Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Repair of Jhulla `4 seater See Saw` , Complete in all respect to the satisfaction of Engineeer in Chargge (Including all Taxes) Required material/ equipments for repair work detail is as under FRP Seat for Seasaw |
| 2 | Repair of Jhulla `4 seater See Saw` , Complete in all respect to the satisfaction of Engineeer in Chargge (Including all Taxes) Required material/ equipments for repair work detail is as under Bearing 6205,6207 and 6004 |
| 3 | Repair of Jhulla `4 seater See Saw` , Complete in all respect to the satisfaction of Engineeer in Chargge (Including all Taxes) Required material/ equipments for repair work detail is as under Paint of Jhulla(Powder coated) |
| 4 | Repair of Jhulla `4 seater See Saw` , Complete in all respect to the satisfaction of Engineeer in Chargge (Including all Taxes) Required material/ equipments for repair work detail is as under Welding of Jhulla inculuding laabour and material charges |
| 5 | Repair of Jhulla Six Seater MGRComplete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- Bearing 6205,6207and 6004 |
| 6 | Repair of Jhulla Six Seater MGRComplete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- Bearing Pin |
| 7 | Repair of Jhulla Six Seater MGRComplete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- PVC Seat |
| 8 | Repair of Jhulla Six Seater MGRComplete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Paint of Jhulla (Powder Coated) |
| 9 | Repair of Jhulla Six Seater MGRComplete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Welding of Jhulla including labour and material chages |
| 10 | Repair of Jhulla Two Seater ARC Swing,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Bearing 6205,6207 and 6004 |
| 11 | Repair of Jhulla Two Seater ARC Swing,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Bealt Seat |
| 12 | Repair of Jhulla Two Seater ARC Swing,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Chain |
| 13 | Repair of Jhulla Two Seater ARC Swing,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Paint of Jhulla (powder coated) |
| 14 | Repair of Jhulla Two Seater ARC Swing,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Welding of Jhulla including labour and material charges |
| 15 | Repair of Jhulla Double Hexagonal Multi Activity Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Plastic Part |
| 16 | Repair of Jhulla Double Hexagonal Multi Activity Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-FRP slide WAVE 10 Ft. |
| 17 | Repair of Jhulla Double Hexagonal Multi Activity Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- FRP slide WAVE 8 Ft. |
| 18 | Repair of Jhulla Double Hexagonal Multi Activity Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- Canopy multiplay |
| 19 | Repair of Jhulla Double Hexagonal Multi Activity Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- Paint of Jhulla (Powder coated) |
| 20 | Repair of Jhulla Double Hexagonal Multi Activity Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Welding of Jhulla including labour and material charges |
| 21 | Repair of Jhulla Multi Activity Play System,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- Plastic part |
| 22 | Repair of Jhulla Multi Activity Play System,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- FRP Slide WAVE 10 Ft. |
| 23 | Repair of Jhulla Multi Activity Play System,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- FRP Slide WAVE 8 Ft. |
| 24 | Repair of Jhulla Multi Activity Play System,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- Welding of Jhulla including labour and material charges |
| 25 | Repair of Jhulla Multi Activity Play System,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Paint of Jullah (Powder coated) |
| 26 | Repair of Open Gym Equipments Air Walker at site,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ Equipments for repair work detail is as under:- PVC Foot Rest |
| 27 | Repair of Open Gym Eqipments Air Walker at site,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Bearing 6205, 6202and 6207 |
| 28 | Repair of Open Gym Eqipments Air Walker at site,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Bearing Pin |
| 29 | Repair of Open Gym Eqipments Air Walker at site,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Plastic cap Main pipe |
| 30 | Repair of Open Gym Eqipments Air Walker at site,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Nut and Bolt |
| 31 | Repair of Open Gym Eqipments Air Walker at site,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Nut Cap |
| 32 | Repair of Open Gym Eqipments Air Walker at site,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Hand Lattua |
| 33 | Repair of Open Gym Eqipments Air Walker at site,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Plastic Cap-48mm, 4mm, 32mm |
| 34 | Repair of Open Gym Eqipments Air Walker at site,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Paint per machine (Powder Coated) |
| 35 | Repair of Open Gym Eqipments Air Walker at site,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Welding per machine including labour and material charges |
| 36 | Repair of Open Gym Eqipments Sit up Station at site,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Hand Grip |
| 37 | Repair of Open Gym Eqipments Sit up Station at site,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Plastic cap main pipe |
| 38 | Repair of Open Gym Eqipments Sit up Station at site,Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-NUT and Bolt |
| 39 | Repair of Open Gym Eqipments Sit up Station at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:- Nut Cap |
| 40 | Repair of Open Gym Eqipments Sit up Station at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Plastic Cap- 48mm, 42mm, 32mm |
| 41 | Repair of Open Gym Eqipments Sit up Station at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Paint per machine (powder coated) |
| 42 | Repair of Open Gym Eqipments Sit up Station at site, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Welding per machine including labour and material charges |
| 43 | Repair of Open Gym Equipment Air Swing at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- PVC Foot rest |
| 44 | Repair of Open Gym Equipment Air Swing at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- Bearing 6205,6202and 6207 |
| 45 | Repair of Open Gym Equipment Air Swing at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- Bearing Pin |
| 46 | Repair of Open Gym Equipment Air Swing at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- Plastic cap main pipe |
| 47 | Repair of Open Gym Equipment Air Swing at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- Nut and Bolt |
| 48 | Repair of Open Gym Equipment Air Swing at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- Nut Cap |
| 49 | Repair of Open Gym Equipment Air Swing at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- Plastic cap- 48mm, 42mm,32mm |
| 50 | Repair of Open Gym Equipment Air Swing at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- Paint per machine(Powder Coated) |
| 51 | Repair of Open Gym Equipment Air Swing at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- Welding per machine including labour and material charge |
| 52 | Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand Grip |
| 53 | Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing 6205,6202 and 6207 |
| 54 | Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing Pin |
| 55 | Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing Seat |
| 56 | Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-PVC Seat |
| 57 | Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Plastic Cap main pipe |
| 58 | Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut and Bolt |
| 59 | Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut cap |
| 60 | Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Paint per machine (Powder Coated) |
| 61 | Repair of Open Gym Equipment Horse Rider Station at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Welding per machine including labour material charges |
| 62 | Repair of Open Gym Equipment Stiar Stepper at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Welding per machine including labour material charges |
| 63 | Repair of Open Gym Equipment Stiar Stepper at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand Grip |
| 64 | Repair of Open Gym Equipment Stiar Stepper at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing 6205, 6202 and 6207 |
| 65 | Repair of Open Gym Equipment Stiar Stepper at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing Pin |
| 66 | Repair of Open Gym Equipment Stiar Stepper at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-PVC Foot Rest |
| 67 | Repair of Open Gym Equipment Stiar Stepper at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Plastic cap main pipe |
| 68 | Repair of Open Gym Equipment Stiar Stepper at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nutand Bolt |
| 69 | Repair of Open Gym Equipment Stiar Stepper at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut cap |
| 70 | Repair of Open Gym Equipment Stiar Stepper at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Paint per machine (powder coated ) |
| 71 | Repair of Open Gym Equipment Leg pressat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand Grip |
| 72 | Repair of Open Gym Equipment Leg pressat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing 6205, 6202, 6207 |
| 73 | Repair of Open Gym Equipment Leg pressat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing pin |
| 74 | Repair of Open Gym Equipment Leg pressat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-PVC Seat |
| 75 | Repair of Open Gym Equipment Leg pressat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Plastic cap main pipe |
| 76 | Repair of Open Gym Equipment Leg pressat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut and Bolt |
| 77 | Repair of Open Gym Equipment Leg pressat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut Cap |
| 78 | Repair of Open Gym Equipment Leg pressat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-hand Lattu |
| 79 | Repair of Open Gym Equipment Leg pressat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-welding per machine including labour and material charges |
| 80 | Repair of Open Gym Equipment Leg pressat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Paint per machine |
| 81 | Repair of Open Gym Equipment Pull Chairat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand Grip |
| 82 | Repair of Open Gym Equipment Pull Chairat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing 6205,6202,6207 |
| 83 | Repair of Open Gym Equipment Pull Chairat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing pin |
| 84 | Repair of Open Gym Equipment Pull Chairat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-PVC Seat |
