| 1 | Part 1 : Providing Paver Block Pavement from vellaiyagoundanoor ad colony Panchayat union raod to ramya house Koovakkapatti PanchayatEstimate Amount : Rs.6.80 Lakhs |
| 2 | Earthwork excavation and depositing on bank with an initial lead and lift in all classes of soils and sub soils except in hard rock including all labour charges etc . Complete. |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. |
| 4 | Supply & erection of centering for sides & soffits of all R.C.C. worksincluding cost & conveyance of all materials to site and all labour charges etc., complete. |
| 5 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. |
| 6 | Construction of Granular Sub base by providing with graded materials of size 9.5mm to 4.75mm metal in 66% & 2.36mm in 34% including spreading in uniform layers with motor grader on propared surface, mixing by mix in place method with rotavator at OMC and |
| 7 | Providing and Laying of Interlocking Concrete Block (Surface Textured) Pavements having thickness 60mm and compacted over a thin bedding sand layer of 30 mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of Spec |
| 8 | Provision for Name board |
| 9 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
| 10 | Part 2 : Providing Paver Block Pavement from Goundachipatty AD Colony West street Main road to Ramayee house Koovakkapatti PanchayatEstimate Amount : Rs.6.50 Lakhs |
| 11 | Earthwork excavation and depositing on bank with an initial lead and lift in all classes of soils and sub soils except in hard rock including all labour charges etc . Complete. |
| 12 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. |
| 13 | Supply & erection of centering for sides & soffits of all R.C.C. worksincluding cost & conveyance of all materials to site and all labour charges etc., complete. |
| 14 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. |
| 15 | Construction of Granular Sub base by providing with graded materials of size 9.5mm to 4.75mm metal in 66% & 2.36mm in 34% including spreading in uniform layers with motor grader on propared surface, mixing by mix in place method with rotavator at OMC and |
| 16 | Providing and Laying of Interlocking Concrete Block (Surface Textured) Pavements having thickness 60mm and compacted over a thin bedding sand layer of 30 mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of Spec |
| 17 | Provision for Name board |
| 18 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
| 19 | Part 3 : Construction of Anganwadi buiding at Koovakkapatty in Koovakkapatti PanchayatEstimate Amount : Rs.17.25 Lakhs |
| 20 | Earthwork excavation and depositing on bank with an initial lead and lift in all classes of soils and sub soils except in hard rock including all labour charges etc . Complete. |
| 21 | Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick including cost and conveyance etc., |
| 22 | Supplying and Filling foundation and basement with good M Sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. |
| 23 | Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. |
| 24 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x41/4\"x23/4\" including cost and conveyance of all materials to site and all labour charges etc complete (Below Basement) |
| 25 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x41/4\"x23/4\" including cost and conveyance of all materials to site and all labour charges etc complete (Above Basement) |
| 26 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ). |
| 27 | Below Basement |
| 28 | Above Basement |
| 29 | Sunshade |
| 30 | Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification. |
| 31 | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. |
| 32 | Providing granolithic flooring with CC 1:2:4 mix 25 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete |
| 33 | Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. |
| 34 | Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers.(The make and brand of the tiles should be got approved by Executive Engineer before use on works)Using anti-skid tiles (Observed Data) |
| 35 | Dadooing of walls with colour glazed tiles of size300x200x6 mmof best qualityincluding cost and conveyance of all materials to site and all labour charges etc complete. |
| 36 | Weathering course concrete using best quality broken brick jelly of size 20mm in pure slacked lime over the RCC roof slab in th proportion of brick jelly to lime being32:12.5 by the volume and laid over a single layer and consolidated to the required size |
| 37 | Finishing the top of the roof with one course of Machine Pressed Tiles of size 23x23x2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar,red oxide, etc., complete complying with standard specification |
| 38 | Supply ing and appl ying of two coats of p utty of 3 mm thick over the exposed RCC surfaceofceilingincludingfinishingthejointssmoothywithgrindingmachine andthesurfaceshallbethoroughlycleanedoutofdustandscrubbing.The Surfaceshallthen beallowedto dryforatleast48hours. Tt shallthen be sand papered(waterproofabrasivesheet)togiveasmoothandevens urface. Any uneven nessshallbe madegoodbyapplying1stcoatof puttymixedwithwater ontheentiresurfaceincludingfillinguptheundulationsandapplying2ndcoat 1 ofputtyalter6hoursof1stcoatofputtyandthensandpapering(waterproof a bra sive s heet)th e samearte ritisdryandfinishingthc surfa cesm oot hIy, «tc., |
| 39 | Plastering with CM 1:5,12mm thick including cost and conveyance of all materials to site and all labour charges etc.,complete |
| 40 | Distempering two coatsover priming coatinculding cost and conveyance of all materials to site and all labour charges etccomplete |
| 41 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all labour charges etccomplete |
| 42 | Supply and fixing of mild Steel Doors of any size with standard specification including cost and conveyance of all materials and all labour charges etc complete. |
| 43 | Supply and fixing of mild Steel Doors of any size with standard specification including cost and conveyance of all materials and all labour charges etc complete. |
| 44 | Supply and fixing of mild Steel Doors of any size with standard specification including cost and conveyance of all materials and all labour charges etc complete. |
| 45 | Supply and fixing of mild Steel Windows of any size with standard specification including cost and conveyance of all materials and all labour charges etc complete. |
| 46 | Supply and fixing of mild Steel Ventilator of any size with standard specification including cost and conveyance of all materials and all labour charges etc complete. |
| 47 | Supply and fixing of mild Steel Ventilator of any size with standard specification including cost and conveyance of all materials and all labour charges etc complete. |
| 48 | Painting two coats over new iron works using ready mixed enamel paint inculding cost and conveyance of materials and all labour charges etc.,complete |
| 49 | Cost, supply and fixing of Cuddappah slab 38/40mm thick for Shelf, Cupboard and Kitchen top including cost and conveyance of all materials and labour charges etc., complete |
| 50 | Providing and fixing of PVC rain water down fall pipe 110mm dia with necessary T WClamps, Plug, Shoes, bend, Screws, nails etc., complete |
| 51 | Provision for Electrification |
| 52 | Fan point & Light point (SD 18) |
| 53 | Ceiling fan (SD 110) |
| 54 | Supply and fixing of 4\" 40W flu fitting complete with copper choke and condensor SD 88 |
| 55 | Supply and fixing of 4\" 18 W LED tube light SOR -M1211 |
| 56 | Exhaust fan (SD 114) |
| 57 | Plug point (SD 38) |
| 58 | Service wire (SD 62) |
| 59 | Supplying & Fixing in position of baby friendly Water closet of approved quality including cost and conveance of all etc., complete |
| 60 | Supplying & Fixing in position of European Water closet of approved quality including cost and conveance of all etc., complete |
| 61 | Supplying & Fixing in position of White hand wash basin of good quality including cost and conveyance of all etc., complete |
| 62 | Provision for Rain water harvesting sturucture (1 Nos) |
| 63 | Provision for painting cartoons / BaLA in hall |
| 64 | Provision for 500 litres water tank |
| 65 | Provision for Name board |
| 66 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
| 67 | Part 4 : Construction of Anganwadi buiding at Karattupatty in Koovakkapatti PanchayatEstimate Amount : Rs.17.25 Lakhs |
| 68 | Earthwork excavation and depositing on bank with an initial lead and lift in all classes of soils and sub soils except in hard rock including all labour charges etc . Complete. |
| 69 | Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick including cost and conveyance etc., |
| 70 | Supplying and Filling foundation and basement with good M Sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. |
| 71 | Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. |
| 72 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x41/4\"x23/4\" including cost and conveyance of all materials to site and all labour charges etc complete (Below Basement) |
| 73 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x41/4\"x23/4\" including cost and conveyance of all materials to site and all labour charges etc complete (Above Basement) |
| 74 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ). |
| 75 | Below Basement |
| 76 | Above Basement |
| 77 | Sunshade |
| 78 | Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification. |
| 79 | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. |
| 80 | Providing granolithic flooring with CC 1:2:4 mix 25 mm thick includingcost and conveyance of all materials to site and all labour charges etc complete |
| 81 | Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. |
| 82 | Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers.(The make and brand of the tiles should be got approved by Executive Engineer before use on works)Using anti-skid tiles (Observed Data) |
| 83 | Dadooing of walls with colour glazed tiles of size300x200x6 mmof best qualityincluding cost and conveyance of all materials to site and all labour charges etc complete. |
| 84 | Weathering course concrete using best quality broken brick jelly of size 20mm in pure slacked lime over the RCC roof slab in th proportion of brick jelly to lime being32:12.5 by the volume and laid over a single layer and consolidated to the required size |
| 85 | Finishing the top of the roof with one course of Machine Pressed Tiles of size 23x23x2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar,red oxide, etc., complete complying with standard specification |
| 86 | Supply ing and appl ying of two coats of p utty of 3 mm thick over the exposed RCC surfaceofceilingincludingfinishingthejointssmoothywithgrindingmachine andthesurfaceshallbethoroughlycleanedoutofdustandscrubbing.The Surfaceshallthen beallowedto dryforatleast48hours. Tt shallthen be sand papered(waterproofabrasivesheet)togiveasmoothandevens urface. Any uneven nessshallbe madegoodbyapplying1stcoatof puttymixedwithwater ontheentiresurfaceincludingfillinguptheundulationsandapplying2ndcoat 1 ofputtyalter6hoursof1stcoatofputtyandthensandpapering(waterproof a bra sive s heet)th e samearte ritisdryandfinishingthc surfa cesm oot hIy, «tc., |
| 87 | Plastering with CM 1:5,12mm thick including cost and conveyance of all materials to site and all labour charges etc.,complete |
| 88 | Distempering two coatsover priming coatinculding cost and conveyance of all materials to site and all labour charges etccomplete |
| 89 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all labour charges etccomplete |
| 90 | Supply and fixing of mild Steel Doors of any size with standard specification including cost and conveyance of all materials and all labour charges etc complete. |
| 91 | Supply and fixing of mild Steel Doors of any size with standard specification including cost and conveyance of all materials and all labour charges etc complete. |
| 92 | Supply and fixing of mild Steel Doors of any size with standard specification including cost and conveyance of all materials and all labour charges etc complete. |
| 93 | Supply and fixing of mild Steel Windows of any size with standard specification including cost and conveyance of all materials and all labour charges etc complete. |
| 94 | Supply and fixing of mild Steel Ventilator of any size with standard specification including cost and conveyance of all materials and all labour charges etc complete. |
| 95 | Supply and fixing of mild Steel Ventilator of any size with standard specification including cost and conveyance of all materials and all labour charges etc complete. |
| 96 | Painting two coats over new iron works using ready mixed enamel paint inculding cost and conveyance of materials and all labour charges etc.,complete |
| 97 | Cost, supply and fixing of Cuddappah slab 38/40mm thick for Shelf, Cupboard and Kitchen top including cost and conveyance of all materials and labour charges etc., complete |
| 98 | Providing and fixing of PVC rain water down fall pipe 110mm dia with necessary T WClamps, Plug, Shoes, bend, Screws, nails etc., complete |
| 99 | Provision for Electrification |
| 100 | Fan point & Light point (SD 18) |
| 101 | Ceiling fan (SD 110) |
| 102 | Supply and fixing of 4\" 40W flu fitting complete with copper choke and condensor SD 88 |
| 103 | Supply and fixing of 4\" 18 W LED tube light SOR -M1211 |
| 104 | Exhaust fan (SD 114) |
| 105 | Plug point (SD 38) |
| 106 | Service wire (SD 62) |
| 107 | Supplying & Fixing in position of baby friendly Water closet of approved quality including cost and conveance of all etc., complete |
| 108 | Supplying & Fixing in position of European Water closet of approved quality including cost and conveance of all etc., complete |
| 109 | Supplying & Fixing in position of White hand wash basin of good quality including cost and conveyance of all etc., complete |
| 110 | Provision for Rain water harvesting sturucture (1 Nos) |
| 111 | Provision for painting cartoons / BaLA in hall |
| 112 | Provision for 500 litres water tank |
| 113 | Provision for Name board |
| 114 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
| 115 | Part 05 : Improvements to Samathuva burial ground at Vellayagoundanur in Koovakkapatty panchayat(Compound wall, Waitingshed, CC pavement, water supply with Sintex tank)Estimate Amount : Rs.6.95 Lakhs |
| 116 | Waiting shed |
| 117 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 118 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete |
| 119 | Refilling the basement with excavated earthother than sandcomplying the Standard specification |
| 120 | Brickwork in Cement mortar 1 : 5 mix using new II class bricks including cost and conveyance of all materials to site and labour charges etc complete. |
| 121 | Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at about 90 cms center to center and supported causorina props of 10 cm to13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)for column |
| 122 | Column and Sunshade |
| 123 | …Do.. For Slab and Beam |
| 124 | Supplying, fabricating and placing in position mild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rod |
| 125 | R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete |
| 126 | Supply ing and appl ying of two coats of p utty of 3 mm thick over the exposed RCC surfaceofceilingincludingfinishingthejointssmoothywithgrindingmachine andthesurfaceshallbethoroughlycleanedoutofdustandscrubbing. |
| 127 | Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete. |
| 128 | C.C. 1:2:4-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete |
| 129 | Painting two coats with approved PlasticEmulsion Paint over one coat of Primaring coat of Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications |
| 130 | Compound wall |
| 131 | Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B |
| 132 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. |
| 133 | Supplying and erecting centering for sides and soffits including support and strutting cost and conveyance of all materials & all labour charges etc., complete. |
| 134 | RCC 1:11/2:3 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete. |
| 135 | Supplying and fabrication of steel rods including cost & conveyance of steel as per std. Specification etc., complete. |
| 136 | Brick work in c.m 1:5 mix using country bricks including cost & conveyance of all materials to site and all labour charges etc., complete. |
| 137 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials & all labour charges etc., complete. |
| 138 | Painting two coats with ready mixed Plastic emulsion of first qualitypaint and Approved colour over priming coat including thorough Scrapping clean removal of dirt etc complete |
| 139 | Provision for CC Pavement |
| 140 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 141 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. |
| 142 | Supply and errection of centering and shuttering charges for all PCC Works including all cost and conveyance of all materials and all labour charges etc complete |
| 143 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal including all cost and conveyance of all materials and all labour charges etc complete |
| 144 | Provision for bitumenpad charges including all cost and conveyance of all materials and all labour charges etc complete |
| 145 | Provision for Water Supply |
| 146 | 63mm PVC Pipe |
| 147 | 63mm PVC Elbow |
| 148 | HDPE Tank (1000Ltr) |
| 149 | 63mm PVC MTA |
| 150 | 63mm PVC Balvalve |
| 151 | labour charges for constructin of sintex tank pedastel arrangements including cost of masonrymeterialsand labour etc., complete. |
| 152 | Earth work excavation hard stiff clay and hard rock earth and pipe laying , jointing and refilling the trench with excavation soils For Pipeline |
| 153 | Labour charges for Laying of PVC Pipe and specials fixing charges etc., complete. |
| 154 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |