| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. DSR 2023 SI. No. 2.6.1. Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)DSR 2023 SI. No. 4.1.8. Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 3 | 1:2:4 (1 cement: 2 coarse sand (zone-III) derived from 5.1.3 natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).DSR 2023 SI. No- 5.1.3. Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of classdesignation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) DSR 2023 SI. No- 6.1.1. Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand). DSR 2023 SI. No. 6.4.1. Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). DSR 2023 SI. No. 5.2.2. Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from naturalources).DSR 2023 SI. No. 5.3. Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars. DSR 2023 SI. No- 5.22.1. Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 9 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth,sides of foundation etc. complete. DSR 2023 SI. No. 2.25(a). Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 10 | Providing and laying Vitrified tiles in floor in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid on 20 mm thick cement mortar 1:4 (1 cement: 4 coarse sand) jointing with grey cement slurry @3.3 kg/sqm including grouting the joints with white cement and matching pigments etc. The tiles must be cut with the zero chipping diamond cutter only. Laying of tiles will be done with the notch trowel, plier, wedge, clips of required thickness, leveling system and rubber mallet for placing the tiles gently and easily.Double charge vitrified tile polished finish of size of Tile 600x600mm. All Material, Labour, T&P etc also including labour cess and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge. DSR 2023 SI. No- 11.41A1.1. Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 11 | 12 mm cement plaster finished with a floating coat of neat cement of mix.1:4 (1 cement: 4 coarse sand). DSR 2023 SI. No- 13.4.1. Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 12 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. DSR 2023 SI. No- 10.25.2. Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 13 | Renewing glass panes, with putty and nails wherever necessary including racking out the old putty: Float glass panes of nominal thickness 4 mm (weight not less than 10kg/sqm).2023 SI. No- 14.5.1.Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 14 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. 2023 SI. No- 13.80.Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 15 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade : New work (two or more coats) over and including water thinnable priming coat with cement primer2023 SI. No- 13.41.1.Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 16 | Finishing walls with water proofing cement paint of required shade. New work (Two or more coats applied @ 3.84 kg/10 sqm). DSR. 2023 SI. No- 13.44.1.Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 17 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of uitable shade with ordinary paint of approved brand and manufacture. 2023 SI. No- 13.62.1.Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 18 | Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc consisting of following operations (a) Applying a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with water proofing compound conforming to IS. 2645 and approved by Engineer-in-charge over the RCC slab including adjoining walls upto 300 mm height including cleaning the surface before treatment. (b) Laying brick bats with mortar using broken bricks/brick bats 25 mm to 115 mm size with 50% of cement mortar 1:5 (1 cement : 5 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineerin- charge over 20 mm thick layer of cement mortar of mix 1:5 (1 cement :5 coarse sand ) admixed with water proofing compound conforming to IS : 2645 and approved by Engineerin- charge to required slope and treating similarly the adjoining walls upto 300 mm height including rounding of junctions of walls and slabs. (c) After two days of proper curing applying a second coat of cement slurry using 2.75 kg/ sqm of cement admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge. (d) Finishing the surface with 20 mm thick jointless cement mortar of mix 1:4 (1 cement :4 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge including laying glass fibre cloth of approved quality in top layer of plaster and finally finishingthe surface with trowel with neat cement slurry and making pattern of 300x300 mm square 3 mm deep.(e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test.“All above operations to be done in order and as directed and specified by the Engineer-in-Charge : With average thickness of 120 mm and minimum thickness at khurra as 65 mm. DSR 2023Item No- 22.7.1.Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 19 | Wiring point for light in PVC Conduit with 1.5sq. mm. FRLSH PVC insulated Multistrand copper conductor cable as earthwire drawn inside the conduit pipe concealed in the wall,complete with 14 SWG copper earth continuity wire, GP Box, piano type switch & ceiling rose/angle/ batten holder on 3 mm. thick phenolic laminated backelite sheetetc., complete in all respects, as directed including matching colour wash. Add for light /fan points with modular type switch in place of piano type switch.131 (C) + 187(A).Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 20 | Supply and fixing of 40 Amp DP MCB (10 KA) @ C Curve CAT A 1010.Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 21 | Supply and fixing of LED Tube Light with matal heavy duty Box type batten Light fitting 1×22 watt suitable for upto 1×22 watt LED Polycarbonate tube light complete Including tube suitable for both surface & suspended complete in all respect. 1413.Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 22 | Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10 mm gap for thermal expansion. 110 mm Dia.All Material, Labour, T&P etc also including labour cess and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge. DSR 2023 SI. No- 12.41.2.Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 23 | Providing and fixing inauguration stone of black granite including letter ingrooving & fixing of stone on suitable place M.R |