| 1 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meter lead. |
| 2 | Dismantling doors, windows and clearstory windows steel or wood shutter including chowkhats and holdfasts etc. complete and stacking within 50 meters lead: |
| 3 | Repair to damaged RCC slabs, beams and columns etc for strengthening with cement mortar 1 : 2 in following steps :-Choping losse and cracked concrete to required depth, cleaning the exposed surface of steel and concrete with wire brush and sand papering , cleaning of concrete surface with water as necessary and getting dried.(ii)Applying Epoxy primer on the exposed steel bars. (iii)Applying Epoxy hardener and resin mix (as per manufectured\"s specification) on concrete and steel bars with brush. (iv)Speading dry cement mortar 1 : 2 mix over epoxy treated wet surface and allow it to dry for one day.(v)Plastering the surface with cement sand mortar 1 : 3 upto depth of 30mm complete.(vi) Cure the plastered surface for 15 days, All work including scaffolding etc. complete in all respect. |
| 4 | Add extra for mirror polishing on existing marble work/ Kota stone flooring work where ever required to give high gloss finish complete. |
| 5 | Providing and fixingaluminum workfor doors ,windows, ventilators and partition with extruded built up standard tubular / appropriate Z sections and other sections of approved make conforming to IS :733 and IS :1285,fixed with rawl plugs and screws or with fixing clips ,or with expansion hold fasteners including necessary filling up of gap. at junctions , at top ,bottom and sides with required PVC/neoprene felt etc. Aluminium section shall be smooth ,rust free, straight ,mitered and jointed mechanically wherever required including cleat angle Aluminium snap beading for glazing /paneling , C.P. brass/ stainless steel screws Al. Tower bolt & Al. handle & Al. Aldrop etc.,all complete as per architectural drawings and thedirections of Engineer- in – charge .(Glazing and paneling to be paid for separately).For fixed portionPolyester Powder coating aluminum( minimum thickness of powder coating 50 micron) |
| 6 | For shutters builtup standard tubular sections of openable doors ,windows & ventilators including providing & fixing hinges / rollers etc. and making provision for fixing of fittings wherever required (lockes shall be paid for separately). Polyester Powder coating aluminum( minimum thickness of powder coating 50 micron) |
| 7 | Providing and fixing glazing in aluminium door, window ,ventilator shutters and partitions etc. with PVS / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge.(Cost of aluminium snap beading shall be paid in basicitem.)With glass panes of 4.0 mm thickness ( weight not less than 10.0 kg/sqm) as per IS : 2835. |
| 8 | Providing and fixing 12 mm thick prelaminated three layer medium density (exterior grade ) particle board Grade I, Type II conforming to IS : 12823 bonded formaldehyde synthetic resin ,of approved brand and manufacture in paneling fixed in aluminium doors ,windows shutters and partition frames with C.P. brass / stainless steel screws etc. complete as per architectural drawings and direction of engineer-in-charge.Prelaminated particle board with decorative lamination on both sides. |
| 9 | Providing and fixing 100mm brass locks (best make of approved quality) for aluminium doors including necessary cutting and making good etc. complete. |
| 10 | Providing and fixing double action hydraulic floor spring of approved brand and manufacture IS : 6315 marked, for doors including cost of cutting floors as required, embedding in floors and cover plates with brass pivot and single piece M.S. With stainless steel cover plate |
| 11 | Repair of existing steel glazed doors, windows and ventilator, MS sheet door, garge doors, compound wall gates etc. by welding drilling complete include. Cost of welding rods and hire charge of welding meachine and TP etc complete |
| 12 | Painting exterior surface ofWallwith 100% acrylic exterior paint of approved brand and manufacture to give an even shade with two or more coats including prepartion of base with sand papering, primer, putty,etc complete in all respect including scaffolding and safety provision :old work |
| 13 | Two or more coats on new work including prepartion of base with primer, putty, lippy etc complete in all respect Old work (One or more coats ) |
| 14 | Painting with synthetic enamel paint of approved brand and manufacture togive an even shade : old work |
| 15 | French sprit polishing Two or more coats on new work including a coat of wood filler |
| 16 | Providing & laying broken glazed titles on roof ( broken glazed tilesnot less than 9 Kg/Sqm) on top of hot bitumen @ 1.7 Kg/Sqm. (1.40 Kg ofVG-40 (30/40 )grade and 0.30 Kg/Sqm. OfVG-10 (80/100) grade) and joints filled with cement mortar 1 :2 (1 cement:2 marble dust mixed with water proofing compund all complete as per direction of Engineer-in-charge. |
| 17 | Grading roof for water proofing treatment withwater proffing compoundCement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 18 | Finishing with neat cement (punning). |