}

Tender For Hariparvat Zone Room No. 87 Construction Work Of Community Building In Bhud Ka Baag Nagla Gopali Ki Thar. - Dismantling Cement Concrete Or Brick Or Granolithic Floors Including Stacking Of Dismantled As Directed By E/Ic With In A Distance Of 60, agra-Uttar Pradesh

Agra Municipal Corporation has published Tender For Hariparvat Zone Room No. 87 Construction Work Of Community Building In Bhud Ka Baag Nagla Gopali Ki Thar. - Dismantling Cement Concrete Or Brick Or Granolithic Floors Including Stacking Of Dismantled As Directed By E/Ic With In A Distance Of 60. Submission Date for this Tender is 21-05-2025. Building Work Tenders in agra Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

49044035
Tender For Hariparvat Zone Room No. 87 Construction Work Of Community Building In Bhud Ka Baag Nagla Gopali Ki Thar. - Dismantling Cement Concrete Or Brick Or Granolithic Floors Including Stacking Of Dismantled As Directed By E/Ic With In A Distance Of 60
Open Tender
Indian
Uttar Pradesh
Agra
21-05-2025

Tender Documents

Tender Details

Tender For Hariparvat Zone Room No. 87 Construction Work Of Community Building In Bhud Ka Baag Nagla Gopali Ki Thar. - Dismantling cement concrete or brick or granolithic floors including stacking of dismantled as directed by E/IC with in a distance of 60 meters (200 Feet). 2 Dismantling brick work or stone work in lime or Cement mortar and including stacking of material as directed by E/IC with in a distance of 60 meters (200 feet) but Mud Mortar. 3 Excavation in soil mixed with moorum/shingle, kankar requiring the use of special tools & plant such as pick axes sabbals etc.foundation in ordinary Soil (Loam, Cley or sand) including, lift up to 1.50 M and lead up to 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 M form the foundation trenches. Including royalty. 4 E/W cutting in or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5m lift and 30 m lead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the engineer-in-charge including royalty 9.00 cum. 5 Dismantling of old interlocking tiles pavement including stacking of serviceable material and disposal of unserviceable material within lead of 50m as per direction of engineer in charge. 6 Cartage of silt, sludge kankar and other disposable organic material etc. all complete with labor T&P including cartage of 8 km. 7 Providing and laying cement concrete in 1:5:10 (1 Cement :5 Fine Sand :10 Stone Ballast 40 mm guages) and curing complete, including cost of form work in foundation and floors. 8 M-150 Brick work in 1:4 with Cement and coarse sand including supply of all material, labor T & P etc. required for proper completion of work. 9 12MM Thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not including 80mm in girth and finished even and smooth. No extra for missing any additive. 1 cement : 4 Coarse Sand. 10 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. including cost of centering shuttering finishing and excluding reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregates 20mm nominal size) upto plinth level. 11 R.C.C. work with cement approved coarse sand and 2 cm (3/4) gauge approved stone ballast in the proportion 1:1.5:3 for slab work excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWGI binding wire and including necessary centering and shuttering etc. and also including supply of all materials labor and tools and plants etc. required for proper completion of the work. Strength of the concrete shall not be less than M-150. 12 Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars). 13 Finishing walls putty approved brand and manufacture and of required shade and undecorated wall surface to give and even shade over and including curing and cost of all materials. 14 Finishing walls with exterior emulsion paint (Apex) of approved brand and manufactured and of required shade and undecorated wall surface to give even shade over @ 1.25 Ltr/10sqm including one coat of primer applied @ 0.75Ltr./10sqm coat curing and cost of all material, labour, T&P etc. required for proper completion of work for two coat. 15 Providing, Laying and spreading 22.4-53 mm stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 whose steel/vibratory roller 8-10 tonnes in stages to proper grade and camber, applying the brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering. 16 Supply and laying stone dust etc. all complete. 17 Consolidation/Compaction of stone ballast 10cm thick (loose) coat including repairing of patches picking up to old surface spreading, ballast making medhies to retain water and carriage of metal upto 30m carriage of water upto 200m maintenance of barriers and all labour T&P including road roller charges etc. required for proper completion of work the stone ballast is to be supplied to the contractor free of cost at site. 18 Supply & fixing of pre-cast M-30 cement concrete RUBBER MOLD INTERLOCKING TILES over 40mm thick local sand bed, with 3mm thick joints filled with local sand including leveling, tempering and sweeping etc., interlocking bricks will be as description given in direction issued by the IRCSC-03-2004 and should be ISI marked all complete. 80mm thick, Strength should not less than M-30. (tiles shape decided by Engineer-in-charge with ISI Mark) 19 Providing and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone) aggregate (20 mm nominal size) and cutting complete including cost of form work. In foundation and floors. 20 Mild Steel and Iron work of small size and section such as holding down woods, hold fasts tierods, grating etc. (When not included in and over all rates) brought to required form including supply of steel and its wastage including cost of bolts, nuts if required for proper completion of work including fabrication of grill/stairs case railing. 21 Providing & fixing stainless steel (Grade 304) raiding made of hollow tubes channels plates etc. including welding grinding, buffering polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolt complete, i/cfixing the railing with necessary accessories and stainless steel dash fasteners stainless steel bolts etc, of required size on the top of the floor or the side of slab with suitable arrangement as per approval of Engineer in-charge, (of pavement purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.). 22 Painting two coat other primer on steel with sianth paint including etc all complete. 23 100 mm thick (average) mud phuska of damped brick earth on roof laid to slope consolidated and plastered with 25 mm thick mud mortar mixed with bhuska 10 kg per cum of earth and gobri leaping with 1:1 (Clay and cowdung) and covered with cement mortar 1:3 (1 cement : 3 time sand) and finished neat including cost of bricks tiles. 24 Providing and laying 20 mm kota stone flooring over 20 mm thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid over jointed with grey cement slurry mixed with pigment to match the shade of slab including rubbing and polishing complete. 25 Providing and laying of wiring point, fan box, fans as per direction of engineer-in-charge etc. all complete. 26 Supply and fixing of Precast Reinforced R.C.C. benches (PFRC) ornamental benches with etc. all complete. 27 Supply and fixing of Doors and Window as per direction by engineer-in-charge etc. all complete. 28 Providing and laying Vitrified tiles in floor of 500x500 mm size (thickness 10mm), with water absorption less than 0.08% and conforming to IS : 15622, of approved brand & manufacturer, in desired colour and shades, laid with cement based high polymer modified quick set tile adhesive (water based) confirming to IS : 15477 including grouting of joints. 29 Supply and fixing of black granite stone board and approved standard matter with brick work, plaster & paint etc. all complete. 30 Sub Total (A) 31 Deduction Cost of old brick 32 Deduction Cost of old brick bats 33 Sub Total (B) 34 Sub Total (A-B) = (C) 35 Add / Deduction For Estimate Figure Amount Match 36 Grand Total

Key Value

Document Fees
INR 500 /-
EMD
INR 124763.0 /-
Tender Value
INR 12.47 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail