Tender For Construction Of Smart Village Office Peringala--1 CIVIL WORKS 2 2.31Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared 3 2.6.1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavatedearth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds ofsoil 4 4.1.8Providing and laying in position cement concrete of specified grade excluding the cost of centering andshuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40nominal size) 5 5.9.1Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases ofcolumns, etc for mass concrete 6 5.9.3Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs,landings, balconies and access platform 7 5.9.5Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams,girders bressumers and cantilevers 8 5.9.6Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers,Abutments, Posts and Struts 9 5.9.19Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbelsetc., including edges 10 5.2.2Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinthand string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five levelexcluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size) 11 5.1.2Providing and laying in position specified grade of reinforced cement concrete, excluding the cost ofcentering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarsesand :3 graded stone aggregate 20 mm nominal size 12 5.3Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings,balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floorfive level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement :1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). 13 5.22.6Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position andbinding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more 14 7.1.1Random rubble masonry with hard stone in foundation and plinth including levelling up with cementconcrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinthlevel with:Cement mortar 1:6 (1 cement : 6 coarse sand) 15 2.25Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers notexceeding 20