| 1 | Notes:-(i) 50 percent nonperishable items of the work shall be deposited by the L1 bidder within 30 days after placing of work order.(ii) The critical path network shall be submitted by L1 bidder immediately after the acceptance of tender and approved by GE.(iii) The bidders must ensure to visit the site, check relevant documents and makes of materials required to be incorporated under the subject from concern Engineer-in-Charge.(iv) The unserviceable material obtained under the schedule of credit shall be handed over to the contractor by the Engineer-in-Charge on a proper gate pass.(v) In case of non-availability of any make mentioned under list of Makes, the L1 Bidder shall obtain non-availability / non-manufacturing certificate from the concern OEM / authorised dealers and submitted to Accepting Officer, the L1 bidder may be incorporated makes as approved by HQ CE SWC Jaipur / HQ CE BTZ in the works after prior approval of Accepting Officer.(vi) L1 Bidder shall produce E-way bill alongwith test certificate from OEM / manufacturer for costly items / major items of amount above Rs 50,000/- along with RAR’s and Final Bill.(vii) L1 Bidder shall be maintained an album containing Photos of all the material brought at site and each stage wise work progress and kept at site. Same shall be deposited in Engineer-in-Charge office after completion of work.(viii) Suffficient tradesman, Labours needs should be employed by the bidder on daily basis and as required by Engineer-in-Charge. (ix) Main Items and fixtures, base materials shall be from the same manufacturer.(x) The cost of all the above provisions shall be deemed to be included in the quoted rate of bidder, nothing extra shall be paid to the bidder. |
| 2 | Taking down cement plaster or cement lime plaster on stone surface/brick surfaces of walls including raking out joints hacking for key scrubbing down with water etc complete all as specified and directed by Engineer-in-Charge. |
| 3 | M&L for 15mm thick rendering in two layer on fair faces of brick masonry or concrete surfaces of walls consisting of 1st layer of 10mm thick plaster in CM 1:4 and 2nd layer (setting coat or top layer) of 5 mm thick plaster in CM 1:4 mixed with water proofing compound (ISI marked) @ 3% by weight of cement or as per manufacturer’s instructions, finished fair & even, complete, all as specified.Note : - Supply only water proofing compound shall be measured and paid for separately. |
| 4 | Supply only integral water proofing compound |
| 5 | M&L for 10mm thick rendering in cement mortar (1:6) on fair faced or on other than fair face surface of brick masonary or concrete surface of walls, finished even & smooth without using extra cement complete all as specified and directed by Engineer-in-Charge. |
| 6 | M&L for 5mm thick rendering in cement mortar (1:3) on brick or concrete surface of ceiling, finished even & smooth without using extra cement complete all as specified and directed by Engineer-in-Charge. |
| 7 | M&L for removing loose ceiling plaster completely, cleaning and dripping mortars and curing of effected surface area, cleaning well expossed reinforcement and applying two coats of anti-corrosive paint to it, supply and fixing mild steel XPM mesh of size 25mm x 25mm (wire dia min. 2mm) to the effected ceiling surface either by welding with exposed reinforcement or by stapling nails or screw or tie with reinforcement, applying cement slury and 25mm thick microphone of 1:1:1 using 6mm graded aggregate and cuting it for 3 days and then making well finish the surface using cement mortar 1:3 complete all as specified and directed by Engineer-in-charge. |
| 8 | M&L for rough cast finish plaster with a mixture consisting of crushed stone or fine gravel aggregate mixed with coarse sand and cement in the ratio of 1:1:1 over & including 12mm thick rendering in cement mortar 1:3 on fair faces of brick masonry or concrete surfaces of walls complete all as specified and directed by Engineer-in-Charge. |
| 9 | M&L for preparation of old decorated, plastered or pointed surfaces of wall by brooming down or steel wire brushing,scrapping down smoke soot moulds, moss and efflorescent, salts and treating oil & greasy spots etc and applying one coat of white wash complete all as specified & directed by Engineer-in-Charge. |
