| 1 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. . |
| 2 | (a) Depth of excavation not exceeding 1.500 mm. |
| 3 | Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming. |
| 4 | Cost of stone boulder 150 mm size delivered ans stacked at site. |
| 5 | (II) Cement concrete with 30 mm. down graded shingles excluding shuttering.N.B. VarietyIn ground floor . |
| 6 | (a) 1:3:6 proportion. |
| 7 | Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface]. |
| 8 | (ii) With 1:4 cement mortar . |
| 9 | (b) 15 mm. thick plaster. |
| 10 | (a) M.S. orW.I. ornamental grill of approved design joints continuously welded with M.S., W.I. flats and bars for windows ,railing etc. fitted and fixed with necessary screws and lugs in ground floor.(Add extra @1% for each addl. floor up to 4th floor and @1.25% for each addl. floor above 4th floor). |
| 11 | (ii) Grill weighing above 16 kg./sq.m.and above . |
| 12 | Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). |
| 13 | (a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge. . |
| 14 | (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sandparpering etc. in cluding using of approved putty etc. on the surface , if necessary. |
| 15 | (a) On timber or plastered surface:. |
| 16 | (1) With super gloss (hi-gloss). |
| 17 | (iv) Two coats (with any shade except white). |
| 18 | (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sandparpering etc. in cluding using of approved putty etc. on the surface , if necessary. |
| 19 | (b) On steel or other metal surface: . |
| 20 | (1) With super gloss (hi-gloss). |
| 21 | (iv) Two coats (with any shade except white). |
| 22 | (b) Priming one coat on timber or plasteredsurface with syntheticenamel oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 23 | (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 24 | 18% GST |
| 25 | 1% LWCess |