| 1 | (Erection/Labour Part HT Line ) |
| 2 | Erection of S/T pole 11 mtr long,(Single pole structure) with RCC muff Including digging of pit of size 1.10x0.75x1.50, drilling of holes in poles, X-bracing set, X-arms, Fixing of insulators, X-arms, X- bracing set, fixing of barbed wire, Danger plate, filling of pit & ramming and painting of pole complete in all respects(C.C. 1:3:6 for muffing will be provided by the contractor). |
| 3 | Erection of S/T pole 11 mtr long,(Double pole structure) with RCC muff Including digging of pit of size 1.10x0.75x1.50, drilling of holes in poles, X-bracing set, X-arms, Fixing of insulators, X-arms, X- bracing set, fixing of barbed wire, Danger plate, filling of pit & ramming and painting of pole complete in all respects(C.C. 1:3:6 for muffing will be provided by the contractor). |
| 4 | Erection ofHT earthing setcomprising digging of pit, fixing of GI wire to the earth system,and filling of pit complete in all respects. |
| 5 | Erection of stay set HT line, comprising digging of pit, fixing of stay rod, filling of pit, Nozzeling and tightining complete in all respects. |
| 6 | Sagging of conductor 1 KM single GI wire, , comprising laying ofConductor, stringing & sagging, binding with insulator complete in all respects. |
| 7 | Erection of H T line with ACSR 6/1/4.72 (100 mm²) mmsuch as stringing, tensioning and sagging,jointing andfastening . |
| 8 | Mannual carriage of complete Material of H T line from road side to site of work for average distance of 0.25 KM lead. (Line .15 X .25= 0.03 kms Say 0.03) |
| 9 | Transportation Charges forcomplete Material of H T line |
| 10 | (Supply Part HT Line) |
| 11 | ACSR 6/1/4.72 (100 mm²) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage)} |
| 12 | Steel Tubular Poles (11 m, Working Load > 227 kgf/m²) (with Ruling Span 90 m, 8 No. Run thro\" and 3 No. Double Pole Dead End Structures) |
| 13 | Muffs (2000mm) with concerete filling |
| 14 | Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/ctolerance of 100 mm either side) x 8 structure(Run Through) |
| 15 | Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures (Run Through) |
| 16 | Pole Top Bracket [MSCI:100x50x6 mm- 100 mm] (Run Through) |
| 17 | 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure (Run Through) |
| 18 | Belt Set - MS Angle Iron: 50x50x6, Length :1800 mm x 2 No. (Dead End Structure) |
| 19 | X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm x 2 No.(Dead End Structure) |
| 20 | X-Arm (Horizontal) - MS Channel Iron C type: 100X50x6, Length: 2340 mm x 2 No.] ∆ Formation (Dead End Structure) |
| 21 | Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps, Straight stapples & Bend Stapples etc.) x (3 No. conductors) x (2 No. sides) (Dead End Structure) |
| 22 | 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure (Dead End Structure) |
| 23 | HT Earthing set complete |
| 24 | Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 3% (Sag, Earthing, Cross lacing above road and wastage)} @ 0.102 kg/m |
| 25 | Eye Hook for earth wire |
| 26 | GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 27 | X-Arm (Horizontal) - MS Channel Iron C type: 75X40x6, Length: 2800 mm x 2 No.] |
| 28 | GO Switch Handle Supporting Structure75X40x6, Length: 460 mm |
| 29 | Half clamps: [On Double Pole Dead End structure: 4 No; On Run Thro\" structure: 2 No ] |
| 30 | Full clamps: [On Double Pole Dead End structure: 4 No, Single Pole Run Thro\" structure: 2 No] |
| 31 | Danger Plate (250X200X1.6 mm) |
| 32 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] |
| 33 | Red Oxide |
| 34 | Aluminium Paint |
| 35 | Barbed Wire |
| 36 | (Erection/Labour Part Sub-Station No.-1 ) |
| 37 | Erection of63 kVA, 11/0.4 kV Sub-Stationcomplete in all respect |
| 38 | Mannual/ Transportation/ Loading /UnloadingCharges of complete Material of 63 KVA,11/0.4kV S/Stn from road side to site of work for average distance of 0.25KM lead. |
| 39 | (Supply Part Sub-Station No.-1) |
| 40 | Distribution Transformer (Ordinary), 11/0.4 kV,63 KVA |
| 41 | Muffs (2000mm) with concerete filling |
| 42 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line |
| 43 | MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA\"s |
| 44 | X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 45 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer BedTransformer Bed, Belting & Knee Bracing |
| 46 | X-Arm [Channel Iron (100x50x6 mm), Length : (460mm) x 2 Nos for supporting Main Channel of Transformer] Transformer Bed, Belting & Knee Bracing |
| 47 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos Transformer Bed, Belting & Knee Bracing (Transformer Bed, Belting & Knee Bracing) |
| 48 | MS Angle Iron (35X35x6 mm), Length : (460 ) x 2 Nos (Transformer Bed, Belting & Knee Bracing) |
| 49 | MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing(Transformer Bed, Belting & Knee Bracing) |
| 50 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 51 | MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos |
| 52 | GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm |
| 53 | GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 54 | D.O Fuse Unit |
| 55 | Surge Arrester, 9 kV Station Class(Porcelain Type) |
| 56 | Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) |
| 57 | Pipe Earthing Set and |
| 58 | 6 SWG GI wire For Earthing |
| 59 | LT Distribution Panel Box 63 kVA DTR with MCCB 100 amp 3P 35kA , ICS =100% ICU, Kit-Kit 200 Amp |
| 60 | Half Clamp (M.S. Flat 50X6 mm) |
| 61 | Full Clamps (M.S. Flat 50X6 mm) |
| 62 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] |
| 63 | Aluminium Thimble |
| 64 | Copper Thimble 200 Amp |
| 65 | Danger Plate |
| 66 | Barbed Wire |
| 67 | LT Cable (3.5 Core) 120 mm², |
| 68 | a). Aluminium Paint. |
| 69 | b). Red Oxide |
| 70 | Chain link fencing, Angle Iron, Gate etc for transformer fencing for sub station No.- 1 & Sub station No.- 2 |
| 71 | (Erection/Labour Part Sub-Station No.-2 ) |
| 72 | Erection of63 kVA, 11/0.4 kV Sub-Stationcomplete in all respect |
| 73 | Mannual/ Transportation/ Loading /UnloadingCharges of complete Material of 63 KVA,11/0.4kV S/Stn from road side to site of work for average distance of 0.25KM lead. |
| 74 | (Supply Part Sub-Station No.-2) |
| 75 | Distribution Transformer (Ordinary), 11/0.4 kV,63 KVA |
| 76 | Muffs (2000mm) with concerete filling |
| 77 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line |
| 78 | MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA\"s |
| 79 | X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 80 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer BedTransformer Bed, Belting & Knee Bracing |
| 81 | X-Arm [Channel Iron (100x50x6 mm), Length : (460mm) x 2 Nos for supporting Main Channel of Transformer] Transformer Bed, Belting & Knee Bracing |
| 82 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos Transformer Bed, Belting & Knee Bracing (Transformer Bed, Belting & Knee Bracing) |
| 83 | MS Angle Iron (35X35x6 mm), Length : (460 ) x 2 Nos (Transformer Bed, Belting & Knee Bracing) |
| 84 | MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing(Transformer Bed, Belting & Knee Bracing) |
| 85 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 86 | MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos |
| 87 | GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm |
| 88 | GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 89 | D.O Fuse Unit |
| 90 | Surge Arrester, 9 kV Station Class(Porcelain Type) |
| 91 | Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) |
| 92 | Stay set complete (i/c Stay Clamps) |
| 93 | Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) |
| 94 | Pipe Earthing Set and |
| 95 | 6 SWG GI wire For Earthing |
| 96 | LT Distribution Panel Box 63 kVA DTR with MCCB 100 amp 3P 35kA , ICS =100% ICU, Kit-Kit 200 Amp |
| 97 | Half Clamp (M.S. Flat 50X6 mm) |
| 98 | Full Clamps (M.S. Flat 50X6 mm) |
| 99 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] |
| 100 | Aluminium Thimble |
| 101 | Copper Thimble 200 Amp |
| 102 | Danger Plate |
| 103 | Barbed Wire |
| 104 | LT Cable (3.5 Core) 120 mm², |
| 105 | a). Aluminium Paint. |
| 106 | b). Red Oxide |
| 107 | (Supply Part of Metering Equipment) |
| 108 | Prov. CTPT combined unit (11KV/110V) 10/5 Amps |
| 109 | HT Energy Meters 3-ɸ, 3/4 wire CT-PT operated Static TriVector meter. (PT ratio-/ 110 V, CT ratio-/5 A) |
| 110 | Prov. AAAC conductor 7/3.15 mm for jumper |
| 111 | Prov.PVC control cable 12 core 4 mm2 (multistrand copper) |
| 112 | Prov. Aluminium Thimble 120mm |
| 113 | Prov. MSCI X-arm (2800X100X50X6mm) for CTPT bed (2Nos.) |
| 114 | Prov. MSCI X-arm (750X100X50X6mm) 2 Nos |
| 115 | Prov. MSAI Knee bracing set (750X50X50X6) 4Nos |
| 116 | CT/PT Beltinga)MSAI (2800X50X50X6mm) 2Nos |
| 117 | b)MSAI (460X35X35X6mm) 2Nos |
| 118 | Prov. MS nuts & bolts various size (Galvanised / coted Preferably 16mm O or more with flat and spring washers |
| 119 | GI Pipe with Elbow 20 mm dia 9 mtr length |
| 120 | (Erection Part of Metering Equipment ) |
| 121 | Erection of CT-PT unit for 11 KV HT Metering Equipment completed in all respect |
| 122 | Transportation Charges forcomplete Material |