| 1 | Dismantling and removing lime concrete flooring 7.5 cm to 10 cm thick including stacking the useful materials for reuse and removing the debries with in 50 m lead. |
| 2 | Supplying all labour, material T&P for earth work inexcavation of foundation in all kinds of soil with 50 Mtr. initial lead and 1.5 mtr. lift including rough dressing and leveling the bed etc. all complete as per PW specification and direction of Engineer-in-charge. |
| 3 | Supplying all labour, material T&P for filling foundation and plinth with raw sand well watered and rammed etc. all complete including cost, conveyances, and royalty of all materials to site as per PW specification and direction of Engineer-in-charge. |
| 4 | Providing, laying, spreading and compacting graded stone aggregate to with Wet Mix macadam .specification including premixing the material with water at OMC in mechanical mix plant , carriage of mixed material by tipper to site, layingand spreading in uniform layers with paver in sub base/ base course on well preparedsurface and compacting with vibratory roller to achieve the desired density complete as per Clause 406 of MoSRT&H Specifications for Road & Bridge works (4th Revision)including all cost, conveyance, taxes of all materials and labour etc all complete as per the required specification and thedirection of the Engineer-in- Charge |
| 5 | RCC work of M 25 grade with 20 mm and down grade black hard granite (Crusher broken) stone chips including hoisting and laying. |
| 6 | Supplying and fixing of 80 mm thick cement concrete interlocking paver block of M-40 grade of approved make , design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC SP- 63: 2018. |
| 7 | Supplying all labour, material T&P for providingP.C.C.(1:2:4) using 12mm size H.B.G. chipsincluding hoisting and layingetc. all complete including cost, conveyances, and royalty of all materials to site and curing as per PW specification and direction of Engineer-in-charge |
| 8 | Supplying all labour, material T&P for providing rigid and smooth centering and shuttering for RCC work including false work and dismantling them after casting etc. all complete including cost, conveyances, and royalty of all materials to site as per PW specification and direction of Engineer-in-charge. |
| 9 | Supplying all labour, material T&P for providing rigid and smooth centering and shuttering for RCC work including false work and dismantling them after casting etc. all complete including cost, conveyances, and royalty of all materials to site as per PW specification and direction of Engineer-in-charge. slab] |
| 10 | Supplying all labour, material T&P for providing rigid and smooth centering and shuttering for RCC work including false work and dismantling them after casting etc. all complete including cost, conveyances, and royalty of all materials to site as per PW specification and direction of Engineer-in-charge. [ wall ] |
| 11 | Removal of excavated earth by mecanical means to an average lead of 5 KM. |
| 12 | Add for photograph and display board etc complete. |