| 1 | Construction of Cremation shed, Compound wall, CC Road and Water Supply Work forkuppdasan kottai samathuvapuram burialground |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing, laying and curing etc complete |
| 4 | Supplying and erecting shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footings, column, pedestals, plinth beam, grade beams, raft slabs, staircase steps, bed blocks, critical pier etc. |
| 5 | Above ground level |
| 6 | Supplying fabricating and placing in position mild steel or nibbled for steel for all reinforced cement concrete works as per the desing given including cost of steel and binding wire in all floors etc. complete complying with standard specification (MS rods or RTS bars will be supplied department sally at section stores and cost will be recovered at issue rate). The binding wire shall be supplied by the Contractor. |
| 7 | Reinforced cement concrete 1:1.5:3 mix using 20mmISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete |
| 8 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x41/4\"x21/4\"and conveyance of all materials to site and all labour charges etc complete |
| 9 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 10 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 11 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil |
| 12 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 13 | Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etc |
| 14 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 15 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 16 | Cement Concrete 1:2:4 (one cement, twoM.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. |
| 17 | Provision for 12 mm thick bitumen pad for expansion joints etc |
| 18 | Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation. |
| 19 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 20 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 21 | Refilling the basement with excavated earthother than sandcomplying the Standard specification |
| 22 | Dry Brick workusing country bricks 9\"x4 1/2\"x3\" including cost and conveyance of all materials to site and all labour charges etc complete |
| 23 | Brick Workin CM 1:5 mix using II Class Bricksincluding cost and conveyance of materials and labour chargesetc complete. - 100.00 Cft |
| 24 | Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc.,using mild steel angles of sizes 90x60x10cmgauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon |
| 25 | Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc.,using mild steel angles of sizes 90x60x10cmgauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon |
| 26 | Supplying and fabricating and placing inposition mild steel or Ribbed Tor Steel for all reinforced cement concrte works as per the design given incuding cost of steel and binding wire in all floor etc. complete complying with standard specification (MS rods or RTS bars will be supplied departmentally at section stores and cost will be recovered at issue rate). The binding wire will be supplied by the contractor as per clause MOST specification. |
| 27 | Reinforced cement concrete 1:1.5:3 mix using 20mmISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete Deck Slab |
| 28 | Plastering with cement mortar 1:3 mixto 10 mm thick including cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm |
| 29 | Plastering with cement mortar 1:5 mixto 12 mm thick including cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm |
| 30 | Painting two coats with approved Emulsion over one coat of Priming coat of Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B) ( NEW SURFACE) |
| 31 | Provision for water supply work |
| 32 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)(12% GST ) |