| 1 | Clearing the Juliflora jungle without uprooting and disposing of the same etc., complete complying with standard specification and as directed by the Engineer in charge of work. |
| 2 | Dismantling without damaging the nearby structure if any, clearing away and carefully stacking materials useful for re-use for any thickness of walls Brick / Stone Masonry in cement mortar walls under 3m high etc, complete complying with standard specification andas directed by the Engineer in charge of work. |
| 3 | Dismantling, clearing away and carefully stacking material and without disturbing nearby structure useful for reuse for any thickness of plaincement concrete etc, complete complying with standard specification andas directed by the Engineer in charge of work. |
| 4 | Supplying and filling with theM. Sand 15 cm thick layer including watering compacting of including the cost of conveyance materials etc.complete complying with the standard specification and as directed by the Engineer in charge. |
| 5 | Supplying suitable well gravel and providing well gravel packing 15 cm thick for revetment and road basement including stacking the same for pre measurement spreading and working with water to plastic state complete as directed by the Engineer in charge |
| 6 | Earth work excavating and depositing on bank with an initial lead of 10 m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc., complete complying with standard specification and as directed the Engineer in charge of work.(SS20B For Cut open) |
| 7 | Earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders hard red gravelly soil inclusive of shoring to full depth, strutting and bailing out water where ever necessary and refilling the sides of foundations with excavated soil other than sand in layers of not more than 15cm thick. well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with an initial lead of 10 meters and initial lift of 2 meters and clearing, levelling the site etc., complete complying with standard specification and as directed by the the Engineer in charge of work. |
| 8 | Refilling with excavated earth (other than sand) with all leads and lifts for filling the cut open wherever necessary in layers including breaking clods, watering and compaction using power roller to atleast 95 % of Procter density at OMC in each layer and sectioning etc., complete complying with standard specification and as directed by the the Engineer in charge of work.(by machine) |
| 9 | Earthworkin all soils except hard rock requiring blasting and conveying for formation of bund with a lead of 0 to 100 metre deploying earth moving machineries and Tippers including benching, formation of bund in layers of suitable thickness, depending upon type of compaction equipment deployed and not exceeded 23cm thickness, breaking clods, watering toOptimum moisture content (OMC) and compaction of each layers to 95 % of Procter density through deployment of appropriate compaction equipment (8-10 T) power roller / vibratory power roller/ short width (+0.90m width drum) power roller or vibratory power roller ensuring compaction of designed bund section also ensuring compaction of earth fill and side slopes through deployment of hydraulic excavators with steel plate fixtures attached to their booms/ heavy power roller capable of claiming 2.00 (Horizontal) : 1.00 (Vertical) slope including side slope complete complying with standard specification and as directed by the Engineer in charge of work. |
| 10 | Earth workdeploying earth moving machineries for desilting channel and forming bund on either side depositing the earth on banks including jungle clearence etc., complete and complying with standard specification and as directed by the Departmental Officers. |
| 11 | Providing and placing in position of Plain Cement Concrete of grade M 15 using hard well graded coarse aggregate of maximum nominal size of 40mm weigh batching the ingredients and mixing in approved mixers/ batching plant (to produce concrete of the specified characteristic strength of 15N/Sqmm in 28 days) including dewatering the placement site by bailing / pumping and diverting wherever necessary, laying the concrete in layers of not exceeding 15cm thick and in bays, compacting and finishing the surface to the profile with all leads and lifts,watering, curing to attain thestrength as specified in the drawing for various depth and height below and above ground level etc., complete complying with standard specification and as directed by the Engineer in charge of work. |
| 12 | Providing and placing in position of Plain Cement Concrete of grade M 15 using hard well graded coarse aggregate of maximum nominal size of 40mm (60%) and 20mm (40%) weigh batching the ingredients and mixing in approved mixers/ batching plant (to produce concrete of the specified characteristic strength of 15 N/Sqmm in 28 days) including dewatering the placement site by bailing / pumping and diverting wherever necessary, laying the concrete in layers of not exceeding 15cm thick and in bays, vibrating, compacting and finishing the surface to the profile with all leads and lifts,watering, curing to attain thestrength as specified in the drawing for various depth and height below and above ground level etc., complete complying with standard specification and as directed by the Engineer in charge of work. |
| 13 | Providing and placing in position of Plain Cement Concrete of grade M 15 using hard well graded coarse aggregate of maximum nominal size of 20mm weigh batching the ingredients and mixing in approved mixers/ batching plant (to produce concrete of the specified characteristic strength of 15N/Sqmm in 28 days) including dewatering the placement site by bailing / pumping and diverting wherever necessary, laying the concrete in layers of not exceeding 15cm thick and in bays, vibrating, compacting and finishing the surface to the profile with all leads and lifts,watering, curing to attain thestrength as specified in the drawing for various depth and height below and above ground level etc., complete complying with standard specification and as directed by the Engineer in charge of work. |
| 14 | Providing and placing in position of Plain Cement Concrete of grade M 20 using hard well graded coarse aggregate of maximum nominal size of 20mm weigh batching the ingredients and mixing in approved mixers/ batching plant (to produce concrete of the specified characteristic strength of 20N/Sqmm in 28 days) including dewatering the placement site by bailing / pumping and diverting wherever necessary, laying the concrete in layers of not exceeding 15cm thick and in bays, compacting and finishing the surface to the profile with all leads and lifts,watering, curing to attain thestrength as specified in the drawing for various depth and height below and above ground level etc., complete complying with standard specification and as directed by the Engineer in charge of work. (For Wearing Coat without vibration) |
| 15 | Providing andplacing in position of Reinforced Cement Concrete M20 grade using hard well graded coarse aggregate of maximum nominal size of 20mm weigh batching the ingredients and mixing in approved mixers/ batching plant (to produce concrete of the specified characteristic strength of 20N/Sqmm in 28 days) including dewatering the placement site by bailing / pumping and diverting wherever necessary, laying the concrete in layers of not exceeding 15cm thick and in bays, compacting and finishing the surface to the profile with all leads and lifts,watering, curing and vibrating to attain thestrength as specified in the drawing for various depth and height below and above ground level etc., complete complying with standard specification and as directed by the Engineer in charge of work.(With Vibration) |
| 16 | Providing and placing in position of Reinforced cement concrete of grade M25 with well graded aggregates and the nominal maximum size of coarse aggregate of 20mm weigh batching the ingredients and mixing in approved mixers/batching plant ( to produce concrete of the specified characteristic strength of 25N/mm2 at 28 days) including dewatering the placement site by bailing/pumping and by diverting wherever necessary laying the concrete in layers of not exceeding 15cm thick and in bays vibrating, compacting and finishing the surface with all leads and lifts, watering curing complete so as to attain the profile and strength specified in the approved drawing & specifications and complete as directed by the Engineer in charge of works and as per the technical specifications. (With Vibration) |
| 17 | Supplying and erecting water tight steel centering for sides and soffits including supports and strutting up to height of 3.29 m high for plain surface such as R.C.C.slabs, vertical slabs, side slabs of R.C.C.Works with all cross bracings using mild steel B.G.10 gauge sheets of size 90cm x 60cm stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joists of size 10cm x6.5cm spaced at about 90cm centre to centre and supported by casurina props of10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specification and as directed by the by the Engineer in charge of work(The retrieved materials should be taken back by the contractor). The paymentfor centering should be made after the concrete is laid etc., |
| 18 | up to 3m height for sluice with strutting |
| 19 | up to 3m height for sluice without strutting |
| 20 | For circular centring |
| 21 | Supplying fabricating and placing in position of Ribbed tor steel bars of various diameter for all Reinforced Cement Concrete works including cost of rods, binding wire, Labour Charge for cutting the rods to the required length, bending, tying and fixing in position complete for various height below and above ground level etc., Complete complying with standard specification and as directed by the by the Engineer in charge of work. |
| 22 | Supplying and fixing new cut stone fully dressed to size on all faces and set in cement mortar 1:3 (One cement and three CS sand by volume) including all incidental charges such as finishing, curing etc., complete complying with standard specification and as directed by the Engineer in charge of work. |
| 23 | Supplying, hoisting, laying and fixing in position of RCC hume pipesNP3 class of 900mm dia with suitable collars including labour and jointing materials etc., complete complying with the standard specification and as directed by the Engineer in charge of the works. |
| 24 | Pointing with CM 1:3 flush pointing random rubble/coursed rubble including brushing ,raking the surface ,cleaning thoroughly with water ,depth of mortar not less than 15mm,curing the surface for the required period to attain the characteristic strength ,etc.,complete including the cost of cement,sand ,mixing charges ,labour charges and all other incidental charges complete as specified in the drawings and specification for variousheightsas directed by the Engineer complying with stadard specification. |
| 25 | Plastering with Cement mortor 1:4-20mm thick including curing, finishing etc, complete complying with standard specification and as directed by the Engineer incharge of work. |
| 26 | Rough stone dry packing using old rough stones for apron and revetment including stacking charges for pre measurement and finishing etc., Complete complying with standard specification and as directed by the Engineer in charge of work. |
| 27 | Rough stone dry packing using new rough stones for apron and revetment including stacking charges for pre measurement and finishing etc., Complete complying with standard specification and as directed by the Engineer in charge of work. |
| 28 | Fabricating, supplying and erection of Screw Gearing steel shutters of size 0.80 m x 0.75 m with consists of skin plate made out of 8 mm thick mild steel plate and horizontally stiffened with 65 mm x 65 mm x 6 mm steel angle at an interval of not more than 0.5 m and vertical stiffeners made out of same section at an interval not more than 0.6 m and provided with 8 mm thick mild steel gusset plate of required size on both sides fastened with rust free bolts and nuts etc. Groove Channels of ISMC 65mmx65mmx6mm mild steel angle for required height up to 2.5 m including welding hold fast of size 25 mm x 25 mmx 6 mm mild steel angle 3 numbers on both sides. Providing Sill Beam of 100mm x 50mm x 6mm, 1.15 m length and providing of 63 mm screw rod made of mild steel duly machined and fully threated to suite the Head set assembly with required height up to 4.95 m and required holes. Fixing the screw rod to the shutter gusset plate with required bolts and nuts in proper alignment to the Head Set. Providing of Top Beam made up of 150 mm x 75 mm x 6 mm (ISMB 150) for the length of 1.75 m duly drilled to suite the Head Set assembly with required bed bolts made out of 25 mm mild steel round rod duly threated with suitable anchorage arrangements to the height of 0.6 m with necessary fish plate made out of 16 mm mild steel plate of size 0.2 m x 0.3 m 2 numbers with require bolts. Providing Head set assembly light duty with Hexagonal nut (approximate 50 kg) made up of cast iron including moulding, machining and Hexagonal nut threaded to suit screw rod provided with thrust bearings for smooth operation. Dismantling the existing damaged shutter assembly conveying and stacking at section store. The whole shutter assembly should be painted with two coats of anti-corrosive black paint over one coat of red oxide primer paint. Erecting the Shutter assembly by Durky post and Chain block fixing the top beam with necessary. The rate is inclusive of all materials, labour charges including Lathing, Drilling, Welding, Gas cutting, Hydraulic bend removing of M.S. rod, hire charges of Crane and also inclusive of cost of covering plate, Foundation bolts, all bolt and nuts, conveyance to this site, Loading and unloading charges, Grease packing, Lubricating oil, Operating key, Locking arrangement and checking the Shutter operation etc., complete as directed by the Departmental Officers. The rate is Excluding GST. |
| 29 | GST 18% |