| 10 | M&L for preparation of old decorated, plastered or pointed surfaces of wall by brooming down or steel wire brushing,scrapping down smoke soot moulds, moss and efflorescent, salts and treating oil & greasy spots etc and applying two coats of white wash complete all as specified & directed by Engineer-in-Charge. |
| 11 | M&L for preparation of newly plastered surfaces of wall and applying three coats of white wash complete all as specified and directed by Engineer-in-Charge. |
| 12 | M&L for preparation of old decorated, plastered or pointed surfaces of ceiling by brooming down or steel wire brushing,scrapping down smoke soot moulds, moss and efflorescent, salts and treating oil & greasy spots etc and applying one coat of white wash complete all as specified & directed by Engineer-in-Charge. |
| 13 | M&L for preparation of old decorated, plastered or pointed surfaces of ceiling by brooming down or steel wire brushing,scrapping down smoke soot moulds, moss and efflorescent, salts and treating oil & greasy spots etc and applying two coat of white wash complete all as specified & directed by Engineer-in-Charge. |
| 14 | M&L for preparation of newly plastered surfaces of ceiling and applying three coats of white wash complete all as specified and directed by Engineer-in-Charge. |
| 15 | M&L for preparation of old decorated, plastered or pointed surfaces of wall by brooming down or steel wire brushing,scrapping down smoke soot moulds, moss and efflorescent, salts and treating oil & greasy spots, washing, rubbing down and stopping of distempered surface, filling of cracks etc and applying one coat of oil bound distemper complete all as specified & directed by Engineer-in-Charge. |
| 16 | M&L for preparation of old decorated, plastered or pointed surfaces of wall by brooming down or steel wire brushing,scrapping down smoke soot moulds, moss and efflorescent, salts and treating oil & greasy spots, washing, rubbing down and stopping of distempered surface, filling of cracks etc and applying two coats of oil bound distemper complete all as specified & directed by Engineer-in-Charge. |
| 17 | M&L for preparation of newly decorated, plastered or pointed surfaces of wall by brooming down or steel wire brushing,scrapping down smoke soot moulds, moss and efflorescent, salts and treating oil & greasy spots, washing, rubbing down and stopping of distempered surface, filling of cracks etc and applying two coats of oil bound distemper over a 1 mm thick acrylic wall puttyover a coat of pirmer complete all as specified & directed by Engineer-in-Charge. |
| 18 | M&L for complete removal of old decorated, plastered or pointed surfaces of wall by brooming down or steel wire brushing,scrapping down smoke soot moulds, moss and efflorescent, salts and treating oil & greasy spots, washing, rubbing down and stopping of distempered surface, filling of cracks etc and applying two coats of oil bound distemper over a coat of 1 mm thick acrylic wall puttyover a coat of pirmer complete all as specified & directed by Engineer-in-Charge. |
| 19 | M&L for preparation of old decorated plastered or unplastered surfaces of walls by brooming down or steel wire brushing,scrapping down smoke soot mulds, moss and efflorescent, salts, filling of cracks etc and applying a coat of cement based paint complete all as specified & directed by Engineer-in-Charge. |
| 20 | M&L for preparation of old decorated plastered or unplastered surfaces of walls by brooming down or steel wire brushing,scrapping down smoke soot mulds, moss and efflorescent, salts, filling of cracks etc and applying two coats of cement based paint complete all as specified & directed by Engineer-in-Charge. |
| 21 | M&L for preparation of old decorated, plastered or pointed surfaces of wall by brooming down or steel wire brushing,scrapping down smoke soot moulds, moss and efflorescent, salts and treating oil & greasy spots, washing, rubbing down and stopping of distempered surface, filling of cracks etc and applying one coat of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali &fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm complete all as specified and as directed. |
| 22 | M&L for preparation of old decorated, plastered or pointed surfaces of wall by brooming down or steel wire brushing,scrapping down smoke soot moulds, moss and efflorescent, salts and treating oil & greasy spots, washing, rubbing down and stopping of distempered surface, filling of cracks etc and applying two coat of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali &fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm complete all as specified and as directed by Engineer-in-Charge. |
