| 1 | Earth work in excavation in ordinary soil of old PATRA filling for the construction of canal inclding all lead,lift and T&P etc required for proper completion of work . |
| 2 | Earth work in excavation in mixed soil with lime stone, sand stone or other soft rock by pick axes but not required blastingfor the construction of canalabove 10 cum discharges including all lead ,lift,labour and T & P etc required for proper completion of work. |
| 3 | Excavating other rocks by blasting removing muck and stacking includingall lift, lead upto 90 m, labour and T & P etc required for proper completion of work. |
| 4 | Excavating other rocks by blasting removing muck and stacking includingall lift, lead upto 210 m, labour and T & P etc required for proper completion of work. |
| 5 | Earth work in filling by power transport for making embankment for the construction of canal section with lead upto 1.0 Km and lift including cost of soil, labour charges and T & P etc with vibro mechanical compaction to achieve min 95.0 % dry density along with proper dressing and watering to bring at O.M.C. required for proper completion of work . |
| 6 | Earth work in filling by power transport for making embankment for the construction of canal section with lead upto 2.0 Km and lift including cost of soil, labour charges and T & P etc with vibro mechanical compaction to achieve min 95.0 % dry density along with proper dressing and watering to bring at O.M.C. required for proper completion of work . |
| 7 | Earth filling with useful quantity of excvavated earth in making canal section including cost of mechanical compaction, labour and T&P etc required for proper completion of work. |
| 8 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. |
| 9 | Providing and laying of 600 mm dia hume pipe at crossing of SUKHARA minor at km 25.850 in R.K.C.Including RCC M-25 color joint 50 cm thick surrounding of pipe, 8 cm thick filling of sand in bottom of pipe , 60cm width , 3 mtr length and 1.5 m height of RRM wall 1:3 stone masonary with pointing at end and out of crossing of canal including cost of steel.shuttering, labour , T&P royalty etc for proper completion of work. |
| 10 | Providing and laying boulder in rock toe in canal filling including cost of boulder, labour, T&P etc required for proper completion of work. |
| 11 | Providing and laying boulder in rock toe in canal filling including cost of boulder, labour, T&P etc required for proper completion of work. |
| 12 | Providing and laying of stone ballast 4.75 mm to 20 mm in rock toe in canal filling including cost of stone ballast, labour, T&P etc required for proper completion of work. |
| 13 | Providing and laying boulder stone ballast 25 to 75 mm in rock toe in canal filling including cost of stone ballast, labour, T&P etc required for proper completion of work. |
| 14 | Earth work in excavation in foundation in all types of soil mixed with charri, bajari, kankar, soft rock, hard rocks etc. including wet earth work with slush with all lead and lift including back filling and disposal of surplus excavated earth including labours, T&P, taxes etc. for proper completion of the work. |
| 15 | M-15 (1:2:4) cement concrete with OPC-43 grade cement, Kanhar river sand FM³ 2.5, coarse aggregate of dalla grit,4.75-20mm. including cost of all material but excluding cost of cement, labour, T&P, lead & lift, mixing & placing with batching plant and concrete pump, roylity and all taxes etc. for proper completion of work. |
| 16 | Reinforced cement concrete inM-25 with OPC-43 grade cement, Kanhar river sand FM³ 2.5, coarse aggregate of dalla grit,4.75-20mm. including cost of all material but excluding cost of cement, labour, T&P, lead & lift, mixing & placing with batching plant and concrete pump, roylity and all taxes etc. but excluding cost of steel reinforcement for proper completion of work. |
| 17 | Centering and shuttering for RCC work including cost of labour, material, T&P, staging etc. required for proper completion of work. |
| 18 | Centering and shuttering for CC work including cost of labour, material, T&P, staging etc. required for proper completion of work. |
| 19 | Cutting, bending, placing and binding of steel reinforcement including cost of all material but excluding cost of steel,labour, T&P, M.S. binding wire for proper completion of work. |
| 20 | Providing and fixing of G.P. Sheet seal of 20 SWG 300mm. wide including cost of all materials, labour, T&P, cutting, bending, brazing, crimping etc. required for proper completion of work. |
| 21 | Providing and fixing of U type make from 22SWG 450mm. Wide copper seal including cost of all labour, material, T&P, cutting, brazing, crimping etc. for proper completion of work. |
| 22 | Providing and fixing of diamondsealwith 2No ISA size 75x75x10 iron flat 150x25x6@200mm. c/c for fixing anhle sheet of 16 SWG 510mm. MS sheet 1.63 mm wide 40-80 grade sealing compound including cost of brazing,cutting, bending, brazing, crimping etc. required for proper completion of work. |
| 23 | Providing and fixingof PVC water stop seal 225 mm. wide including cost of all labour, material, T&P, cutting, brazing, crimping etc. for proper completion of work. |
| 24 | Providing and fixingof PVC water stop seal 300 mm. wide including cost of all labour, material, T&P, cutting, brazing, crimping etc. for proper completion of work. |
| 25 | Providing and fixingjoint filler board (18mmThick in expansion joint including cost of alllabour, material, T&P etc..required brazing, crimping etc. for proper completion of work. |
| 26 | Laying corse sand including cost of all materials, labours, T&P etc. required of all proper completion of work as per direction of Engineer-in-Charge. |
| 27 | Supplying and laying of local sand inback filling including cost of all materials, labours, T&P etc. required for proper completion of work. |
| 28 | Suppling and laying hard stone dalla grit 4.75 mm. To 10mm size in filters and in gaps of C.C. block including costv of all material, , T&P lead etc. required for proper completion of work. |
| 29 | Suppling and laying hard stone dalla grit 10 mm. To 20mm size in filters and in gaps of C.C. block including costv of all material, , T&P lead etc. required for proper completion of work. |
| 30 | Supplying and Laying inverted coarse grain 20-40 mm in filter below C.C. block including cost of all materials, labours, T&P etc./Cum. |
| 31 | Providing and fixing Tarfelt in expansion joint including cost of all labour materials and T&P etc. required for proper completion of work. |
| 32 | Proviniding and fixing 100mm dia PVC pipe including cost of all material,labours, T&P, etc. required for proper completion of the work. |
| 33 | Providing and fixing of drainage G.I.Pipe 50 mm dia including cost of labour materials and T&P etc. required for proper completion of work |
| 34 | Random Rubble Masonery work in cement sand mortar (1:3) in wings wall and parapet wall including cost of all materials, labour, T&P etc required for proper completion of work. |
| 35 | Struck deep Pointing work for exposed surface of stone masonry in 1:2 CM with cement OPC-43 grade, sand etc. including cost of all material, labour and T&P etc required for proper completion of work. |
| 36 | Earth work infilling back fillingincluding all labours, T&P,taxes etc. for proper completion of the work. |
| 37 | Earth workIn making drain diversion work to facilitate proposed work on site properly with manual compaction including all labours, T&P,taxes etc. for proper completion of the work. |
| 38 | Stone boulder for pitching in launching apron side pitching beyond L.A. bed pitching including cost of allmaterials labours T&Pand taxes required for proper completion of the work. |
| 39 | Dewatering of Foundation by hiring diesel pump 5 HP/Electric motor of same capacity including operator cost, cost of dewatering equipment and its accessories, labour etc. |
| 40 | Providing & Fixing 1200mm. Ø HUME PIPE including cost of all material, labour, T&P etc. required for proper completion of work. |
| 41 | Providind & fixing NP-3, 1500 mm.Dia HUME Pipe including cost of all materials,carraige, labour,t&p etc required for proper completion of work. |
| 42 | Febrication of Steel Gate and Hosting Arrangement including cost of all materials, labour, T&P,etc. required for proper completion of work. |
| 43 | Poviding & Fixing of Angle Iron post (75xx75x10mm.) including cost of all material, labour and T&P etc. required for proper completion of work per Kg. |
| 44 | Providing and Fixing, Febrication Erection Trash Rack including cost of all materials, labour, T&P,etc. required for proper completion of work. |