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including\" cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement complacted volume). |
| 3 | Providing designation 75 B one brick flat soling joints filled with local sand Including cost of watering taxes royalty all complete as per building specification and direction of E/I. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 cement: 2 coarse sand (zone-III): 4 graded stone aggregate 20 mm nominal size) |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. All work up to plinth level 1:1.5:3(1 cement: 1. 5coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) |
| 6 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:\" 1:1½:3 (1 cement: l½ coarse sand (zone-Ill) : 3 eraded stone aggreeate 20 mmnominal size).\" |
| 7 | Reinforcedcementconcreteworkinbeams,suspendedfloors,roofshaving slope up to 1s· landings, balconies, shelves, chajjas, lintels, bands--do-do-- with 1:1.5:3 (1 cement: 1.5 coarsesand(zone-111) : 3 graded stone aggregate 20 mm nominal |
| 8 | Centering shuttering Including strutting, propping and removal for foundation, footing, basess of column, etc for mass concrete. |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for |
| 10 | Centering and shuttering for column ,pillars,pier-do-E/I. |
| 11 | Centering and shuttering for roof--do-do-E/I. |
| 12 | Providing designation 7S brlck work InC.M (1: 6) In foundation and plinth -do-do-direction of E/1. 2x8x8\"7\" x0\"10\"x1\"3\"= 143. 05 cft. 2x2.d7\"ll\"x0\"10\"x1\"3\"=74.67 cftTotal 217.72 cftProvldlng designation 75A brick work InC.M (1: 6) In foundation and pllnth with approved quality of dean coarse sand of F.M. 2 to 2.5 Including providing 10mm thick mortar, joints cost of screenlnJ materials rakln out Joints to 15mmdepth, etmlnc, taxes and royalty all complete as per buiJidJngspeciflcation and direction of E/I |
| 13 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4-do-do- E/1.2(81\"0\"+38\"4\")x0\"10\"=197.22 sft. Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand(zone-111) : 4 graded stone aggregate 20mm nominal size). |
| 14 | Earth filling infoundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earthobtainedfrom excavation offoundation trenches do-do- direction of E/1. |
| 15 | Earth filling infoundaion trenches and plinth in layers notexceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earthobtainedfromcutting do--do-- direction of E/1 |
| 16 | Providing designation 75B brick work in C.M. (1: 6) in superstructure with approved quality of clean coarse sandof F.M. 2 to 2.5 providing including 10mm thick mortar joints, cost of screening materials, raking outjoints to 15mm depth curing, taxes and royalty all completeis per building specification and direction of E/1. |
| 17 | Centering & shuttering for Chajja ---do---do-- E/1. |
| 18 | providing Tor steel reinforcement of 8mm dia rods as per approved design and drawing exclusive carriage of M.S. bars to work site,cutting, bending and binding with annealed wire with cost of the wire,5 removal pf rust, placing the rods In position all complete as perbuilding specification and direction of E/1. TMT Fe 500 (only valid for SAIL & TATA STEEL)8mm Dia bar |
| 19 | (a) 10mm {TMT coil Fe 500) (only valid for Tata (Tiscon), SAIL,JSPL,Electrosteel Steels Ltd. Bokaro and Vlzag (RINL)} |
| 20 | (b) 12 & 16mm {TMT coil Fe 500) (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL)}) |
| 21 | Providing 12mm cement plaster {1:6) with clean coarse sand of F.M.1.5 including screening, curing with all leads and lifts of water, caffolding taxes and royalty all complete as per building specificationand direction of E/1. |
| 22 | providing 6mm cement plaster (1:4) in celling with clean coarse sandF.M. 1.5 Including screening, curing with all leads and lifts of water, affolding taxes and royalty all complete as per building specificationd direction of E/1. |
| 23 | Providing and laying 25mm thick white makrana marble stone slab ooring of approved quality over 19mm thick base of lime mortar (1:1:1) (Lime putty: surkhl: coarse sand) laid and joined with white cement slurry including rubbing and polishing to granolithic finish with approved quality of carborandum stone including cost of curing, taxes and royalty all complete as per building specification anddirection of E/1. (ii) 300X600 mm size |
| 24 | Providing and laying 2.5mm thick white makrana marble tilesin risers of steps, skirting and pillers of approved quality over 12mm thick base of cement mortar (1:3) and jointed with white cement slurry including rubbing and polishing to granolithic finish with approved quality of carborandum stone including cost of curing, taxes and royalty all complete as per building specification and direction of E/1. |
| 25 | Supplying, fitting, and fixing M.S. Grill made of 20X6mm M.S. Flate as per approved design and drawing, properly fabricated with joints continuous fillet welded and finished smooth, carriage of grill to work site, hoisting as per building specification and direction of E/1. (where materials is not supplied by the deptt.) |
| 26 | Supplying, fitting and fixing collapsible gate of approved size and make properly fabricated with vertical double channels 20 x 10 x 2mm at 100mm centers and braced with M.S. flat diagonals 20 x 3mm with top and bottom rails of T.iron 40 x 40 x Gmm with 38mm dia steel pulleys complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of red lead paint, car riage, hoisting and taxes all complete as per building specification and direction of/I. |
| 27 | Providing two coats of plastic emulsion paint of approved shade and make over a coat of cement primer over new surface including preparing plastered surface by rubbing smooth with pumice stone or fine sand paper, applying putty wherever required, scaffolding washing of floor and taxes all complete as per building specificationand direction of E/1. |
| 28 | Providing two coat of painting with ready mixed paint of approved shade and make over steel surface including cleaning the surface throughly, scaffolding and taxes all after removing dirt including scales smokes, grease and sand papering including cost of scaffolding and taxes all complete as per building specification and direction ofE/1. |
| 29 | Providing 12mm thick water proof cement plaster {1:3) with clean coarse sand of F.M. 1.5 with S¾ cico or any other approved water proofing compound including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per buildingspecification and direction of E/1. |
| 30 | p/V and applying plaster of paris putty of 2mm thickness over plaster surface do-do- E/1. |
| 31 | P/v and applying white cement based·putty of av thl ckness 1mm of approved brand -do-do- E/1. |
| 32 | Finishing wall with premium acrylic smooth exterior paint -do-do- E/I |
| 33 | Cement +steel (lead3km ) |
| 34 | Sand( lead 5 km ) |
| 35 | Stone chips (lead 30 km ) |
| 36 | Bricks(lead 8 km) |
| 37 | Signboard and photography |
| 38 | ADD GST 18% |
| 39 | ADD 1% LABOUR CESS |