| 23 | Material & Labour for applying Twocoats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali &fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exteriorprimer applied @ 0.90 litre/ 10 sqm over new surfaces complete all as specified and as directed by Engineer-in-Charge. |
| 24 | M&L for complete removal of existing treatment of old decorated, plastered or pointed surfaces of wall and applying two coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali &fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exteriorprimer applied @ 0.90 litre/ 10 sqm complete all as specified and as directed by Engineer-in-Charge. |
| 25 | M&L for preparation of old painted wooden or wood based surfaces of any description not otherwise described over 10cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed by Engineer-in-Charge. |
| 26 | M&L for preparation of old painted steel and iron surfaces of any description not otherwise described over 10 cm width or girth and applying one coat of synthetic enamel paint of approved tint complete all as specified and directed by Engineer-in-Charge. |
| 27 | M&L in repair for 25mm dia stainless steelpipe curtain rod with steel brackets and steel knobs at both ends as per site requirement including taking down old existing PVC conduit pipes with accessories complete all as specified |
| 28 | S&F bevelled edge mirror of size 600mm x 450mm selected quality glass mounted on6mm thick commercial plywood and fixed to wooden plugs with chromium plated brass screws. |
| 29 | S&F in repair 4mm thick Sheet glass, ordinary quality and glazing with oil putty in square n exc 0.5 sq. m in each pane complete all as specified and as directed by Engineer-in-Charge. |
| 30 | M&L for rewriting/repainting to existing writing letters or figures not exc 30 cm height in block Roman, Italian or Indian letters including stops, comma, arrows, brackets, dashes etc on sign board (Black or yellow base) including two coats of oil paint over a coat white base synthetic enamel paint complete all as specified and directed. |
| 31 | NOTES FOR SER ITEM NO 08 TO 25 OF BOQ :(a) The work pertaining to periodical services shall be executed by contractor as per MOU from authorised applicator through manufacturer of which the materials i.e Exterior Emulsion Paint, Distemper, Putty etc after approved by the GE.(b) The Contractor shall submit the documents “Memoradum of Understanding” (MoU) before starting the subject work with atleast one of the manufacturers mentioned in the contract documents.(c) Cost of scaffolding, trestles, ladders, cradles etc necessary for execution of work and protective measures as per site requirement shall be included in the quoted rate.(d) Removing of nails, making good holes, cracks etc as per site requirement.(e) Work in patches and in narrow/ widths, bands, cornices, plasters etc and cutting in edge of line where necessary.(f) Spreading and removing covering to doors, windows, floors, fittings etc to protect them from splashes.(g) Washing floors, cleaning glass, joinery, electric fittings, wirings etc drops and splashes of paint to be cleared to the entire satisfaction of Engineer-in-Charge.(h) Removing and existing furniture for painting work and replacing the same post painting work, movable cupboard, chicks, blinds etc.(j) Sample patch of 10 sqm be prepared considering all the items of periodicals and shall be got approved from GE prior to carrying out further subject work. |
| 32 | NOTES FOR SER ITEM NO 08 TO 25 OF BOQ(Contd).(k) GUARANTEE OF PERIODICAL SERVICES : Periodical services against respective item of BOQ using mechanized equipment’s only executed under this contract are under the guarantee of contractor for 05 (Five) Years after the certified physical completion of work. Contractor is fully liable under this guarantee to rectify and redo all defective work intimated to him during this period including all type of materials and labour to the specifications catered for in the contract. In case contractor fails to rectify the defective work, Accepting Officer shall get the rectification done as necessary at the risk and cost of contractor and recover the cost in full from the contractor. If the contractor consider that any additional treatment is required over and above that specified here in before in Schedule ‘A’, the same shall be carried out by the contractor without any extra cost to the Government. |