| 85 | Repair of Open Gym Equipment Pull Chairat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Plastic cap main pipe |
| 86 | Repair of Open Gym Equipment Pull Chairat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut and Bolt |
| 87 | Repair of Open Gym Equipment Pull Chairat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut cap |
| 88 | Repair of Open Gym Equipment Pull Chairat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-HandLattu |
| 89 | Repair of Open Gym Equipment Pull Chairat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-paint per machine (powder coated) |
| 90 | Repair of Open Gym Equipment Pull Chairat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-welding per machine including labour and material charges |
| 91 | Repair of Open Gym Equipment Exercising Barat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-welding per machine including labour and material charges |
| 92 | Repair of Open Gym Equipment Exercising Bar at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-plastic cap main pipe |
| 93 | Repair of Open Gym Equipment Exercising Bar at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut and Bolt |
| 94 | Repair of Open Gym Equipment Exercising Bar at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut cap |
| 95 | Repair of Open Gym Equipment Exercising Bar at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand Lattu |
| 96 | Repair of Open Gym Equipment Exercising Bar at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-paint per machine (Powder coated) |
| 97 | Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-paint per machine (Powder coated) |
| 98 | Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand Grip |
| 99 | Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing 6205,6202,6207 |
| 100 | Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-PVC Seat |
| 101 | Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing Pin |
| 102 | Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Plastic Cap main pipe |
| 103 | Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut and Bolt |
| 104 | Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut Cap |
| 105 | Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand Lattu |
| 106 | Repair of Open Gym Equipment Seated Chest press at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Welding per machine including labour and material charges |
| 107 | Repair of Open Gym Equipment Arm Wheel at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Paint per machine (Powder coated) |
| 108 | Repair of Open Gym Equipment Arm Wheel at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand Grip |
| 109 | Repair of Open Gym Equipment Arm Wheel at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing 6205,6202,6207 |
| 110 | Repair of Open Gym Equipment Arm Wheel at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing pin |
| 111 | Repair of Open Gym Equipment Arm Wheel at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Plastic cap main pipe |
| 112 | Repair of Open Gym Equipment Arm Wheel at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-nut and bolt |
| 113 | Repair of Open Gym Equipment Arm Wheel at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-nut cap |
| 114 | Repair of Open Gym Equipment Arm Wheel at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-weldingper machine including labour and material charges |
| 115 | Repair of Open Gym EquipmentElliptical Exerciser at site, Complete in all respect to the satisfaction of Engineer-in-Charge. (Including all Taxes)Required material equipments for repair work detail is as under:-Hand Grip |
| 116 | Repair of Open Gym EquipmentElliptical Exerciser at site, Complete in all respect to the satisfaction of Engineer-in-Charge. (Including all Taxes)Required material equipments for repair work detail is as under: Bearing 6205,6202 and 6207 |
| 117 | Repair of Open Gym EquipmentElliptical Exerciser at site, Complete in all respect to the satisfaction of Engineer-in-Charge. (Including all Taxes)Required material equipments for repair work detail is as under: PVC Foot Rest |
| 118 | Repair of Open Gym EquipmentElliptical Exerciser at site, Complete in all respect to the satisfaction of Engineer-in-Charge. (Including all Taxes)Required material equipments for repair work detail is as under: Bearing Pin |
| 119 | Repair of Open Gym Equipment Cycle machineat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand grip |
| 120 | Repair of Open Gym EquipmentElliptical Exerciser at site, Complete in all respect to the satisfaction of Engineer-in-Charge. (Including all Taxes)Required material equipments for repair work detail is as under: Plastic Cap main pipe |
| 121 | Repair of Open Gym EquipmentElliptical Exerciser at site, Complete in all respect to the satisfaction of Engineer-in-Charge. (Including all Taxes)Required material equipments for repair work detail is as under: Nut and Bolt |
| 122 | Repair of Open Gym Equipment Cycle machineat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing 6205,6202,6207 |
| 123 | Repair of Open Gym EquipmentElliptical Exerciser at site, Complete in all respect to the satisfaction of Engineer-in-Charge. (Including all Taxes)Required material equipments for repair work detail is as under: Nut Cap |
| 124 | Repair of Open Gym Equipment Cycle machineat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing pin |
