Tender For Maintenance Repair To Eroded Left Bank Of River Mundeswari For A Length Of 50 M At Mouza -Purba Krishnapur, G.P.-Harinkhola-I, Block-Arambagh, Dist - Hooghly Under Champadanga Irrigation Sub Division Of Lower Damodar Irrigation Division In Th, Arambagh-West Bengal
TDR : 48589331
Tender Notice
Corrigendum Details
BOQ
Expired
Arambagh
West Bengal
Corrigendum : Tender For Maintenance Repair To Eroded Left Bank Of River Mundeswari For A Length Of 50 M At Mouza -Purba Krishnapur, G.P.-Harinkhola-I, Block-Arambagh, Dist - Hooghly Under Champadanga Irrigation Sub Division Of Lower Damodar Irrigation Division In Th
Name of Work:M/R to eroded Left Bank of river Mundeswari for a length of 50 m at Mouza -Purba Krishnapur, G.P.-Harinkhola-I, Block-Arambagh,Dist :- Hooghly under Champadanga Irrigation Sub Division of Lower Damodar Irrigation Division in the year of 2025-2026
Sl. No.
Item Description
1
Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete.
2
Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the cratewith nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.NB:- Volume of each earth/ sand filled bags should not be less than0.028 m3.Size of Nylon crate is 1metre X 1metre X 1metre.(a) Where boats are not necessary.
3
Supplying to site empty cement polythene bags (capacity 50kg) in good conditionincludingstacking,incedentalchargesetc.allcomplete(capacity 50 kg).
4
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag.
5
Dumping in position earth / sand filledgunny / poly bags(capacity 50 kg) within a lead of 30 metre inclusive of all lifts.
6
Extra rate for item no above for each additional lead of 60 metre or part thereof beyond the initial lead of 30 metre.
7
Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5cm.diameter. (Dia.tobe measured at mid length).
8
Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.(a) Where boats are not necessary.
9
Supplying, fitting and fixing with iron nails half splitbamboowailing pieces (av. dia. of bamboo not less than 5.0 cm.)
10
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,A) Beyond 500 metre and upto 1.00 km.NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.( This rate is includes compensation for earth for land owned / arranged by the contractor @ Rs 25.00 per cum androyalty charges on earth @ Rs 29.00 per cum & Cesses Charges @ 5.30 per Cum(i.e Rs 15.00 per 100 cft) as per Government notification whichwill be paid onproduction of necessary documents in support of paymentmadetowards the royalty and cesses.)
11
Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.(a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.