|
| 1 | Fitness Centre (Outdoor) Items |
| 2 | Double twister: Pipe-structure made of G.I. Pipe OF114 mm OD. Connecting Pipe–Made of G.I. Pipe OF 42 OD. Handle Frame-Made of G.I.Pipe OF 32 OD. Bearing – Thrust ball bearing Bearing Caps- Made u pof HDPEMaterial 62 mmTwisterPlates–Made of LLDPE Pole Caps – Made up of HDPE Material.PowderCoated(Thickness90 micron) |
| 3 | Shoulder Wheel: Equipment Is Made of GI Pipe. -Main Post Is Made Of 114 OD Pipe. Main Support Diameter 80/60/40/42/32 Mm the Base Plate Is Made Of 30mm Diameter, Seating & Foot Hold- MS Alloy OR LLDPE SEATS, Base Cover-Virgin LLDPE Having 8 Mm Thickness, Coating – Powder Coated, Pre-Polyester Color 120-150 Microns,Accuracy & Precision- All the Bearing Sheets & Other Parts Made on VMC & CNC For High Accuracy Bends- All the Bends Done on Hydraulic Bending Machine on High Accuracy of Bending Subsequent Low Maintenance.The Bearings- Maintenance Free & Oil Sealed (Wherever Used).Durability- Equipment Is Made of Heavy Durability with Long Life & Duration. Metal Coating & Finish- Structure Is Rust Proof & Cover with Rust Free Finish Powder Coating. Friction & Moving Feature- Moving Suspended Elements Are Connected to The Fixed Support with Bearing That Serve Reduce to Friction & Water Fasteners, All Fasteners Are Made of Stainless Steel and Never Be Loose & PreventDetachments, Caps & Cover- All the Open Ends of Pipe and Bolts with Sockets Are Covered with LLDPE Caps & Base Cover Respectively, Finish- All Equipment’s Made by Using Laser CuttingTechnology for Proper Dimensions & Smooth Finish. |
| 4 | Stepper: Providing and fixing using minimum 100 NB GI B pipefor Main Frame, minimum 25 NB GI Bpipe for handle frame,minimum 25NB & 20 NB GI pipeforseatingframestand,molded seatwithinbuilt bolts 3/8”X 1.5” for FOOTRESTnylon66injectionmolded bearingcap&pipecap,fullydoneby first coat of primer jotun brad 40-50 micron thickness and top coat of pure polyester powder with 70-80 micron thickness powder coat |
| 5 | Air Walker:Providing and fixing using minimum100 NB GI B-class Pipe- for MAIN FRAME, minimum 32 NB GI B-CLASS Pipe- for LEG FRAME, Minimum 25 NB GI B-CLASS Pipe for HANDLE FRAME, NYLON 66 INJECTION MOULDED CASING CLAMPS, LLDP Rotomoulded seat with inbuilt bolts 3/8\" X 1.5\" FOOT REST, Nylon 66 injection Moulded BEARING CAP & PIPE CAP, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT |
| 6 | Chest Press: Providing and fixing using minimum 100 NB GI B pipe for Main Frame , 32 Nb Gi pipe handle frame, 25 Nb Gi pipe clamps, nylon 66 injection molded casing ,foot rest : Lid Roto molded seat within built bolts 3/8”X1.5”pipe Cap: Nylon 66 injection molded. Bearing Housing and pin-seamless pipe and round, Bearings: permanent sealed of reputed make Powder coat: Done by pure polyester powder with 70-80 micron thickness powder |
| 7 | Leg Press:Equipment Is Made of GI Pipe. -Main Post Is Made Of 114 OD Pipe. Main Support Diameter 80/60/40/42/32 Mm the Base Plate Is Made Of 30mm Diameter, Seating & Foot Hold- MS Alloy OR LLDPE SEATS, Base Cover-Virgin LLDPE Having 8 Mm Thickness, Coating – Powder Coated, Pre-Polyester Color 120-150 Microns,Accuracy & Precision- All the Bearing Sheets & Other Parts Made on VMC & CNC For High Accuracy Bends- All the Bends Done on Hydraulic Bending Machine on High Accuracy of Bending Subsequent Low Maintenance.The Bearings- Maintenance Free & Oil Sealed (Wherever Used).Durability- Equipment Is Made of Heavy Durability with Long Life & Duration. Metal Coating & Finish- Structure Is Rust Proof & Cover with Rust Free Finish Powder Coating. Friction & Moving Feature- Moving Suspended Elements Are Connected to The Fixed Support with Bearing That Serve Reduce to Friction & Water Fasteners, All Fasteners Are Made of Stainless Steel and Never Be Loose & PreventDetachments, Caps & Cover- All the Open Ends of Pipe and Bolts with Sockets Are Covered with LLDPE Caps & Base Cover Respectively, Finish- All Equipment’s Made by Using Laser Cutting Technology for Proper Dimensions & Smooth Finish. |
| 8 | Rower: Providing and fixingusing, Minimum 100 NB GI B -class Pipe- for MAIN FRAME, Minimum 32 NB GI B-CLASS pipe for SEAT FRAME, Minimum 40 NB & 25 NB B CLASS GI BCLASS Pipe for HANDLE FRAME, Minimum 32NB & 25NB GI B-CLASS pipe with two handles for LEG REST, LLDP Rotomoulded seat with inbuilt bolts 3/8\" X 1.5\" for FOOT REST & SEAT REST, Nylon 66injection moulded BEARING CAP & PIPE CAP, fully Done by first coat of Primer – jotun Brad 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness POWDER COAT |
| 9 | Shoulder press:Providing and fixing using minimum 100 NB GI B pipe for Main Frame , 32 Nb Gi pipe handle frame, 25 Nb Gi pipe clamps, nylon 66 injection molded casing ,foot rest : Lid Roto molded seat within built bolts 3/8”X1.5”pipe Cap: Nylon 66 injection molded. Bearing Housing and pin-seamless pipe and round, Bearings: permanent sealed of reputed make Powder coat: Done by pure polyester powder with 70-80 micron thickness powder |