| 1 | Item No.1: Cleaning grass and removal of rubbish up to a distance of 50 meters outside the periphery of the area as directed. |
| 2 | Item No.2: Excavation in all kinds of soil/Hard Murum/Soft Rock including boulders upto 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drains/catch water drains etc. and placing the excavated stuff neatly in dump area or for formation of service road/ embankment as directed including cost of all materials, machinary,labour, dressing bed and sides to required level and profile etc. complete with lead upto 1 km and all lifts as directed. |
| 3 | Item No. 3: Excavation in hard rock of all toughness by ordinary blasting methods including boulders above 0.6 m dia.(0.113Cum) minimising damage to side slopes of excavation in water prism area by adopting any one or combination of line drilling /pre-splitting /smooth blasting techniques and placing the excavated rock neatly in approved dump area including cost of all materials, machinery, labour,levelling bed etc., complete with lead upto 1 km and all lifts as directed. |
| 4 | Item No.4 : Providing and laying rubble soling below foundation in layers including filling with rubble chips, murum etc. complete as directed. |
| 5 | Item No.5 : Providing and laying in situ cement concrete of grade M-15 of trap / granite / gneiss / quartzite / graded metal for foundation and bedding by Batching Plant & Transit Mixer including centering, shuttering, scaffolding, placing, compacting, curing etc. complete with all lifts as directed. |
| 6 | Item No. 6 : Providing and laying insitu cement concrete of grade M-20 of trap/granite/gneiss/quartzite/graded metal for RCC works of abutment, wingwalls, returns, transition walls, piers, columns, beams and slabs, diaphragm walls, road slabs trough (Box Culvert) trough for aqueduct, wearing coat,etc. with Batching Plant and Transit mixer including centering, shuttering, scaffolding, placing, compacting, curing etc. complete with all lifts as directed. |
| 7 | Item No.7 : Providing and fixing in position TMT-FE-500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules.including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete as directed. |
| 8 | Item No.08 : Back filling up to ground level behind the canal structures etc. complete (without royalty) with suitable material of approved quality in layers not exceeding 20 cm without disturbing the structure etc. complete. |
| 9 | Item No. 9 :Providing and laying weep holes of 100 mm diameter PVC pipes as per drawing for abutment returns, return walls etc. Complete.ayers not exceeding 20 cm without disturbing the structure etc. complete. |
| 10 | Item No. 10 : Providing and constructing 300 mm thick dry rubble stone pitching with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials,labour,machinary ,hand packing / wedging stone chips, finishing etc.,complete with lead upto 1km and all lifts as directed. |
| 11 | Item No. 11 : Dewatering by pumping out water collected with Diesel or Electrical pumps including cost of all materials, machinery, labour, providing sump and all other ancillary operations whenever necessary etc. complete under specific and indispensable circumstances with prior approval from competent authority with authentic evidence of records justifying dewatering etc. complete as directed . |
| 12 | Item No. 12: A. Providing R.C.C .pipe of NP3 class conforming to IS458 2003 of following diameter including cost of all material and labour required, inspection charges, transportation to stores, transit insurance, loading,unloading and stacking excluding GST levied by GOI and GOM in all respect etc. complete as directed.B.Laying and jointing R.C.C. pipe of NP3 class or IRC standard in C.M. 1:2, proportion by volume including cost of all materials (excluding pipes and collars), labour, aligning pipes, batching and mixing mortar, packing joints with hemp and mortar, finishing, curing etc.complete with all lifts as Directed. |
| 13 | Add 1% Insurance Charges On Work Portion |
| 14 | Royalty Charges |
| 15 | i)Rubble |
| 16 | ii) Artificial Sand |
| 17 | iii) Aggregate |
| 18 | iv) Murum |