| 1 | Construction of New Panchayat Office Building atModugulahalli H/O Modugulahalli |
| 2 | EARTHWORK EXCAVATION for foundation in hard soil and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed.(Hard Soil ) |
| 3 | Supplying and Filling with excavated earth including all labour and material charges etc. complete |
| 4 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 5 | Brick Work in CM 1:5 mix using country bricks ground moulded of size 83/4\"x41/4\"x21/4\" for the following including curing etc., complete |
| 6 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor. |
| 7 | Centering above G.L : Supplying and erecting centering shuttering including necessary supports for the plane surgace in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slab, slaircase steps, bed blocks,critical pier etc.,Below Ground Level |
| 8 | Above Ground Level |
| 9 | Reinforced cementconcrete 1: 1 1/2 :3 (One of cement one and half of sand and three of hard broken stone jelly) using 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works excluding cost and fabrication of reinforcement grills. |
| 10 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing etc., Completed. |
| 11 | Finishing the exposed surface of RCC item of work such as slabs, beams, sunshade, facia, canopy slab, staircase waist slab, landing slab etc., with CM 1:3, 10mm thick. including raking the surface. The rate is to include the cost of providing cement mortar beading or nosing for sunshades & staircase steps, landing slabs etc., complete complying with standard specifications. |
| 12 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm.Basement & Outer alround |
| 13 | Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2. |
| 14 | Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm includingcost and conveyance of all materials to site and all labour charges etc complete |
| 15 | Dadooing of walls with colour glazed tiles of size150x150x6 mmof best qualityincluding cost and conveyance of all materials to site and all labour charges etc complete. |
| 16 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum |
| 17 | Weathering course concrete using best quality broken brick jelly of size 20mm in pure slacked lime over the RCC roof slab in th proportion of brick jelly to lime being32:12.5 by the volume and laid over a single layer and consolidated to the required design & finished thick. beating the concrete with wooden beaters of approved pattern, keeping the surface contantly wetted with sprinking lime & jaggery water as per standard specifications etc., complete as directed by the departmental officers. Rate for 10m3 |
| 18 | Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2cm of approved quality laid in CM 1:3, 12mm thick. With water proofing compound confirming to IS by 2% by weight of cement used & the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar, Red oxide etc., complete complying with standard specifications. Rate for 10m2 |
| 19 | Distembering two coats with best approved distemberincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 20 | Wall Painting two coats Usingwith approved best quality of Exterior Emulsion paint of approved colour over the Including priming coat etc., complete complying with standard specifications and as directed by the departmental officers. |
| 21 | Painting new iron works for doors, windows and Ventilators, Iron bars, Weldmesh, wiremesh, screen, steel bars, flats and other similar works etc., with Two coats of approved first quality of synthetic enamel paint over the existing red oxide primer in all floors.The rate is inclusive of cost of all materials and labour, brushes and scaffolding charges etc., complete complying with standard specification. |
| 22 | Supply andFabrication of Steel doors and Windows includining Cost and Conveyance of all Cherges etc complete. Door D (1.10 x 2.10m) |
| 23 | Window W (1.20 x 1.30m) |
| 24 | Window W1 (1.50 x 1.30m) |
| 25 | Solid PVC door shutters Toilet door using 19 Gauge 19mm MS square tubes for styles and outer frames.15mm MS square tubes for top, lock and bottom rails.The steel tubes shall be covered with 5mm thick solid PVC sheets.Shutter using 5mm thick solid PVC sheets for panelling shall rigidly fixed in position including necessary furniture and fittings.The over all size of styles shall be 50mm x 30mm.The over all size of top rail, Lock rail and bottom rail shall be 75mm x 30mm.The over all size of frames shall be 50mm x 45mm, with suitable rabate for housing the shutter. |
| 26 | Supply andFabrication of Steel rolling shutter size 1.10 x 2.10m - includining Cost and Conveyance of all Cherges etc complete. |
| 27 | Supply andFabrication of Collapsible gate size 1.20 x 2.10m - includining Cost and Conveyance of all Cherges etc complete. |
| 28 | Supply andFixing of RCC jolly size 0.45 x 0.45m - includining Cost and Conveyance of all Cherges etc complete. |
| 29 | Fixing charges of Doors |
| 30 | Fixing charges of Windows |
| 31 | Supply andFixing of cuddappa slabincludining Cost and Conveyance of all Cherges etc complete. |
| 32 | Supplying and fixingP.V.C rainwater down fall pipe of 110m dia with necessary shoes, bends,& clamps etc., |
| 33 | Provision for Electrification arrangementsLight & Fan Point SD.no.17 |
| 34 | Supply& Fixing of Tube Light SD.89 |
| 35 | CFL SD.no.83 |
| 36 | Supply & Fixing of Street light SD.94 |
| 37 | Supply & Fixing of Fan SD.no.110 |
| 38 | Plug Point SD.no.36 |
| 39 | Power Plug Point SD.no.39 |
| 40 | DP Main swetch SD.no.144 |
| 41 | TNEB Meter board SD.no.125 |
| 42 | Service pipe SD.no.69 |
| 43 | Service Connection SD.no.66 |
| 44 | Supply and Fixing of IWC |
| 45 | Supply and Fixing of EWC |
| 46 | Supply and Fixing of Wash Basin |
| 47 | Provision for Name board |
| 48 | Provision for Water Supply Arrangements |
| 49 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |