| 1 | Fabricating and fixing at desired location using hot rolled sections and MS Plates of grade Fe 250 as per specifications and approved fabrication drawings ( if required), which are to be prepared by Contractor and got approved from Engineer, transporting to site and erecting structural steel members for all heights & at all levels including provision of necessary erection bolts, fixing bolts, nuts, washers, cleats, stiffeners, gussets, base plate, and all necessary fixtures and operations like preheating as per specifications, straightening, bending, cutting , drilling.grinding, machining if specified, welding, grinding and removing the welding burr and preparing surface for painting with wire brush, cleaning and applying one coat of primer and two coats finish paint after fabrication including touching up after erection etc complete as directed by Engineer In Charge. (The qty. of gusset plates, base plates, bolts shall be measured in M.T. for this item.) Structural steel and paint shall be supplied by RCF on non chargeable basis at its store. (Including necessary MS scaffolding) |
| 2 | Supply, fabricating and fixing at desired location using hot rolled sections and MS Plates of grade Fe 250 as per specifications and approved fabrication drawings ( if required), which are to be prepared by Contractor and got approved from Engineer, transporting to site and erecting structural steel members for all heights & at all levels including provision of necessary erection bolts, fixing bolts, nuts, washers, cleats, stiffeners, gussets, base plate, and all necessary fixtures and operations like preheating as per specifications, straightening, bending , cutting, drilling, grinding, machining if specified, welding, grinding and removing the welding burr and preparing surface for painting with wire brush cleaning and applying one coat of primer and two coats finish paint after fabrication including touching up after erection etc complete as directed by Engineer In Charge. (The qty. of gusset plates, base plates, bolts shall be measured in M.T. for this item.) Structural steel (TATA/SAIL/JINDAL/RINL make or equivalent) to be arranged by contractor and paint shall be supplied by RCF on non-chargeable basis. (Including necessary MS pipe scaffolding) |
| 3 | Shifting of grating from store located within RCF Factory premises to site, lifting and fixing of grating at site. |
| 4 | Removing Existing Mangalore tiles / AC / GI / Galvalume sheets/polycarbonate plain and corrugated sheets from roof / cladding / partitions etc., excluding supporting structure but including scaffolding, handling, transporting, sorting and stacking at site lead up to dumping ground and or disposing etc complete as directed. |
| 5 | Providing and fixing 6 mm thick Non-asbestos high impact Polypropylene reinforced cement corrugated sheet in all colors of approved make conforming to IS: 14871-2000 laying the same in position as per the stipulation in IS: 3007-1991 using 8m dia SS-304 L or J hook bolts, SS-304 washers with bituminous washer and EPDM washers, SS-304 nuts and bolts etc. complete and as directed. (Net Area covered by sheeting will be measured. Laps will not be paid separately) |
| 6 | Providing and fixing non-asbestos fiber cement high impact polypropylene reinforced roofing corrugated serrated adjustable ridges in all colours with SS-304 J or L hooks, bolts and nuts and or SS-304 plain and bitumen washers etc. complete as directed. ( rate includes both pairs of ridges) |
| 7 | Dismantling steel work in built up sections in angles, tees, flats and channels of including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and depositing at expansion yard within RCF Factory premises. Payment will be based on weighment slip at RCF Weighbridge. |