|
| 1 | M&L for applying one coat of white wash on old decorated wall surfaces including removing of grass, creepes, vegetation growth and preparation of old surface etc complete all as specified and as directed. |
| 2 | All per item No 1.00 (here-in-before) but on on ceiling. |
| 3 | M&L preparation of old decorated plastered surface of wall & applying one coat of cement base paint upto 3 storeyed bldg complete all as specified and as directed. |
| 4 | M&Lforcomplete removal of existing treatement on old plastered surface of wall & applying two coats of cement base paint over a coat of cement primer upto 3 storeyed bldg complete all as specified and as directed. |
| 5 | M&Lforcomplete removal of existing treatement on old plastered surface of wall & applying two coats of oil bound distemper over a coat ofprimercomplete all as specified and as directed. |
| 6 | M&L for complete removal of existing treatment of old decorated surfaces ofwall and applying two coats of oil emulsion distemper over a coat of primer over and including coat of wall care putty(1.5mm thick in two separate layers) for obtained smoothness of wall surfaces complete all as specified and as directed. |
| 7 | M&L for applying one coat of oil bound distemper on old surfaces of wall including preparation of surfaces complete all as specified and as directed. |
| 8 | M&L forrendering 15 mm thick on brick work or concrete surfaces in cement mortar (1:6) finished even and fair (without using extra cement) including taking down old plaster complete all as specified and as directed. |
| 9 | M&L for rendering 15 mm thick on brick work or concrete surfaces in cement mortar (1:4) using water proofing compound (as per manufacturer instruction) finished even and smooth (without using extra cement) including taking down old plaster upto 3 storeyed bldg including necessary scaffoldingcomplete all as specified and as directed. Note:-WPC will be measured and paid separately |
| 10 | Supply only Integralwater proofing compound complete all as specified and as directed. |
| 11 | M&L for preparation of new plastered surfaces ofwall and applying two coats of oil emulsion distemper over a coat of primer over and including coat of wall care putty (1.5mm thick in two separate layers) on wall surfaces complete all as specified and directed. |
| 12 | M&L for preparation of new plastered surfaces ofwall and applying two coats of oil emulsion distemper over and including a coat of primeron wall surfaces complete all as specified and as directed. |
| 13 | M&L for applying two coats of cement base paint to newly plastered surfaces of wall including preparation of surface complete all as specified and as directed. |
| 14 | M&L for preparation of newly plastered surfaces ofwall, and applyingtwo coats of exterior weather paint overa coat of primerover and including coat of wall care putty (1.5mm thick in two separate layers) onwall surface complete all as specified and as directed |
| 15 | M&L forapplying one coat of synthetic enamel paint (1st grade) on old decorated wooden surfaces of any description including preparation of old wooden surfaces area, over 10cm width & girth complete all as specified and as directed. |
| 16 | M&L forapplying one coat of synthetic enamel paint (1st grade) on old decorated steel surfaces of any description including preparation of old steel surfaces area, over 10cm width & girth complete all as specified and as directed. |
| 17 | M&L for complete removal of existing treatment of old decorated surfaces ofwall and applying two coats of exterior weather paint over a coat of primer,over and including a coat of putty (1.5mm thick in two separate layers)onwall surface upto 3 storeyed bldg complete all as specified and directed. |
| 18 | M&L for complete removal of existing treatment of old decorated surfaces ofwall and applying two coats of exterior weather proof paint over one coat of primeronwall surface upto 3 storeyed bldg complete all as specified and as directed. |
| 19 | M & L applying one coat of weather coat acrylic exterior paint on old treatedsurfaces of wall/floor including preparation ofsurfaces upto 3 storeyed bldg complete all as specified and as directed. |