| 125 | Repair of Open Gym EquipmentElliptical Exerciser at site, Complete in all respect to the satisfaction of Engineer-in-Charge. (Including all Taxes)Required material equipments for repair work detail is as under: Paint per machine (Powder coated) |
| 126 | Repair of Open Gym Equipment Cycle machineat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut and Bolt |
| 127 | Repair of Open Gym Equipment Cycle machineat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut cap |
| 128 | Repair of Open Gym EquipmentElliptical Exerciser at site, Complete in all respect to the satisfaction of Engineer-in-Charge. (Including all Taxes)Required material equipments for repair work detail is as under: Welding per machine including labour and material charges |
| 129 | Repair of Open Gym Equipment Cycle machineat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-welding per machine including labour and material charges |
| 130 | Repair of Open Gym Equipment Double Cross Walker at site, Complete in all respect to the satisfaction of Engineer-in-Charge (Including all Taxes)Required material/equipments for repair work detail is as under: Hand Grip |
| 131 | Repair of Open Gym Equipment Cycle machineat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-paint per (powder coated) |
| 132 | Repair of Open Gym Equipment Double Cross Walker at site, Complete in all respect to the satisfaction of Engineer-in-Charge (Including all Taxes) Required material/equipments for repair work detail is as under: Bearing 6205,6202 and 6207 |
| 133 | Repair of Open Gym Equipment Double Cross Walker at site, Complete in all respect to the satisfaction of Engineer-in-Charge (Including all Taxes) Required material/equipments for repair work detail is as under: PVC Foot Rest |
| 134 | Repair of Open Gym Equipment Double Cross Walker at site, Complete in all respect to the satisfaction of Engineer-in-Charge (Including all Taxes) Required material/equipments for repair work detail is as under: Bearing Pin |
| 135 | Repair of Open Gym Equipment Double Cross Walker at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-plastic cap main pipe |
| 136 | Repair of Open Gym Equipment Double cross walkerat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut and Bolt |
| 137 | Repair of Open Gym Equipment Double cross walkerat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut Cap |
| 138 | Repair of Open Gym Equipment Double cross walkerat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Paint per machine (powder coated) |
| 139 | Repair of Open Gym Equipment Double cross walkerat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Welding per machine including labour and material charge |
| 140 | Repair of Open Gym Equipment Twister at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Welding per machine including labour and material charge |
| 141 | Repair of Open Gym Equipment Twister at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing 6205,6202, 6207 |
| 142 | Repair of Open Gym Equipment Twister at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearingpin |
| 143 | Repair of Open Gym Equipment Twister at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Twister plate |
| 144 | Repair of Open Gym Equipment Twister at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Plastic cap main pipe |
| 145 | Repair of Open Gym Equipment Twister at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut and Bolt |
| 146 | Repair of Open Gym Equipment Twister at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut cap |
| 147 | Repair of Open Gym Equipment Twister at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- Hand Lattu |
| 148 | Repair of Open Gym Equipment Twister at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- paint per machine (powder coated) |
| 149 | Repair of Open Gym Equipment Rowing Machineat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:- paint per machine (powder coated) |
| 150 | Repair of Open Gym Equipment Rowing Machineat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Hand Grip |
| 151 | Repair of Open Gym Equipment Rowing Machineat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing 6205,6202,6207 |
| 152 | Repair of Open Gym Equipment Rowing Machineat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-PVC Seat |
| 153 | Repair of Open Gym Equipment Rowing Machineat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Bearing Pin |
| 154 | Repair of Open Gym Equipment Rowing Machineat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Plastic Cap main pipe |
| 155 | Repair of Open Gym Equipment Rowing Machineat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nutand Bolt |
| 156 | Repair of Open Gym Equipment Rowing Machineat site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-Nut Cap |
| 157 | Repair of Open Gym Equipment Rowing Machine at site , complete in all respect to the satisfaction of Engineer -in -Charge. (Including all Taxes) Required material / equipments for repair work detail is as under:-welding per machine including labour and material charges |
| 158 | Repair of Jhulla Multi Activity Play System, Complete in respect to the satisfaction of Engineer in Charge (Including all Taxes) Required material/ equipments for repair work detail is as under:-Canopy multiplay |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail