| 1 | Earth Work in cutting in ordinary soil including dressing and ramming of bottom and disposal of surplus excavated earthas directed by Engg.-In-Ch.SI no.253, maidan, path way |
| 2 | Earth Work in Excavation for foundations in soil including dressing and ramming of bottom and disposal of surplus excavated earthas directed by Engg.-In-Ch.SI 251 |
| 3 | Providing and laying Cement concrete 1:4:8 mix (1 cement, f/sand, graded stone aggregate 40 mm) including supply of all materials. Labour and T&P etc.required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. SI 2 |
| 4 | R.C.C. work with cement approved coarse sand and 20 mm gauge approved stone grit in raft foundation excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and t & P etc. required for proper completion of the work. Binding wire cost being included in the item SI NO 287 |
| 5 | R.C.C. work with cement approved coarse sand and 20 mm gauge approved stone grit in the proportion of 1:1.5:3 in for column excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and t & P etc. required for proper completion of the work. Binding wire cost being included in the item |
| 6 | R.C.C. work with cement approved coarse sand and 20 mm gauge approved stone grit in the proportion of 1:2:4 in lighter beams excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and t & P etc. required for proper completion of the work. |
| 7 | R.C.C. work with cement approved coarse sand and 20 mm gauge approved stone grit in the proportion of 1:1.5:3 in for slab excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and t & P etc. required for proper completion of the work. Binding wire cost being included in the item. si no 284 |
| 8 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in overall rates) wrought to required shape as necessary includingbendingfor proper completion of the workl and including supply of steel its watages etc all complet.si no 504 |
| 9 | M-150 class Brick work over base concreate in Cement Mortar 1:3 including all material, labour, T&P in foundation work etc. complete. SI no.307 |
| 10 | Pro & laying 25 mm thick D.P.C work is 1:2:4 cement, c/sand, s/grite with composil powder etc all complet SINO 361 |
| 11 | Class-150 brick work in 1 : 3 cement and coarse sandmortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. S.I.314(5) |
| 12 | Mild steel or iron work of heavy size and sections such as trusses, built up gates, door frames etc.wrought to required shape as necessary for bending etc. including supply of steel and its wastage including cost of bolts, nuts if required, welding, grinding and making holes as required for completion of work |
| 13 | 20 mm. Thick plaster with cement mortar in proportion of 1 : 2 cement & Corse sand of b/w etc all complet . SI NO 5 |
| 14 | 15 mm. Thick plaster with cement mortar in proportion of 1 : 3 cement & Corse sand of b/w etc all complet . SI NO 583 |
| 15 | 40mm. thick C.C. flooring 1: 2: 4 plain cement concrete floor with cement, approved coarse snad and 20mm. Graded approved stone laid in panels finished with 3 mm. Floating coat of neat cement or cement and marble dust in 5 : 1 as specified over and including 75mm thk. base concrete consisting of cement, local sand and brick ballast 40mm guage in the proportion of 1:4:8 and removing any over lapping mortar at the joints of the panel if any and giving them a uniform finish including supply of all materials, labour and T&P etc.required for proper completion of the work. |
| 16 | P/Lof Vertified tiels/ Kajariya Tiels with 20 mm thick base mortar 1:2 mix (cement,C/sand) etc all complete. |
| 17 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete |
| 18 | Finishing walls with water proof cement paint of approved make and quality on new work with three coats to give an even shade i/c supply of all material , labour and t&p etc.requiredfor proper completion of work. |
| 19 | S/F of wooden work in Panal as door and window etc all complet fitting etc all complet.dsr |
| 20 | Painting 1st coat over priming coat on steelsuperior synthetic enamelto give an even shade and including cleaning the surface with one coat Priming coat withcost of all materials labour tools and plants etc. required for proper completion of the work. |
| 21 | P/L of Antritretment of demak etc all complet |
| 22 | Cartage of earth up to 5 km distance loding and unloding charge including etc all complet. |
| 23 | Add:-5%Electification work in room and w.c. |
| 24 | S/L/R/C of G-3 stone grite with water and dust 22.4-53 mm gauge consolidation including road roller 8-10 K-N etc all complet. |
| 25 | Providing and laying of C.C. road with 1:2:4 cement, coarse sand and 20 mm s/grite on prepair surface etc all complet. |