| 1 | ERECTION OF CABLE SUPPORT STRUCTURE WITH LA TRAY INCLUDING SUPPLY OF NECESSARY 100X50 GI CHANNELS, 75X40 GI CHANNELS, 65X6X6 GI ANGLES AND 65X6 GI FLATS |
| 2 | ERECTION OF33KV,C&R PANEL .SCADA COMPATIBLEFORINDIVIDUAL CONTROL OFPOWER TRANSFORMERSWITH DIFFERENTIALRELAY WITH NECESSARY CONTROL CABLE CONNECTIONS FOR COMMISSIONING |
| 3 | ERECTION OF33KV.200-100/1-1-LA, CT WITH NECESSARY CONTROL CABLE CONNECTIONS INCLUDING SUPPLY OF CT JUNCTION BOX INCLUDING SUPPLY OF CT CONNECTOR |
| 4 | LAYING & JOINTING OF 1.1KV 4C X2.5SQ. MM COPPER CONTROL CABLE WITH SUPPLY OFCABLE LUGS, GLANDS. TAPES,SOCKETS ETC |
| 5 | LAYING &JOINTING OF1.1 KV8C X2.5SQ. MM COPPER CONTROL CABLE WITH SUPPLY OFCABLE LUGS,GLANDS,TAPES,SOCKETS ETC |
| 6 | LAYING & JOINTING OF1.1KV 12C X2.5SQ. MM COPPER CONTROL CABLE WITH SUPPLY OFCABLE LUGS. GLANDS,TAPES. SOCKETS ETC |
| 7 | ERECTION OF ACSR 200SQMM (PANTHER) CONDUCTOR (3 WIRE) INCLUDING LAYING HOISTING JOINTING ETC |
| 8 | MAKING COMPRESSION JOINT FOR ACSR PANTHER CONDUCTOR |
| 9 | ERECTION OF 42KV CLASS GAPLESS LIGHTNING ARRESTOR INCLUDING SUPPLY OF NECESSARYGI BASE PLATE AND LA CONNECTOR |
| 10 | LAYING OF 11KV 3C X 300SQMM XLPE CABLE |
| 11 | JOINTING OF O/D TYPE HEAT SHRINKABLE END TERMINATION JOINTING KIT FOR 11KV, 3C X 300SQMM XLPE CABLE |
| 12 | JOINTING OF I/D TYPE HEAT SHRINKABLE END TERMINATION JOINTING KIT FOR 11KV, 3C X 300SQMM XLPE CABLE |
| 13 | FIXING OF 12KV GAPLESS LIGHTNING ARRESTOR (3 NOS = 1 SET) |
| 14 | FIXING OF 11KV PIN INSULATOR |
| 15 | ERECTION OF 10 MVA 33/11 KV POWER TRANSFORMER INCLUDING SUPPLY OF NECESSARY BIMETALLIC CONNECTOR |
| 16 | ERECTION OF RTCC PANEL FOR 10 MVA 33/11 KV POWER TRANSFORMER |
| 17 | DISMANTLING OF 6.3 MVA 33/11 KV POWER TRANSFORMER & RETURN TO STORE |
| 18 | DISMANTLING OF 400-200/1-1A CT AND RETURN TO STORE |
| 19 | DISMANTLING OF C&R PANEL AND RETURN TO STORE |
| 20 | EARTHING LABOUR INCLUDING SUPPLY OF NECESSARY EARTHING MATERIALS |