| 1 | E/W Excavation in ordinary soil (Loam, clay or sand )includinglift upto 1.50 M and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or in to the space between the buildingand the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer -in -charge upto a distance of 30 m from the foundation trenches. S.I No. 251(a) |
| 2 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors,including supply of all materials, labour, Tools& plants etc. required for proper completion of the work |
| 3 | First class Brick Work in 1:4 cement &Coarse sand2.20 F.M mortar in foundation and plinth including supply of all rials,labour and T&P etc. requried for propercompletion of the work |
| 4 | Supplying, fitting and placing with MS bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 including bending for proper and necessary completion of the work and including supply of steel and wastages, bends, hooks and authorised overlapping shall be measurised as per direction of Engineer-in-charge. |
| 5 | R.C.C. Raft foundation and footing with 4 cm. work with Cement approved coarsesand and 2 3/4\") gauge approved stoneballast in the proportions of 1:1.5:3 in lintels fodoors and windows excluding supply einforcement and its binding but including itsfixing and binding the same with 24 B.W.G.G.I., binding wire and including necessarycentering and shuttering etc. and also includingsupply of all materials, labour and T & P etc.required for proper pletion of the work.Excluding cost of Binding wire. |
| 6 | R.C.C. work with Cement approved coarsesand and 2 3/4\") gauge approved stoneballast in the proportions of 1:1.5:3 in lintels fodoors and windows excluding supply einforcement and its binding but including itsfixing and binding the same with 24 B.W.G.G.I., binding wire and including necessarycentering and shuttering etc. and also includingsupply of all materials, labour and T & P etc.required for proper pletion of the work.Excluding cost of Binding wire. |
| 7 | First class Brick Work in 1:4 cement &Coarse sand2.20 F.M mortar in Superstructureincluding supply of all rials,labour and T&P etc. requried for propercompletion of the work |
| 8 | 12 mm thick Plaster with cement andcoar sand of 1.25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1 cm including supply of all material labour T&P etc. required for proper completino of the work (S.I NO.584)Add for Extra labour to all materials for plaster face of one brick wall. |
| 9 | 12 mm thick Plaster with cement andcoar sand of 1.25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1 cm including supply of all material labour T&P etc. required for proper completino of the work (S.I NO.584)Add for Extra labour to all materials for plaster face of one brick wall. |
| 10 | Cement Concrete with 2 cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. |
| 11 | Supply and fixing 6 mm. (¼\") China white glazed tiles in flooring or in skirting or dado laid with 1:3 Cement and approved coarse sand mortar finished with white cement slurry, jointing and polishing complete, including supply of all materials, labour and Tools and Plants. |
| 12 | Providing wall putty on new surface with approved quality material of Berger/ JK / Birla or similar make 2 coats. |
| 13 | Finishing wall with weather coat of approved coat of approved make and quality with two or more coat to give an even shade after thorologhty brushing the surface free from mortar dropping and other foreign matters and sand papered smooth including supply of all materials, labour, tools & plants etc required for proper completion of the work. |
| 14 | Supply and fixing 20mm thick kota stone tiles in riser of steps, skirting, dado & pillars laid on 12mm thick mortar in with 1:3 cement and approved coarse sand and joined with gray cement slurry mixed with pigment to match the shade of slab finished with rubbing and polished of approved quality complete, including supply of all materials, labour, tools and plants etc. required for proper completion of the work. |
| 15 | M.S. or iron work of small sizes and section such as holding down bolts, hold fast, tie rods grating etc. wrought to required from including supply of steel bolts, nuts wastage etc. and their fixinguired for proper completion of the workSame as in item 502 above but in M.S. Grills & Stair case railing. |
| 16 | 100 mm thick (average) mud phaska ofdamped brick earth on roofs laid to slope consolidated and plaster with 25mm thick mud mortar mixed with Bhusa at 35 Kgs. per cum of earth and gobri looping with mix 1:1 (1 clay and 1 cow dungs) and covered with 1st class flat Tiles bricks grouted and pointed with cement mortar 1:3 (1 cement 3 fine sand) mixed with 2% of integral water proffing compound by weight of cement and finished neat.Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs,balconies, terraces etc consisting of following operations:(a) Applying a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with water proofing compound conforming to IS. 2645 and approved by Engineer-in-charge over the RCC slab including adjoining walls upto 300 mm height including cleaning the surface before treatment. (b) Laying brick bats with mortar using broken bricks/brick bats 25 mm to 115 mm size with 50% of cement mortar 1:5 (1 cement : 5 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer in-charge over 20 mm thick layer of cement mortar of mix 1:5 (1cement :5 coarse sand ) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer in-charge to required slope and treating similarly the adjoining walls upto 300 mm height including rounding of junctions of walls and slabs. (c) After two days of proper curing applying a second coat of cement slurry using 2.75 kg/ sqm of cement admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge. (d) Finishing the surface with 20 mm thick jointless cement mortar of mix 1:4 1cement :4 coarse sand) admixed with waterproofing compound conforming to IS : 2645 and approved by Engineer-in-charge including laying glass fibre cloth of approved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300 mm square 3 mm deep. (e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test.“All above operations to be done in order and as directed and specified by the Engineer-in-Charge : With average thickness of 120 mm and minimum thickness at khurra as 65 mm |
| 17 | Supply and fixing of cross clamp of required size fabricated from 50mm x 12mm M.S. flat complete with fan hook including painting etc. complete in all respect. |
| 18 | Supply and fixing of fan hook fabricated from M.S. rod for ceiling fan each. |
| 19 | Wiring point for light with 1.5 sq. mm.FRLSH PVC insulated multistrand single core copper conductor cable in heavy guage rigid steel conduit pipe concealed in the wall, complete with 14 SWG copper earth continuity wire,GP Box , piano type switch & ceiling rose/ angle/batten holder on 3 mm thick phenolic laminated backelite sheet etc.,complete in all respect, as directed including matching colour wash. |
| 20 | Wiring point for fan / fesh air fan (light duty exhaust fan) with 1.5 sq.mm. FRLSH PVC insulated multistrand single core copper conductor cable in heavy guage rigid steel conduit concealed in the wall, complete with 14 SWG copper earth continuity wire,GP Box , piano type switch & ceiling rose on 3 mm thick phenolic laminated backelite sheet etc complete in all respect, including matching colour wash. |
| 21 | Wiring point for light in 1.5 sq. mm.FRLSH PVC insulated multistrand single core copper conductor cable & point with 5 Amp flush type switch and 3 pin socket and earth continuity wire of 1.5 sq.mm. FRLSH PVC insulated multi strand copper conductor cable. |
| 22 | Supply and Wiring of submains with two nos. of 2.5 sq. mm.FRLSH PVC insulated 1100 V grade single core multistrand copper conductor cable in existing conduit complete with supply of all material labour and T&P required for proper completion of the work as directed at site by Engineer in charge. |
| 23 | Supply and fixing of recess/ Surface/ Pendent mounting round 6 Watt 8 Watt LED Down Lighter having Powder coated die cast aluminium housing with heat sink, diffuser/ Reflector and driver set complete in all respect. |
| 24 | Supply and fixing of LED Tube Light with batten suitable for up to 1 X 22 watt LED tube light fitting including tube on Surface complete in all respect. |
| 25 | P.V.C pipe (6kg/sqcmpressure) Kissan /Supreme quality of Equivalent 90 MM Dia |
| 26 | Supply and fixing of granite stone for inauguration |
| 27 | Add Gst 18% |