| 1 | Construction of Agri Storage Godown at Bodipatti.(SF no.115). |
| 2 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 3 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. |
| 4 | Filling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete. |
| 5 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. |
| 6 | Brick work using country bricks of size 83/4\"x41/4\"x23/4\"in cement mortar 1:5 (One cement and fiveM.Sand) including curing neat finishing, etc., complete complying with standard specifiction. |
| 7 | For Foundation and Basement |
| 8 | For Super Structure in Ground Floor |
| 9 | Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification. |
| 10 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting up to 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casuarinas props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items. |
| 11 | Centering below Ground Level |
| 12 | Rate for Column Post |
| 13 | Rate for Roof Slab, Lintel, Beam |
| 14 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcemeat and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. |
| 15 | For Foundation and Basement |
| 16 | For Superstructure in Ground Floor |
| 17 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 40mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete |
| 18 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 19 | Finishing the top of the roof with one course of Machine Pressed Tiles of size 20 cm x 2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar, red oxide, etc., complete complying with standard specification |
| 20 | Weathering course with best quality broken brick jelly of size 20mm uniform gauge in pure slaked lime (no sand to be listed) over the RCC roof slab in the proposition being brickjelly to lime 32:12:1/2 by volume and laid over into a single layer and consolidated to required finished thickness beating the mixture with wooden beaters keeping the surface constantly welted by sprinkling lime jaggery water including all other labour charges etc., complete |
| 21 | Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 22 | Supply and applying of two Coats of putty of 3 mm thick over the exposed RCC surface of ceiling including finishing the joint smoothy with grinding machine and the surface shall bethorougholy cleaned out of dust andscrubbing. The surface Shall than be allowed to dry for atleast 48 hours. It shall then be sand papered( waterproof abrasive sheet)to give a smooth and even surface.Any uneveness shall be made good by applying 1 st Coat of putty mixed with water on entire surface including filling up the undulations and applying 2 nd coatof putty after 6 hours 1 st coat of putty and then sand papering waterproof abrasive sheet the same after it is dry and finishing the surface smoothly etc. complete. complying with standard specifications and as directed by the departmental offices. |
| 23 | Interior / Exterior Emulsion Two coats over priming coat including cost and conveyance of all materials and labor charges etc complete. |
| 24 | Supply and fixing of Pull and push type rolling shutter with all charges etc |
| 25 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |