|
| 1 | Material |
| 2 | Supply of dead end clamp with ihook |
| 3 | Supply of distribution box clamp with nut & bolts both 1 & 3 phase |
| 4 | Supply of suspension clamp ihook with nut & bolts |
| 5 | Supply of Pole clamps with nut & bolts |
| 6 | Supply of shead head type insulation Peericing connectors, jumpring for jumpring to line to line tapping. (70x70sqmm, 70x35 & 70x16sqmm) etc.. |
| 7 | Supply of LT bare neutral connector PG clamp made of A.l 50x50 sqmm double bolt for line to line jumpering |
| 8 | Supply of LT bare neutral connector PG clamp made of A.l 50x16 sqmm double bolt for line to line jumpering |
| 9 | Supply of mid span insulated jointing sleeves subatiable for LT ABC as per UPCL Specification. |
| 10 | Supply of head shrink type of cap sutaiable for LT ACB as per UPCL Specification. |
| 11 | SMC 3Phase LT Distribution Box for new & replacement of damaged old distribution box both 1 & 3 phase. |
| 12 | SMC 1Phase LT Distribution Boxfor new & replacement of damaged old distribution box both 1 & 3 phase. |
| 13 | Supply of MS clamp with nut & bolt, Pole & other size pole. |
| 14 | Supply of 1x35sqmm XLPE including A.l Cable |
| 15 | Supply of MS Stay clamp for PCC Pole SP-21, SP-10, SP-23 made of MS flat size 50x6 mm with 2 nos, nut & bolts size 65x16mm for suspension clamps assemble without cracks & borst painted by primer |
| 16 | Supply of special type holding clamps for GI hooks with nuts & bolts |
| 17 | Supply of 1x35sqmm All lugs |
| 18 | LT AB Cable 3×95+1×50 sqmm |
| 19 | LT AB Cable 3×70+1×50 sqmm |
| 20 | LT AB Cable 3×35+1×25 sqmm |
| 21 | Labour |
| 22 | Dismantling of old ACSR conductor (Dog/weasel) (LT line) including Re- rolling back its conductor, wire, clamp insulator etc. including stacking & transportation of material to the UPCL store : 3 phase 4 wire 2 phase 3 wire |
| 23 | Carrying the material from dump store to site of work Mannual (approx dis. 01 km) |
| 24 | Carrying the material from dump store to site of work head load (approx dis. 00-01 km) Cable & other materials |
| 25 | Erection & Grouting of Pole for long span for reducing span |
| 26 | Erection of stay set 16x1800 sqmm |
| 27 | Laying, Stringing and Sagging of AB Cable size (3x95+1x50sqmm) |
| 28 | Laying, Stringing and Sagging of AB Cable size (3x70+1x50sqmm) |
| 29 | Laying, Stringing and Sagging of AB Cable size (3x35+1x25sqmm) |
| 30 | Fixing of Dead End clamps with ihook |
| 31 | Fixing of Distribution Box clamps with nuts & bolts |
| 32 | Fixing of Suspension clamp with ihook N&B |
| 33 | Fixing of Pole clamps with nuts & bolts |
| 34 | Fixing of shere head type insulation peering connectors jumpering for line to line/tapping 70-70sqmm |
| 35 | Fixing of shere head type insulation peering connectors jumpering for line to line/tapping 70-35sqmm |
| 36 | Fixing of shere head type insulation peering connectors jumpering for line to line/tapping 70-16sqmm |
| 37 | Fixing of LT bare netural connectors PG clamp made of A.l 50sqmm to 50sqmm double bolt. |
| 38 | Fixing of LT bare netural connectors PG clamp made of A.l 50sqmm to 16sqmm double bolt |
| 39 | Erection of mid span insulated jointing sleeves suitable for LT ABC as per UPCL specification. |
| 40 | Fixing of heal shink type and caps suitable for LT ACB as per UPCL Specification. |
| 41 | Erection of SMC three phase LT Distribution box (Complete) |
| 42 | Erection of SMC Single phase LT Distribution box with (Complete) |
| 43 | Fixing of MS clamps, LT clamps for pole with nuts & bolts without cracks & burrs. |
| 44 | Fixing of 1x35sqmm XLPE including Al. cable |
| 45 | Fixing of MS Stay Clamp for Pole, SP-21, SP-10, SP-23. |
| 46 | Fixing of special typeholding clamps for JI hooks with nuts & bolt. |
| 47 | Fixing of 35 sqmm All lugs. |
| 48 | Removal of perivous connections & reconnection of single phase/Three phase LT consumer service connection. |
| 49 | Fixing of Aluminium Lugs |