| 1 | Construction of Public Distribution Shop in Full Time Karungalipadipatti Habitation@ Puliyampatti Panchayat (Type -II) |
| 2 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation |
| 3 | Collection and supply of sandand filling in to the basement including cost and conveyanceto the siteand all labour charges for filling as per standard specifications |
| 4 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete. |
| 5 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc.,as directed by the departmental officers complete complying with standard specifications. |
| 6 | Brick work in CM 1:5 mix using country bricks ground moulded of size 83/4\"x41/4\"x21/4\" for the following including curing etc., complete complying with standard specifications. Rate for 10m3 |
| 7 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing |
| 8 | Supplying and erecting centeringshuttering includingnecessary supportsforplane etc., complete.(BGL) |
| 9 | Supplying and erecting centeringshuttering includingnecessary supportsforplane etc., complete.(AGL) |
| 10 | Floor finish with granolithic flooring in CC 1:2:4 mix using 10 to 12mm chipsfor 25mm thick including cost and conveyance of all materials and labours etc., complete |
| 11 | Paving the floor with scratch proof ceramic tiles of any colour and any size laid in CM 1:2, 20mm thick. And pointing with white cement 0.4 Kg per Sqm mixed with colouring pigment to suit the colour of the tiles including finishing the joints neatly complying with the standard specifications and as directed by the departmental officers. (The ceramic tiles should be got approved from the Departmental officers before execution). |
| 12 | Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the standard specifications and as directed by the departmental officers. The Glazed tiles should be got approved from the Departmental officers before execution. |
| 13 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 14 | Plastering with cement mortar 1:3 mixto 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete |
| 15 | Plastering with cement mortar 1:4 mixto 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete |
| 16 | Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and threeM.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers.(The make and brand of the tiles should be got approved by the Executive Engineer before use on works) |
| 17 | Distembering two coats with best approved distemberincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 18 | Exterior Emulsion painting two coats with best approved quality and colourpaint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. |
| 19 | Doors D |
| 20 | Door-1 |
| 21 | Window |
| 22 | Ventilator |
| 23 | Rolling Shutter |
| 24 | Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete |
| 25 | Cost and supply of Oriya type Indian baby friendly water closetwith \"P\" or \"S\" trap etc., complete. ( White ) |
| 26 | Providing name board including lettering |
| 27 | GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |