| 1 | Uprooting weeds from the lawn plots and trenches area after 10 to 15 days of its flooding with water inlcuding disposal of uprooted vegetion |
| 2 | add for 23 time of uprooting weeds of same qty |
| 3 | Moving manually / with power machines |
| 4 | (a) Manually |
| 5 | add for 23 Month of mowing manually of same qty 23 times |
| 6 | (b) with power machine |
| 7 | add for 23 Month of mowing with power machine of same qty 23 times |
| 8 | Maintenance of shrubbery or hedges cutting including disposal of rubbish with all leads and lifts . (For 24 month) |
| 9 | add for 23 Month of Maintenance of shrubbery or hedges of same qty 23 times |
| 10 | Sweeping / cleaning of gardens roads lawns paths and disposal of all rubbish- |
| 11 | Add for 729 time of Sweeping / cleaning of same qty |
| 12 | [kqys Hkkx dh lQkbZ dk dk;Z laosnd }kjk lQkbZ gsrq vko\";d lkeku tSls >kM+w] dhVuk\"kd nokbZ bR;knh dh O;oLFkk vius Lrj ij djuh gksxh foHkkx }kjk vyx ls dksbZ Hkqxrku ns;h ugh gksxk A For 24 month |
| 13 | Security of the garden per gate for 24 hours in 3 shift with the exmilitary persons(for 24 Month)(Guard calculation- Naga ji Bag- 2 guard, Gopal niwas Bag 2 gard = Total 04 gourd in every three shift per day for 24 hr x 24 month=96 NOS |
| 14 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils |
| 15 | Supply & Stacking good soil of earth at site complete including loading unloading & Transportation etc. |
| 16 | Good soil of earth |
| 17 | Supply of dry manure including loading unloading,transportation & stacking at site. |
| 18 | Farm yard manure(organic) |
| 19 | Spreading of manure and good earth in required thickness (cost of manure and good earth to be paid separately). |
| 20 | Supply of insecticides & Pesticides at store in dust/liquid form complete. |
| 21 | Cholorophyriphos 20 Ec. |
| 22 | laosnd }kjk fuEu çtkfr;ksa ds \"kcZl dh vkiwfrZ ,oa yxkukAikS/kk LoLFk gksuk pkfg,A ikS/kksa dh Å¡pkbZ 0-40 ls 0-50 eh- rd A |
| 23 | Crape Myrtal /Hemelia /Lantana Selloviana /Lantana Yellow /Rukmani /Gaudichaudi |
| 24 | Jade Plant /Aclypha Tricolor /Kaner Dwarf /Copper Plant /Gudhal /Chandni/ Kamini Muraya /Callindra Pink Off. |
| 25 | Supply of different varities of tree/shrubs/climbers according to height and age of the plant at side including loading/unloading & transportation etc.complete |
| 26 | Different flowering plants 900mm to1500mm |
| 27 | Different varieties of climbers 900mm to 1500 mm |
| 28 | Supply of different varieties of indoor plantsin poly bags/earthen pot according to height growth and age of plant at site including loading unloading and transportation etc. complete |
| 29 | Cycussevelta 50mm to 75 mm dia |
| 30 | Furcaria gignita 50mm |
| 31 | Differentfycus plants tolairy 100mm |
| 32 | Different champa 215 cm height |
| 33 | Supply and plantation of Ground Covers including mortality replacement, loading- unloading transportation and maintenance for 60 days after planting the plants. (atleast 25 plants per sqm) as per direction of engineer-in-charge |
| 34 | Prunning & trumming and cutting of old big trees on the road side The contractor will deposit the cut wood in the Deptt.Calculation- |
| 35 | Maintenace of Plants by the contractor including of pits/bids watering preparation of Thavala Hoeing weeding etc. & application of insecticides etc. & security if the plant die during maintenance contractor has to replace same height plant at his own cost. (For 24 month) |
| 36 | Add for 23 month Maintenance of plants of same Qty |
| 37 | Maintenance of Hedge, Climbers, Shrubs at parks including watering, trimming, preparation of thawala, manure and complete work.(for 24 month) |
| 38 | Repair& maintenance of whole irrigation system Includding Watering garden, pop-up, sprinkler pipe line, valve tube well including replacement of pipe, pop-up, sprinkler,valve repairing of submersible pump and electric work of tubewell all respect and as per direction of Engineer-in-charge etc. (For 24 month) |
| 39 | Repair & maintenance of water cooler including replacement of all type of parts,electric work , gus filling andas per requirement, as per direction of engineer-in-charge. (04 Nos Water Coolerx 24 Months= 96 Nso.(For 24 month) |
| 40 | Maintenance, repairing etc of all type of Rides &jhoola\"s including welding , hamepring lampering, nut , bolts, Fiber, etc. |
| 41 | Repair and Maintenance of all equipments and lights, panel post,light, CFL, Complete Fountain (Jal Dhara) including replacement of damage cable, Electric Motor (12 Nos.) (and all electrical acessories (Nagaji ka bag, Gopal niwas bag, Ummed park)- Calculation- 1 Job x 24 month=24 Nos jobs |
| 42 | Jaldhara operation including fountain, water park, booster pump recirculation system complete including of tubewell and jungle clearance and security. |
| 43 | Sprinkling of water on jogging track, every day on full length of jogging track as per direction of engineer-in-charge. |
| 44 | tulqfo/kkvksa dh lkQ lQkbZ dk dk;Z laosnd }kjk lQkbZ gsrq vko\";d lkeku tSls >kM+w] fQukbZy] dhVuk\"kd nokbZ bR;knh dh O;oLFkk vius Lrj ij djuh gksxh foHkkx }kjk vyx ls dksbZ Hkqxrku ns;h ugh gksxk A |
| 45 | Renovating lawns including weeding cheepingthe grass forking the ground top dressing with manure . Mixing the same with forked soil watering maintaining the lawn for 30 days for till the grass forms a thick lawns free from weeds and fit for moving in the duration of planting if lawn die some where the contractor will replant it at his own cost. (for 24 month) |