| 1 | Earth work in excavationfor alltype ofroad structure and in all type of classification of soilcomprising of ordinary soil, ordinary rock, hard rock chiseling /wedging out rocks ( Where blasting is prohibited) for retaining walls, breast walls, culverts, bridges, drains and parapets etcetera as per drawings and M.O.R.D. technicalspecificationclause 305.1 and as per direction ofthe Engineer- In – Charge, includingsetting out, construction of shoring and bracing , removal of stumpsand other deleterious materials and disposal of materials upto any lead and upto any lift including dressing of sides and bottom and back filling in trenches with excavatedsuitable approved material to the original surface in layers not exceeding 150mm ( one hundred fifty millimeters) compacted thicknessincluding shoring and strutting and pumping and bailingout water (surface and sub soil water)upto any depthand any quantum of water including cleaning of slush which may arrise out during dewateringas per direction of Engineer-in-Charge. Including carriage of materials within all leads and lifts and other incidental.the rate including of octroi, royality, Malkana, tolltax, or other taxes imposed by the government. |
| 2 | Providing form work with steel plates of 3.15mm (three decimal one five milimeter)thick, welded with angle iron in frames of 30x30x5mm (thirty into thirty into five milimeter)so as to give a fair finish including centring, shuttering strutting and propping etc, with wooden battens and ballies for all heights/depths of propping and Centering and shuttering including strutting, propping etc.code no. 5.9.1 Foundations footing bases of column etc for mass concrete The rate including of octroi, royality, Malkana, tolltax, Sale Tax or other taxes imposed by the government |
| 3 | Providing form work with steel plates 3.15mm( three point fifteen ).thick welded with angle iron in frame 30x30x5mm (thirty inti thirty into five ) . so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 ( four ) Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in Square, rectangular or polygonal in plan column pillar posts and sturts The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge.The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government. |
| 4 | Providing form work with steel plates of 3.15mm (three decimal one five milimeter)thick, welded with angle iron in frames of 30x30x5mm (thirty into thirty into five milimeter)so as to give a fair finish including centring, shuttering strutting and propping etc, with wooden battens and ballies for all heights/depths of propping and centring below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in flat surfaces such assoffits ofsuspended floors roofs, landingsand the like floor etc. The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge.The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government. |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) The rate including of octroi, royality, Malkana, tolltax, Sale Tax or other taxes imposed by the government. |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand) : 4 graded stone aggregate 40 mm nominal size) in foundation Footings and Basis of columns The rate including of octroi, royality, Malkana, tolltax, Sale Tax or other taxes imposed by the government. |
| 7 | Providing and laying mechanically mixed and vibrated reinforced cement concrete work grade M-20 design mix to obtain the minimum compressive strength of M-20 N.mm2 with cement contents not less than of 320kg/m3 (three hundred twenty kilogramme per cubic metre) excluding cost of form work and reinforcement for reinforced concrete work in suspended floor, roofs, landing and shelves and their support balconies beams girders bressumers and cantilevers upto floor all level and curing complete includingcarriage of material within all leads, lifts and other incidental charges complete in all respect as per the direction of Engineer-in-Charge. |
| 8 | Providing and laying cement concrete work 1:2:4 (1 Cement:2 Sand:4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and Coulmn Pillar Posts & sturtsand the like and mass concrete. reinforcement for reinforced concrete work in : The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge.The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government. |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars The rate including of octroi, royality, Malkana, tolltax, Sale Tax or other taxes imposed by the government |
| 10 | Random rubble masonry/polygonal rubble masonry (uncoursed/brought to courses) with hard stone of approved quality in foundation and plinth including leveling up with cement concrete 1:6:12 (one cement : six sand : twelve graded stone aggregate 20mm (twenty) millimeter nominal size mechanical mixed in cement mortor 1:6 (one cement six sand) including curring and carriage of material within all leads and lifts complete in all respect as per direction of Engineer in Charge. The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government. |