| 1 | CONSTRUCTION OF Anganwadi Building@ Sittampoondi Panchayat |
| 2 | Earth work excavation for foundation in all classes of soils and sub soil to full depthexcept in hard rock requiring blasting but inclusive of shoring struttingif required forthe sides of foundation. |
| 3 | Supplying and filling in foundation and basement with good sand in layers not more 15 cm thick including ramming, watering and compacting etc.complete complying to standard specification |
| 4 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed. |
| 5 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. |
| 6 | Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification. |
| 7 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels, |
| 8 | BGL |
| 9 | AGL |
| 10 | Reinforced cement concrete 1; 11/2;3 using 20mm iss HBG metal including the cost and conveyance of all meterials and cost of all labour charges etc complete |
| 11 | Plastering cm 1;4 -20mm Thick including the cost and conveyance of all materials and cost of all labour charges etc., complete. |
| 12 | Finishing the Top of Roof with one course of solar reflective tiles cm laid incement mortor 1 : 3 mix and Pointingwith the same mortor mixed with water proof compoundincluding cost conveyance of all materials and labour charges etc complete |
| 13 | Dadooing the walls with glazed tiles including the cost and conveyance of all materials and cost of all labour charges etc., complete |
| 14 | Flooring using 2\" x 2\" vitrified tiles approved and pointing with same colourincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 15 | Providing Scratch proof ceramic tiles including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc, complete. |
| 16 | Granolithic flooring using 10 - 12mm chips including cost and conveyance of all materials to site and all labour charges etc complete |
| 17 | Ceiling Plastering with cement mortar 1:3 mixto 10 mm thick for R.C.C. Items including cost and conveyance of all materials to site and all labour charges etc complete |
| 18 | Plastering cm 1;5 -12mm Thick including the cost and conveyance of all materials and cost of all labour charges etc., complete. |
| 19 | Supply and Applying wall putty 3mm including all charges |
| 20 | Distempering two coat using oil bound Distemper including cost of distemper and labour charges, etc, complete. |
| 21 | Painting Two coat approved cement paint over the plastered surface including cost and all other charges etc., |
| 22 | Painting Two coat Enamel paint over the New iron work surface including cost and all other charges etc., |
| 23 | Supply of steel doors and windows |
| 24 | Door0.90x2.10 m |
| 25 | Door0.75x1.20 m |
| 26 | Door1.10 x 2.10 m |
| 27 | Window1.20 x 1.300 m |
| 28 | Vernilator 0.90x0.45 |
| 29 | Supply and fixing of Cuddappa slab including cost and conveyance of cuddappa slab and labour charges for fixing etc, complete. |
| 30 | Cost and Supply of RCC Jolley |
| 31 | Provision for Rain water arrangements |
| 32 | Supply and fixing baby watercloset with P- trap |
| 33 | Supply and fixing European water closet with all accesoories |
| 34 | Providing Following Electrification items |
| 35 | Provision for Labour charges Fixing Door and Window |
| 36 | Provision for Sanitary Arrangement |
| 37 | Provision for 500litre Syntex tank with Water Supply |
| 38 | Provision for Rain water Structure |
| 39 | Provision for Wall Painting Charges |
| 40 | Citizen Information Board |
| 41 | Provision for Photo charges |
| 42 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |