| 1 | Name of work: Construction of Multi purpose centre at Ayyankadu H/O Kavundapadi |
| 2 | Earth work excavation in hard gravelly soil with initial lead andlift in narrow Trench as per SS20 B for Foundation. |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 4 | Supply of conveyed earth including cost and conveyance of all materials to site including all labour charges for filling etc.complete. |
| 5 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guagestiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cmcentre to centre complete complying with standardspecifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. |
| 6 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guagestiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cmcentre to centre complete complying with standardspecifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. |
| 7 | For Columns, Sunshades,sill slabs etc |
| 8 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for etc complete |
| 9 | Supplying and fabrication of steel for R.C.C.works including cost and conveyance to site and all labour charges etc., complete. |
| 10 | Brick work in C.M.1:5 mix using country Bricks including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 11 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. |
| 12 | Providing Granolethic floor finish in cement concrete 1:2:4 mix using 10 -12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc., complete |
| 13 | Plastering with cement mortar 1:3 mixto 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete |
| 14 | Plastering in C.M.1:5 mix,12 mm thick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 15 | Cost and supply of Steel Door-D (0.90x2.10m) |
| 16 | Cost and supply of Steel Window (0.90x1.30m) |
| 17 | Cost and supply of Glazed Ventilator (0.90x0.45m) |
| 18 | Supply of Rolling shutter including cost and conveyance of material and labour charges etc., complete. |
| 19 | Labour charges for fixing of Door |
| 20 | Labour charges for fixing of Window and Ventilater |
| 21 | Supplying of 110mm 4 ksc PVC pipe |
| 22 | Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete |
| 23 | Painting two coats of new plaster surface with Exterior emulsion paint including cost and conveyance of paint and all labour charges etc complete |
| 24 | Painting two coats over new iron works using ready mixed enamel paintincluding cost and conveyance of paint and all labour charges etc complete |
| 25 | Wiring with 2 x 1.5 sq.mm. (22 / 0.3) PVC insulated SC unsheathed copper conductor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessoires in flush with wall with 3mm thick hylum sheet cover with TW switch box and 5A FT switch and making good of the concealed portion with suitable colour for PVC concealed light / fan Point (for electronic regulator) (5 points per coil) (SD 25) |
| 26 | Wiring with 2 x 1.5 sq.mm. (22 / 0.3) PVC insulated SC unsheathed copper conductor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories in flush with wall with 150mm x 100mm x 113mm TW switch box with 3mm thick hylem sheet cover for 5A 3 pin non inter locking wall socket with 5A flush type switch with continuous earth wire connection of 14 SWG TC wire and making good of the concealed portion with suitable colour for concealed PVC plug point (SD 38) |
| 27 | Supply and fixing of single box type 4\"40W fluorescent fitting complete with copper choke and condensor with TW round blocks on wall or ceiling with flu tube with PVC unsheathed copper leads from terminals to the fitting (SD 88) |
| 28 | Supply and fixing of TNEB meter board suitable for 32A single phase service connection with 32A fuse unit (500V) 32A neutral link and earth link (1\" x 1/8\" copper flat) on TW plank of size 375mm x 300mm x 19mm with supporting TW reepers of 1\" thick an either side with painting with suitable bolt and nuts for fixing the TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EB meter to fuse unit (SD 125) |
| 29 | Supply and fixing of 1200mm (48\") AC ceiling fan complete with stepped electronic 300W regulator with 300mm down rod on the existing clamp (SD 110) |
| 30 | Drawing and writtingdetails of scheme |
| 31 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column \"BB\" for all works in this package} |