| 1 | Labour charges for Removing the Existing cut stone Structureincluding, Numberingall labour charges,hirefor all tools and plants for employed, scaffolding charges handling charges hoisting and stacking them in the places shown by the Departmental Officersetc complete.,as per standard specification. |
| 2 | Cut stone flooring |
| 3 | Pavukkal |
| 4 | Uthiravari |
| 5 | Stone Pillar |
| 6 | Bothiyal |
| 7 | Outer & inner vari |
| 8 | Chithiravanam |
| 9 | Upa peedam padmajagathi,athistanam |
| 10 | Uthiram |
| 11 | Labour charges for Refixing & Dressing the old Cut stone masonary work in Lime Mortor 1:1.5 excluding cost and conveyance of cut stone but including all labour charges scaffolding etc complete with standard specifications. The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works. |
| 12 | Cut stone flooring |
| 13 | Pavukkal |
| 14 | Stone Pillar |
| 15 | Bothiyal |
| 16 | Outer & inner vari |
| 17 | Chithiravanam |
| 18 | Upa peedam padmajagathi,athistanam |
| 19 | Supply of cut stone for carrying out Garpagraham, Arthamandapam, Maha Mandapam, Thirumathil and other Temple Structures upto 10 feet length,etc., complete |
| 20 | Above 5\" feet to upto 10\" feet length |
| 21 | Above 10\" feet to upto 14\" feet length |
| 22 | Upto 5\" feet length |
| 23 | Labour charges forDressing & Fixing the New Cut stone masonary work ,excluding cost and conveyance of cut stone but including all labour charges scaffolding etc complete with standard specifications. The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works. |
| 24 | Uthiravari |
| 25 | kumutha vari |
| 26 | Outer Vari |
| 27 | Pavukkal |
| 28 | Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With Lime Mortor1:1.5 etc complete. |
| 29 | Single line dressing |
| 30 | Three line dressing |
| 31 | Earthwork excavation for foundation in all soils except hard rock requiring blasting to a full depth with initial lead of 10 m and lift of 2m etc., complete |
| 32 | Supplying and filling in foundation in basement with filling sand in layars of 148mm thickness well watered rammed and consolidated complyiny with relevant std specification including cost of supplying filling sand. |
| 33 | Cement concrete 1:5:10 (One of cement five of sand and ten of HBG jelly )for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc.,complete in respects complying with relevant Std, Specification and as directed by the Dept, Officers. |
| 34 | Random Rubble masonry work in Lime Mortor 1:1.5 Using selected stones and bond stones in foundation and basement including dewatering wherever necessary proper setting, curing etc., complete in all respectscomplying with relevant standard Specifications. |
| 35 | Below Basement |
| 36 | Brick work in CM 1:5 using country brick of size 83/4\"x41/4\"x2 3/4\" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification. |
| 37 | Foundation and basement |
| 38 | Ground floor super structure |
| 39 | Plastering with Cement mortar 1:5,12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications. |
| 40 | Painting two coat with approved water based Exterior Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curingin all floors including brushes etc., complete as per specification. -10 m 2 ( S.I. No 358 ) |
| 41 | Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers.The coarse and fine aggregates to be used should comply with the requirements of IS Standards.(No separate payment will be made by the Department for the excess usage of materials). |
| 42 | Centering for soffits of Rcc slabs of plain surface like lintels, beams, etc., including strutting 3M high using MS sheets of size 90cmx60cm and PG 10 stiffened with MS angles of size 25x25x3mm laid over silver oak (C.W) joists of size 10x6.5cm (spaced at about 90cm c/c) and supports 75cm c/c complying with standard specification and directed 10sqm. |
| 43 | Supplying and fabricating and placing in possition MS grills for reinforcement including cost of steel for all works. The rate including cost of binding wire also(SS NO 134) |
| 44 | Weathering course concrete with broken jelly 20mm size and pure slaked lime over Pavukkal slab, the proportion being 32:12.5 for required depth of 80mm for giving required slope and thickness of roof on required, well beaten with wooden beater etc, complete with standard specifications. |
| 45 | Finishing the top of roof with one course of machine pressed tiles 23cmx 23cmx20mm of approved quality laid in Lime mortor1:1.5,12mm thick mixed with water proofing compound 2% by weight of cement usedetc, complete with standard specifications. |
| 46 | Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications |
| 47 | Polishing the teak wood door with two coats of best French (Lac) polish with approved quality and brand over a coat of bee\"s waxing including preparing the wooden surface to receive polishing, etc.,complete complying as per the standard specifications. (The make, quality and colour of french polish, bees vax should be got approved by the Executive Engineer before use on works.) |
| 48 | Water washing the stone surfaces restoration by providingwater jet wash using appropriate methodology with lite tespal liquid ammonia to restore the originalities of the existing granite structure inclusive of hire charges of all tools and plants employed, scaffolding arranements, conveyence harge of all materials to site andlabour for work etc.,completed as per standard specification. |
| 49 | Labour charges Pointing thejoints with Lime Mortor1:1:5 20mm deep using red and yellow oxide and including cost of special tiles such brush and watering, curing etc complete, as per standard specifications. |
| 50 | Supplying and fixingmild steel grill Gate including costconveyance of all materials and fixing in position including priming coat etc complete with standard specifications. |
| 51 | Painting new iron works such as gate, steel doors windowsventilatorswithtwo coats of approved quality and color of synthetic enamel paint over the existing red oxide primer in allfloor etc, complete complying with standard specifications. |
| 52 | Sub Total |
| 53 | GST @ 18% |