Design, Engineering, Supply, Installation And Commissioning Of Natural Gas Electric Heater Skid At Gmpl , Material Requirement , Natural Gas Heater Skid,Electric-276 Kw,Two Stacked Vessel Each With 3 Phase Heater Bank,Inlet Gas Temperature -(Minus)12.8 Deg. C, Outlet Gas Temperature -(Plus) 34 Deg. C, Min Flow-300Kg/Hr,Max Flow-18500Kg/Hr,Work Pressure- 8Kg/Cm2, Design Pressure-15.0Kg/Cm2,Shell Material-Carbon Steel,Sheath Material-Stainless Steel,415V,3 Phase,50Hz,Flameproof, Iia/Iib,Ip55,Heater Type-Shell & Element,Orientation-Horizontal,Heater Watt Density-Less Than 2.5W/Cm2, Standards:Asme Section-Ii, Section-V,Section- Ix, (Bidder To Quote The Rate Including Any P & F Charges As Well As Freight Charges For Delivery On Fot Gmpl Mangalore Site Basis) , Thyristorised Heater Control Panel, For Heater Banks Control Of Natural Gas Electric Heater Skid, With Plc Controller, Free Standing On Floor, Indoor Use, Ingress Protection-Ip42, Input Voltage-415V, 3Phase, 50Hz, Output Voltage-415V, 3 Phase, 50Hz,Material-Mild Steel, Copper Bus Bar, Indian Standard-Is13947 (Part-5/Sec-2): 2004 (Bidder To Quote The Rate Including Any P & F Charges As Well As Freight Charges For Delivery On Fot Gmpl Mangalore Site Basis) , Service Requirement , Design, Engineering & Documentation Of Natural Gas Electric Heater Skid And Submission Of Drawing , Inspection & Testing Of Materials At Vendors Works Including Tpi Charges , Mandatory Spares As Per 215498 C 0000 Sp 1681 001 1 (Technical Specification For Natural Gas Electric Heater Package) , Supervision By Engineer For Erection, Testing& Commissioning At Site As Per Scc