|
| 1 | Sweeping and mopping of the office floors (Flooring with ceramic / marble / granite tiles) steps, staircases, handrails with scented cleaning agentsincludingclearing and disposal of waste papers on all working days, Dusting and cleaning of files records in racks, furniture for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards, Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobwebonce in a month collecting and disposing all the waste to outside of the Office complex, with all generalcleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete. (To be carried out on all working days) |
| 2 | Sweeping of open areas around Office buildings collection and removal of garbage and wastes from campus to outside office complex daily, all general outdoor cleaning with sprinkling of water, including removal of weeds and unwanted materials as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all materials such as coconut brooms, Bamboo baskets, cost of all consumables etc. (To be carried out on all working days). |
| 3 | Maintenance charges for cleaning the floor and wall tiles in the toilts, urinals and washrooms by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping andcleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt / refuge and cobwebs and sweeping away the stagnated water as directed by the Engineer in charge including materials for cleaning. The toilet should always be clean, neat and tidy without any odor or foul smell (To be carried out on all working days). |
| 4 | Cleaning of IWC/EWC including cleaning materials, such as toilet brush, phenyol, bleaching powder, acid, mop, etc., (To be carried out on all working days). |
| 5 | Cleaning of Urinals including cleaning materials, such as toilet brush, phenyol, bleaching powder, acid, mop, etc., (To be carried out on all working days). |
| 6 | Cleaning of Wash basins including cleaning materials, such as toilet brush, phenyol, bleaching powder, acid, mop, etc., (To be carried out on all working days). |
| 7 | SGST |
| 8 | CGST |
| 9 | GST for bidders outside TamilNadu (IGST) |