|
| 1 | Cutting and clearance of jungle, bushes, shrubs, Ankra/Ipomoea, Julieflora typna etc., on canals and bunds in dry/moist/slushy conditions including disposal as per instruction of the Engineer incharge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. thick jungle Thick |
| 2 | Removal of slit/soil/earth, sand, pebbles, \"Malba\", debris, rubbish, stone pebbles & obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by Engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing on canal bed complete in all respect For 5 to 15 cms depth, havingLined section |
| 3 | Removal of slit/soil/earth, sand, pebbles, \"Malba\", debris, rubbish, stone pebbles & obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by Engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing on canal bed complete in all respect For depth above 15 cms but upto 30cms having Lined section |
| 4 | Removal of slit/soil/earth, sand, pebbles, \"Malba\", debris, rubbish, stone pebbles & obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by Engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing on canal bed complete in all respect For depth above 30cm |
| 5 | Dismantling of masonry with care inclusive of de-watering wherever required. Dry stone masonry or pitching |
| 6 | Demolishing stone rubble masonry including stacking of usable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required In cement mortar |
| 7 | Dismantling old plaster or skirting, racking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 m lead, inclusive of de-watering wherever required. |
| 8 | Dismantling of cement concrete including disposal of material within 50 m lead , inclusive of de-watering wherever required |
| 9 | Dismantling cement concrete lining including disposal of material within 50 m lead, inclusive of de-watering wherever required of thickness 7.5 cm |
| 10 | Providing and laying cast in situ plain cement concrete design mix M-15 grade for lining, using well graded crusher broken aggregate of maximum nominal size 20 mm conforming to IS-383-1970, including proportioning of the ingredients by weigh batching and mixing bymechanical mixer including finishing of concrete lining, cutting of grooves for construction joints, complete as per specification with all leads and lifts of construction material complete for canal side of thickness. 7.5 cm |
| 11 | Providing and laying cast in situ plain cement concrete design mix M15 grade for lining, using well graded crusher broken aggregate of maximum nominal size 20 mm conforming to IS:383-1970, including proportioning of the ingredients by weigh batching and mixing by mechanical mixer including finishing of concrete lining, cutting of grooves for construction joints, complete as per specification with all leads and lifts of construction material complete for canal bed of thickness 7.5 cm |
| 12 | Supplying, laying & spreading of LDPE film of 250 micron on bed and sides including jointing etc. complete as per specifications including cost of LDPE film, overlapping, adhesive tape etc.with transportation charges upto work site complete. |
| 13 | Preparation and dressing the sub grade including removal of irregularities up to 7.5 cm in soil, morrum mixed with pebbles, small boulders and kankar & murrum for Bed |
| 14 | Preparation and dressing the sub grade including removal of irregularities up to 7.5 cm in soil, morrum mixed with pebbles, small boulders and kankar & murrum for Side slopes |
| 15 | Providing and laying cast in situ concrete sleepers 15 cm x 7.5 cm in bed in cement concrete (1:3:6) with maximum size of crusher broken stone aggregate upto 20 mm well graded including all leads of all construction materials including curing, finishing & form work etc. complete as per specification for: In bed |
| 16 | Providing and laying cast in situ concrete sleepers 15 cm x 7.5 cm in bed in cement concrete (1:3:6) with maximum size of crusher broken stone aggregate upto 20 mm well graded including all leads of all construction materials including curing, finishing & form work etc. complete as per specification for: In sides |
| 17 | Dag belling Over 10 cm to 15 cm deep |
| 18 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50 m. and lift upto 1.5 m. including dressing of excavated area dewatering wherever required complete in all respect. (a) Soft/Loose soil |
| 19 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50 m. and lift upto 1.5 m. including dressing of excavated area dewatering wherever required complete in all respect. (c) Hard soil mixed with kankar/boulders, morrum |
| 20 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50 m. and lift upto 1.5 m. including dressing of excavated area dewatering wherever required completein all respect. (b) Hard/dense soil |
| 21 | Extra charges for disposal of excavated/re-handled material in required profile laid in uniform layers and given side slopes well dressed having layer thickness including loading and un-loading wherever required with cost of dewatering wherever required complete in all respect Not exceeding 20 cm |
| 22 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor\"s density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. With lead upto 250m |
| 23 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor\"s density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. With lead beyond 1250 m and up to 1750 m (for average lead 1.5 Km) |
| 24 | Compaction of earth or highly weathered strata By mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of at least 98% of Standard Proctor\"s density |
| 25 | Watering of earth including cost of carriage of water when source of water is up to 5 km |
| 26 | Lip cutting and final dressing as per designed section including re-handling and disposal of excavated earth in layers 20 cm. on embankments etc. with cost of dewatering wherever required complete in all respect |
| 27 | Supplying, Laying & consolidation of quarry rubbish / Murrum / Murda to required grade & camber in layers not exceeding 15 cm. thickness (loose) by road roller as per specifications including dressing etc. complete |
| 28 | Supplying and laying aggregate in layers and profile as specified including all leads & lifts. This item is to be used only for laying filter / inverted filterBroken ballast 20 to 40 mm size |
| 29 | Quarry rubish not more than 10 cm in size including all lead and lift |
| 30 | Labour charges for spreading of morrum/ quarry spall /rubbish /kanker etc. on side slope of embankment within initial lead upto 50m including dressing etc. |
| 31 | Earth work in excavation in foundation, trenches etc.including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level In all types soils /saturated soil such asmorrum, sand, sandy silt, clay, blackcotton soil, kankar, etc.Depth upto 1.5 m |
| 32 | Dry stone masonry including all leads of all construction materials. |
| 33 | Supplying stone, spall and laying Rip rap in required profile properly hand packed using stone of specified size including all lead & lifts 23 cm thickness (± 5 % thickness tolerance) |
| 34 | Supplying stone, spall and laying Rip rap in required profile properly hand packed using stone of specified size including all lead and lifts. Only labour charges for laying of rip rap stone in required profile / thickness and hand packed properly using stones already available at site within initial lead of 50 mts |
| 35 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; 20mm |
| 36 | Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; 20mm |
| 37 | Add extra over items of cement plaster/ cement concrete/cc.lining/cc flooring or RCC for providing and mixing Polypropylene/Polyester fibres as per IS 16481:2022 or latest revision, 6/12 mm long @ 0.25% (125 gram per 50 kg of cement) or in ratio of as specified by manufacturer specification and direction of Engineer in charge with all leads and lifts. |
| 38 | Side shuttering including propping etc. complete to achieve finish F2 Block joints of foundation stilling basins buckets, aprons etc.(non -suspended horizontallylaid mass concrete) |
| 39 | Finishing wall with water proofing cement paint of approved brand and manufacture and or required shadetogive an even shade including all scaffolding: New work (Two or more coats applied @ 3.84 kg/10 sqm). |
| 40 | Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing,compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;20mm |
| 41 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement..Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. |
| 42 | Providing and fixing in positionbitumen impregnated board confirming to IS: 1838 (Part-1)specification in expansion joints with sealent as per IRC-15-2017 of size: |
| 43 | Centering and shuttering forslabs, beam, lintels columns,trough with or without caps and base including propping and removing |
| 44 | Supplying of M.S. reinforcement including labour charges for bending binding and placing in poisiton all reinforcement as per drawing including cost of binding wire and all lead and lift using (ii) Tor or ribbed bars (IS:1786-1985) |
| 45 | Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. In cement sand mortar 1:4 |
| 46 | Labour charges for fixing stone patties/ lintels duly approved in cement sand mortar (1:3) and pointing underneath with cement sand mortar (1:3) for clear span up to 3.5 m of thickness. Above 8 cm |
| 47 | Flush or ruled pointing on stone masonry including racking of joints and curing etc. complete including all leads of allconstruction materials in mortar ratio. In Cement sand mortar 1:3 |
| 48 | Plaster in cement sand mortar 1:5 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materialsof thickness: 20 mm |
| 49 | Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of: 7.5 cm |
| 50 | P&F rigid PVC Pipe (IS:4985 mark) class II/ (4 Kg. /Cm2 .) approved quality /make including joining the pipe with solvent cement rubber ring and lubricant. 75 mm dia |
| 51 | P&F rigid PVC Pipe (IS:4985 mark) class II/ (4 Kg. /Cm2 .) approved quality /make including joining the pipe with solvent cement rubber ring and lubricant. 160mm dia |
| 52 | Supply and fixing in cement mortar welded hand railing made out of MS round or square bars, flats etc. for staircase or verandah as per design complete in all respect (wooden or PVC hand railing to be paid extra) with priming coat of red oxide |
| 53 | Painting with synthetic enamel paint of approved brand and manufacture togive an even shade : Two or more coats on new work |