}

Tender For For Increasing Capacity Of 250 Kva To 400 Kva Tirth Ward Hargavon Chauraha, Installation Of New 100 Kva T/F At Jalalipur Against Extention, Installation Of New 63 Kva T/F At Surjipara Against Ext., Installation Of New 63 Kva T/F At Madanapur Ag, sitapur-Uttar Pradesh

Madhyanchal Vidut Vitran Nigam Limited has published Tender For For Increasing Capacity Of 250 Kva To 400 Kva Tirth Ward Hargavon Chauraha, Installation Of New 100 Kva T/F At Jalalipur Against Extention, Installation Of New 63 Kva T/F At Surjipara Against Ext., Installation Of New 63 Kva T/F At Madanapur Ag. Submission Date for this Tender is 28-04-2025. Transformer Supply Tenders in sitapur Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

48674773
Corrigendum : Tender For For Increasing Capacity Of 250 Kva To 400 Kva Tirth Ward Hargavon Chauraha, Installation Of New 100 Kva T/F At Jalalipur Against Extention, Installation Of New 63 Kva T/F At Surjipara Against Ext., Installation Of New 63 Kva T/F At Madanapur Ag
Open Tender
Indian
Uttar Pradesh
Sitapur
28-04-2025

Tender Details

tender for For Increasing Capacity of 250 KVA To 400 KVA Tirth Ward Hargavon Chauraha, Installation of New 100 KVA T/F at Jalalipur against Extention, Installation of New 63 KVA T/F at Surjipara Against Ext., Installation of New 63 KVA T/F at Madanapur Against Ext. &Installation of New 63 KVA T/F at Parsehra Sarifpur Against Ext. under CM Nagar Sarjan Yojna in the jurisdiction of EE, EDD-Biswan, Sitapur Sl. No. Item Description 1 For Increasing Capacity of 250 KVA To 400 KVA Tirth Ward Hargavon Chauraha.The following works involves. 2 Supply of Lug. Alu. 120 sqmm 3 Carriage of 400 KVA T/F From ESC, Sitapur to Dump Site 4 Carriage of other Line Material From ESC, Sitapur to Dump Site 5 Shifting of 400 KVA T/F FromDump Site to work site 6 Shiftingof other Line Material fromDump Site to work site 7 Construction of massonary type T/F plinth of size 1½x1½x1 M withfixing of two nos. Channel on the top of the plinth.RCC slab of 4 thick onthe top of the plinth, plastering outer surface of walls and its proper curing for erection and commissioning of 11/0.4 KV 400 KVA T/F. 8 Fabrication, erection, grouting, plinthing & painting of wiremesh fencing 2½x 2½x2 M height with M.S Angle 50x50x6 and wiremesh 10 SWG. The work also includes making of retaining wall as per norms . 9 Dismenteling of 250 KVA T/F 10 Mounting of 400 KVA T/F on Plinth and making connection 11 Carriaeg of 250 KVA T/F From Work site to ESC, Sitapur/ JE Store. 12 Laying of AL XLPE Cable 1x400 sqmm 13 For Installation of New 100 KVA T/F at Jalalipur against Extention.following works involves. 14 Supply of Tee-off Channel 15 Supply of Dropper Channel 100x50 mm 16 Supply of 11 KV F Clamp for PCC Pole 17 Supply of Stay Clamp 18 Supply of Top Channel 19 Supply of Holding Clamp for PCC Pole 20 Supply of Eye Hook 21 Carriaeg of 100 KVA T/F From ESC, Sitapur to Dump Site 22 Carriaeg of PCC Pole From ESC, Sitapur to Dump site 23 Carriaeg of ACSR Weasel Conductor From ESC Sitapur to Dump Site 24 Carriage of ABC (3x120+1x95+1x16) sqmm From ESC, Sitapur to Dump Site 25 Carriaeg of ABC L.T. (3x95+1x70+1x16 Sqmm From ESC, Sitapur to Dump site 26 Carriage of other Line Material From ESC, Sitapur to Dump Site 27 Shifting of 100 KVA T/F FromDump Site to work site 28 Shifting of PCC Pole FromDump Site to work site 29 Shifting of ACSR Weasel Conductor FromDump Site to work site 30 Shifting of ABC (3x120+1x95+1x16) sqmm FromDump Site to work site 31 Shifting of ABC L.T. (3x95+1x70+1x16 Sqmm FromDump Site to work site 32 Shifting of other Line Material FromDump Site to work site 33 Errection of Single PCC Pole 34 Fabrication of Top, T-off, Dropper Channel etc 35 Errection of Double Pole 36 Laying stringing and sagging of ACSR Weasel Conductor 37 Laying of ABC (3x120+1x95+1x16) sqmm 38 Laying of ABC L.T. (3x95+1x70+1x16 Sqmm 39 Moutning of 100 KV T/F on double Pole 40 Fixing of stay 41 Grouting of Stay 42 Grouting of PCC Pole 43 For Installation of New 63 KVA T/F at Surjipara Against Ext. .The following works involves. 