|
| 1 | (A) Material/Erection of 11/0.4KV,100 KVA S/Stn. |
| 2 | Prov.Distribution Transformer (Ordinary), 11/0.4 kV,100 KVA |
| 3 | Prov.Steel Tubular Poles (10 m, Working Load > 300 kgf/m²) |
| 4 | Prov.X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line |
| 5 | Prov.MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA\"s |
| 6 | Prov.X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 7 | Prov.X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed |
| 8 | Prov.X-Arm [Channel Iron (100x50x6 mm), Length : (460mm) x 2 Nos for supporting Main Channel of Transformer] |
| 9 | Prov.MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 10 | Prov.MS Angle Iron (35X35x6 mm), Length : (460 ) x 2 Nos |
| 11 | Prov.MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing |
| 12 | Prov.MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 13 | Prov.MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos |
| 14 | Prov.GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm |
| 15 | Prov.D.O Fuse Unit |
| 16 | Prov.Surge Arrester, 9 kV Station Class(Porcelain Type) |
| 17 | Prov.Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12kV, 90 kN) including Dead End Clamps etc.) |
| 18 | Prov.Pipe Earthing Set |
| 19 | Prov.AAAC 7/3.15mm² Conductor for Earthing |
| 20 | Prov.Half Clamp (M.S. Flat 50X6 mm) |
| 21 | Prov.Full Clamps (M.S. Flat 50X6 mm) |
| 22 | Prov.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] |
| 23 | Prov.Barbed Wire |
| 24 | Prov.LT Cable (3.5 Core) 120 mm² |
| 25 | Prov.a). Aluminium Paint. |
| 26 | Prov.b). Red Oxide |
| 27 | Prov. plinth for double pole (100KVA S/Stn.) structure complete i/c excavation of pit, Boulder Filling Upto Ground Level and making plinth of C.C. 1:5:10, of size 10\"x3\"x2.5\". |
| 28 | Prov.X-Arm:[Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos]for CT-PT Unit |
| 29 | Prov.X-Arm [Channel Iron (100x50x5 mm), Length : (460mm) x 2 Nos for supporting Main Channel of CT-PT Unit] |
| 30 | Prov.MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 31 | Prov.MS Angle Iron (35X35x6 mm), Length : (460 ) x 2 Nos |
| 32 | Prov.MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing |
| 33 | Prov. CT-PT Combined Unit 11 KV 100/5 Amp |
| 34 | Prov.Energy Meter 11 KV HT -/5 Amps |
| 35 | Prov.PVC Multistrand 4 mm² copper wire with Φ-1 inch GI pipe for concealing |
| 36 | Erection charges complete in all respect |
| 37 | Transportation charges complete in all respect |
| 38 | (B)Material/Erection of 11 KV HT Line |
| 39 | Prov AAAC 7/3.81mm² Conductor (80mm²) {Includes Cutting and wastage} |
| 40 | Prov. Steel Tubular Poles (10 m, Working Load > 200 kgf/m²) |
| 41 | Prov.X-Arm: [Channel Iron (100x50x5 mm), Length : 1500 mm X 3Nos] Single Pole |
| 42 | Prov.M.S A.I X-Arm (1800x50x50x5 mm),Long For Single Pole |
| 43 | Prov M.S A.I X-Arm (50x50x5 mm), Length (2x750) mm Long For Single Pole |
| 44 | Prov M.S A.I X-Arm (50x50x5 mm),Length (2x600) mm Long For Single Pole |
| 45 | Prov.C Ix Arm (100x50x6 mm), Length (2400) mm For Double Pole |
| 46 | Prov.A.I (50x50x6 mm), Length (2700) mm For DoublePole |
| 47 | Prov.M.S C. I Cross Arm (75x40x5 mm), Length (2400) mm For G.O Switch & D.O Fuses |
| 48 | Prov.Belt Set - MS A.I 50x50x6, Length [2400 mm x 2 No.] |
| 49 | Prov.X-Bracing Set - MS A.I 50x50x6, Length [2700 mm x 2 No.] |
| 50 | Prov 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN) |
| 51 | Prov Disc insulator ,1 No Disc (12 kV, 90 kN) including Dead End Clamps etc. |
| 52 | Prov.D.O Fuse Unit |
| 53 | Prov egg insulator |
| 54 | Prov HT Earthing set complete |
| 55 | Prov Double Continous Earth wire (GI, 8 SWG) @ 0.102 kg/m |
| 56 | Prov Danger Plate (250X200X1.6 mm) |
| 57 | Prov Nuts and Bolts of Various Sizeswith flat and spring washers |
| 58 | Prov Barbed Wire |
| 59 | Prov Aluminium Paint |
| 60 | Prov. HP All-in-One PCIntel Core i3-1215U 24-inch |
| 61 | Erection charges for complete in all respect |
| 62 | Transportation charges complete in all respect |