| 1 | Part - A ( Material)Following Material Supplied by the Contractor:- |
| 2 | LT Clamp |
| 3 | LT Shackle Insulator |
| 4 | Supply a of Copper L Piece for 250 KVA T/F |
| 5 | Supply a of Copper L Piece for 400 KVA T/F |
| 6 | Supply ofHDPE Pipe for laying of 11KV (As per requirement) |
| 7 | Aluminum Lug(Long Barrel) |
| 8 | Holding Clamp with Nut & Bolt |
| 9 | Fuse Set including channal |
| 10 | Nut & Bolt |
| 11 | LT Clamp with Nut & Bolt |
| 12 | Aluminum lug For 150 sqmm |
| 13 | Aluminum lug For 240 sqmm |
| 14 | Aluminum lug For 400 sqmm |
| 15 | Aluminum lug For 250 KVA T/F |
| 16 | Copper L Piece for 50x225x10 mm |
| 17 | Glad 63 mm dia |
| 18 | Aluminum lug For Different Size |
| 19 | Aluminum lug For 63 KVA T/F |
| 20 | The woek of safe carriage of the following material with loading/unloading from store centre Darshan Nagar to site of work. (Approx. Distance 0 to 20 Km.) |
| 21 | Safe cartaage of 8.5/9.0 Mtr. Long PCC Pole |
| 22 | Safe cartaage of 11.0/09 Mtr. Long ST Pole |
| 23 | ACSR Weasel Conductor |
| 24 | ACSR Dog Conductor |
| 25 | AB Cable (1x16+1x25) sqmm |
| 26 | AB Cable (3x50+1x35+1x16) sqmm |
| 27 | AB Cable (3x95+1x70+1x16) sqmm |
| 28 | AB Cable (3x120+1x95+1x16) sqmm |
| 29 | Transformer 25 KVA |
| 30 | Transformer 63 KVA |
| 31 | Transformer 100 KVA |
| 32 | Transformer 250 KVA |
| 33 | Transformer 400 KVA |
| 34 | Transformer 630 KVA |
| 35 | 11 KV Pilfer Proof Metring Cubical |
| 36 | 11 KV TVM Meter |
| 37 | Distribution Box Three Phase/Single Phase |
| 38 | 11 KV XLPE Cable 3x70 mm2 |
| 39 | 11 KV XLPE Cable 3x120 mm2 |
| 40 | 11 KV XLPE Cable 3x185 mm2 |
| 41 | XLPE Cable 3x300 mm2 |
| 42 | 11 KV outdoor Cable Jointing Kit 3x70/3x120/3x185/3x300 |
| 43 | 11 KV Indoor Cable Jointing Kit 3x70/3x120/3x185/3x300 |
| 44 | 11 KV Staight Through Cable Jointing Kit 3x70/3x120/3x185/3x300 |
| 45 | Other Line material i.e. cross arm/conductor/pin/ insulator/stay/earthing/cable Box etc. A.B. Cable |
| 46 | Dragging of PCC/ST pole as per RESPO Norms. |
| 47 | Fabrication and Erection of Single Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, Sand & Brick Ballast & including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. ( Cost of clamps borne by contractor) |
| 48 | Fabrication and Erection of Double Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, Sand & Brick Ballast & including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. ( Cost of clamps borne by contractor) |
| 49 | Grouting and Binding of Stay in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms. |
| 50 | Earthing of Poles as per RESPO Norms. |
| 51 | Stringing, Sagging, Binding and jumpering of ACSR Weasel as per RESSPO Norms. |
| 52 | Stringing, Sagging, Binding and jumpering of ACSR Dog as per RESSPO Norms. |
| 53 | Stringing, Sagging, Binding and jumpering of AB Cable Size (1x16+1x25)/ (3x50+1x35+1x16)/(3x95+1x70+1x16)/ (3x120+1x95+1x16) as per RESSPO Norms. |
| 54 | Mounting of 25 KVA Transformer as per RESSPO Norms. |
| 55 | Mounting of 63 KVA Transformer as per RESSPO Norms. |
| 56 | Mounting of 100 KVA Transformer as per RESSPO Norms. |
| 57 | Mounting of 250 KVA Transformer as per RESSPO Norms. |
| 58 | Mounting of 400 KVA Transformer as per RESSPO Norms. |
| 59 | Mounting of 630 KVA Transformer as per RESSPO Norms. |
| 60 | Installation and Fixing of 11 KV Cable Jointing Kit Outdoor 3x70/3x120/3x185/3x300 mm2 Indoor XLPE Cable Box. |
| 61 | Installation and Fixing of 11 KV Cable Jointing Kit Indoor 3x70/3x120/3x185/3x300 mm2 Indoor XLPE Cable Box. |
| 62 | Installation and Fixing of 11 KV Cable Jointing Kit Staight Through 3x70/3x120/3x185/3x300 mm2 Indoor XLPE Cable Box. |
| 63 | Laying of underground Single Circuit 11 KV 3x70/3x120/3x185/3x300 sq mm by trunch XLPE Cable in Normal Soil by digging of trench 1050 mm deep, 500 mm wide including supply of required material as fine sand, Ist class bricks as per norms. (All the material will be supplied by the contractor except 11 KV XLPE cable) |
| 64 | Laying of underground Double Circuit 11 KV 3x70/3x120/3x185/3x300 sq mm by trunch XLPE Cable in Normal Soil by digging of trench 1050 mm deep, 750 mm wide including supply of required material as fine sand, Ist class bricks as per norms. (All the material will be supplied by the contractor except 11 KV XLPE cable) |
| 65 | Laying ofHDPE Pipe laying of 11KV, 3x70/3x/120/3x185Sq.mm, XLPE Cable with HDD (trenchless) method including cable laying. |
| 66 | Hanaging, Hosting & clamping of G.I. Pipe, channel, nut & Bolt 3x70/3x120/3x185/3x300 mm2 XLPE 11 KV cable as per RESSPO Norms (cost of all accessories will be borne by contracotr) |
| 67 | Road Restroration charge Kaccha/Pakka as per PESSPO Norms |
| 68 | Installation of 11 KV Pilfer Proof Metering Cubical |
| 69 | Installation of 11 KV TVM Meter |
| 70 | Earthing by way of boring and lowering of \"B\" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T n P etc. complete in all respect . (all the material will be supplied by the contractor.) |
| 71 | Camecial Type Earthing of Transformer as per RESSPo Norms. (all Material is Provided by Contractor) |
| 72 | Constructionof Plinth of 250/400 KVA Transformer including excavation of foundation, base concreting of 1:6:12 (Cement mortar of Ratio 1:4 foundation, CC in 1:4:8 ratio (Cement fine sand and brick ballast ) and RCC work with ratio 1:2:4 Cement, Coarse sand and Stone Grit of 20 mm gause as per RESSPO norms |
| 73 | Fencing of Transformer Plinth 250/400 KVAwith the help of wire mesh/Barbed wire after grouting proper size of angle as per RESSPO Norms. Inclusive of all material such as Wiremesh/Barbed Wire, Angle Flats, Nut Bolts etc. |
| 74 | Erection & Commissioning of Single/Three Phase Distribution Box with help of clamps (Cost of clamp & Bolt & Nut shall be borne by contactor) as per Norms. |
| 75 | Supply and Installation of G.I. Pipe 6\" dia. |
| 76 | Supply and Installation of Tainless Unit. |
| 77 | Rect. Back old and used Material ST Pole/Conductor/AB Cable etc. |