44 Supply of Tee-off Channel 45 Supply of Dropper Channel 100x50 mm 46 Supply of 11 KV F Clamp for PCC Pole 47 Supply of Stay Clamp 48 Supply of Top Channel 49 Supply of Holding Clamp for PCC Pole 50 Supply of Eye Hook 51 Carriaeg of 63 KVA T/F From ESC, Sitapur to Dump Site 52 Carriaeg of PCC Pole From ESC, Sitapur to Dump site 53 Carriaeg of ACSR Weasel Conductor From ESC Sitapur to Dump Site 54 Carriage of ABC (3x50+1x35+1x16) sqmm From ESC, Sitapur to Dump Site 55 Carriaeg of ABC L.T. (3x95+1x70+1x16 Sqmm From ESC, Sitapur to Dump site 56 Carriage of other Line Material From ESC, Sitapur to Dump Site 57 Shifting of 63 KVA T/F FromDump Site to work site 58 Shifting of PCC Pole FromDump Site to work site 59 Shifting of ACSR Weasel Conductor FromDump Site to work site 60 Shifting of ABC (3x50+1x35+1x16) sqmm FromDump Site to work site 61 Shifting of ABC L.T. (3x95+1x70+1x16 Sqmm FromDump Site to work site 62 Shifting of other Line Material FromDump Site to work site 63 Errection of Single PCC Pole 64 Fabrication of Top, T-off, Dropper Channel etc 65 Errection of Double Pole 66 Laying stringing and sagging of ACSR Weasel Conductor 67 Laying of ABC (3x50+1x35+1x16) sqmm 68 Laying of ABC L.T. (3x95+1x70+1x16 Sqmm 69 Moutning of 63 KV T/F on double Pole 70 Earthing of Pole 71 Fixing of stay 72 Grouting of Stay 73 Grouting of PCC Pole 74 For Installation of New 63 KVA T/F at Madanapur Against Ext. .The following works involves. 75 Supply of Tee-off Channel 76 Supply of Dropper Channel 100x50 mm 77 Supply of 11 KV F Clamp for PCC Pole 78 Supply of Stay Clamp 79 Supply of Top Channel 80 Supply of Holding Clamp for PCC Pole 81 Supply of Eye Hook 82 Carriaeg of 63 KVA T/F From ESC, Sitapur to Dump Site 83 Carriaeg of PCC Pole From ESC, Sitapur to Dump site 84 Carriaeg of ACSR Weasel Conductor From ESC Sitapur to Dump Site 85 Carriage of ABC (3x50+1x35+1x16) sqmm From ESC, Sitapur to Dump Site 86 Carriaeg of ABC L.T. (3x95+1x70+1x16 Sqmm From ESC, Sitapur to Dump site 87 Carriage of other Line Material From ESC, Sitapur to Dump Site 88 Shifting of 63 KVA T/F FromDump Site to work site 89 Shifting of PCC Pole FromDump Site to work site 90 Shifting of ACSR Weasel Conductor FromDump Site to work site 91 Shifting of ABC (3x50+1x35+1x16) sqmm FromDump Site to work site 92 Shifting of ABC L.T. (3x95+1x70+1x16 Sqmm FromDump Site to work site 93 Shifting of other Line Material FromDump Site to work site 94 Errection of Single PCC Pole 95 Fabrication of Top, T-off, Dropper Channel etc 96 Errection of Double Pole 97 Laying stringing and sagging of ACSR Weasel Conductor 98 Laying of ABC (3x50+1x35+1x16) sqmm 99 Laying of ABC L.T. (3x95+1x70+1x16 Sqmm 100 Moutning of 63 KV T/F on double Pole 101 Earthing of Pole 102 Fixing of stay 103 Grouting of Stay 104 Grouting of PCC Pole 105 For Installation of New 63 KVA T/F at Parsehra Sarifpur Against Ext. .The following works involves. 106 Supply of Tee-off Channel 107 Supply of Dropper Channel 100x50 mm 108 Supply of 11 KV F Clamp for PCC Pole 109 Supply of Stay Clamp 110 Supply of Top Channel 111 Supply of Holding Clamp for PCC Pole 112 Supply of Eye Hook 113 Carriaeg of 63 KVA T/F From ESC, Sitapur to Dump Site 114 Carriaeg of PCC Pole From ESC, Sitapur to Dump site 115 Carriaeg of ACSR Weasel Conductor From ESC Sitapur to Dump Site 116 Carriaeg of ABC L.T. (3x95+1x70+1x16 Sqmm From ESC, Sitapur to Dump site 117 Carriage of other Line Material From ESC, Sitapur to Dump Site 118 Shifting of 63 KVA T/F FromDump Site to work site 119 Shifting of PCC Pole FromDump Site to work site 120 Shifting of ACSR Weasel Conductor FromDump Site to work site 121 Shifting of ABC L.T. (3x95+1x70+1x16 Sqmm FromDump Site to work site 122 Shifting of other Line Material FromDump Site to work site 123 Errection of Single PCC Pole 124 Fabrication of Top, T-off, Dropper Channel etc 125 Errection of Double Pole 126 Laying stringing and sagging of ACSR Weasel Conductor 127 Laying of ABC L.T. (3x95+1x70+1x16 Sqmm 128 Moutning of 63 KV T/F on double Pole 129 Earthing of Pole 130 Fixing of stay 131 Grouting of Stay 132 Grouting of PCC Pole

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 18-04-2025 date extendeddfdfdfgy Date 28-04-2025

Key Value

Document Fees
INR 1180 /-
EMD
INR 7000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail