| 1 | Supply, installation, testing and commissioning of 10 loopFAcontrolpanel (HoneywellEsserModel No.FlexES‐18‐18 ) Control module, Display Control module,& with redundant CPU Operatingmodule, Essernet module, 5 Active loops as per clause no.1 oftechnical specifications |
| 2 | Supply, installation, testing and commissioning of GUI Software (WINMAG+ 6.5 and above ) and Supporting Industrial workstation for the same GUIas per clause no 2 of specifications |
| 3 | Supply, installation, testing and commissioning Industrial Workstation for above GUI (Item 2) as per no 3 of specifications |
| 4 | Supply and Installation of Aerosol smoke detector tester (similar to Essar FAS Part No. 805582) andPlastic Telescopic Extension,plastic telescopic road,along with necessary test Gas to be supplied to Mod.Labs.as per technical |
| 5 | Supply,Installation of TS3 Smoke capsules for Test Fire 1000-001 testing Kit. For Testing purpose at Modlab. |
| 6 | Supply, installation, testing and commissioning ofmulti sensor O2T smoke detector ( part No. 802373 of Honeywell Esser) as per clause no.6 of technical specifications |
| 7 | Supply, installation, testing and commissioning of O2T smoke detector ( part No. 802373 of Honeywell Esser) along with suitable Isolator base and with required size of Powder coated M S box as per clause no.7 of technical specifications |
| 8 | Supply, installation, testing and commissioning of End termination of 2 pairs x 1.5 sq.mm. twisted pairs shielded armoured cables with Brass Compression gland and interconnection & termination with suitable size copper lugs as per clause no.8 of technical specifications |
| 9 | Supply, installation, testing and commissioning ofRemote Indicator ( Part No. 781814) as per clause no.9 of technical specifications |
| 10 | Supply, installation, testing and commissioning of Manual call Pointas per clause no.10 of technical specifications |
| 11 | supply,installation, testing and commissioning ofFlasher cum Hooter as per clause no.11 of technical specifications |
| 12 | Supply and installation of MCP glass suitable for Honeywell Esser make Manual Call point as per clause no.12 of technical specifications |
| 13 | Supply, installation, testing & commissioning of 250 VA/WattSMPS Power supply 170-264 Volts 50 Hzinput and 10 Amps, 24 volts DC outputas per clause no.13 of technical specifications |
| 14 | Supply, fabrication and installation of MS item made out of MS angle/channel/Patti as per clause no. 14 of technical specification. |
| 15 | Supply, fabrication and installation of M. S. box made as per clause no. 15 of technical specification. |
| 16 | Supply, Installation of Handheld esserbus testing and configuration device for testing purpose after completion of work should be handover to deperatment. as per Clause no 16 of Specifications. |
| 17 | Supply, Installation, Testing & Commissioning of LPG Gas Detectors along with required interface Module and the required accessories.as per Clause 17 of specifications. |
| 18 | Supply, installation, testing & commissioning of 4 Core 1.5Sqmm Copper Conductor shielded, GI round wire armoured,XLPE ,FRLSH Cableas per Clause 18 of Specifications. |
| 19 | Supply, installation, testing & commissioning of 12 V,26 AH,Sealed lead acid battery for existing fire alarm control panels. As per clause no 19 of Technical specifications |
| 20 | Supply, installation, testing & commissioning of 2V,300 AH,Lead acid battery With Battery Rack & Interlinks Cable as per clause No 20 of Technical Specifications. |
| 21 | Only installation, testing and commissioning of 2 pairs x 1.5 sq.mm multistranded copper conductor twisted pair Cable . as per clause no 21 of technical specifications |
| 22 | Maintenance, cleaning, rectification of faults and testing of fire detectors and devices for items detailed below and as per clause no.22 of technical specifications |
| 23 | Cleaning, rectification of faults and testing ofMulti sensor detector( 3100 Nos. Honeywell make O2T - part No. 802374 & 32 Nos. of Bosch make MSD) with isolator Base as per clause no.22.1 of technical specifications |
| 24 | Cleaning, rectification of faults and testing ofToxic Gas detector for CO detector( Model No. SP-2104 Plusof Honeywell RAE System) as per clause no.22.2 of technical specifications |
| 25 | Cleaning, rectification of faults and testing of Manual Call Point (Honeywell-85 No. & Bosch-5 No.) as per clause no.22.3 of technical specifications |
| 26 | Cleaning, rectification of faults and testing ofFlasher cum Sounder ( IQ8Alarm sounder- Red- Part No. 807206- 95 Nos. & Bosch- 5 Nos.) as per clause no.22.4 of technical specifications |
| 27 | Cleaning, rectification of faults and testing of Remote Indicator ( Part No. 781814) as per clause no.22.5 of technical specifications |
| 28 | Cleaning, rectification of faults, changes of software address, testing of 2loop FA control panel (BOSCH MPC-XXX C FPA-5000) with redundant CPU, Control module, Display & Operating module, Essernet module, 2 Active loops as per clause no.22.6 of technical specifications |
| 29 | Cleaning, rectification of faults, changes of software address, testing of 10 /8loop FA control panel (Honeywell Esser Model No. FlexES-18-18 ) with redundant CPU, Control module, Display & Operating module, Essernet module, 5 Active loops as per clause no.22.7 of technical specifications |