| 1 | Earth work in Excavation of foundation in hard or gravelly Soil with all leads and lifts including dressing and leveling the bed to proper slope and level making it fit for laying concrete including depositing the excavated materials clear of work site,and dewatering from foundation if necessary supplying all labour and T&P required for the work etc. complete in all respectas directed by the Engineer-in-charge. |
| 2 | Filling foundation and plinth with sand of approved quality well watered and rammed including cost, conveyance, royality and all other taxes of materials supplying all labour and T&P required for the worketc. complete in all respect as directed by the Engineer-In-charge. |
| 3 | Cement Concrete M15 grade with20mm anddown graded hard granite crusher broken chips of approved quality free from weathered skin materials mixing by concrete mixer including hoisting lowering and laying the concrete in position to proper slope and level,compacting by vibrators in layers not exceeding 0.15m depth and finishing the exposed surface smooth including watering,curing for required period with cost,conveyance,hire and running charges of all machineries,royalty and other taxes of all materials supplying all labour,T&P materials required for this item (Excluding cost ofreinforcement if provided) etc. complete in all respect as directed by the Engineer-in-Charge. |
| 4 | Cement Concrete M20 grade with20mm anddown graded hard granite crusher broken chips of approved quality free from weathered skin materials mixing by concrete mixer including hoisting lowering and laying the concrete in position to proper slope and level, compacting by vibrators in layers not exceeding 0.15m depth and finishing the exposed surface smooth including watering,curing for required period with cost,conveyance,hire and running charges of all machineries, royalty and other taxes of all materials supplying all labour,T&P materisls required for this item (Excluding cost ofreinforcement if provided) etc. complete in all respect as directed by the Engineer-in-Charge. |
| 5 | Straightening,cutting,bending,binding,fitting and placing uncoated HYSD bar reinforcement and laying in position including cost of binding wire 18 to 20gauge and fixing of reinforcement including lapping where necessary with all leads, lifts from bending yard to placement spot including cost,conveyance and all other taxes of reinforcementsupplying all labour and T&P required for the worketc. complete in all respectas directed by the Engineer in charge. |
| 6 | Providing Rigid and smooth centering & shuttering for R.C.C works including false works and dismantaling them after casting including cost of materials supplying all labour and T&P required for the work etc. complete in all respectas directed by the Engineer in charge. |
| 7 | Providing weep holes in Brick masonary / plain / Reinforced Concrete aboutment, wingwall / Return wall with 100mm dia P.V.C pipe, extending through the full width of the structure with slope of 1V : 20H to-wards drawing face etc. including cost, conveyance and taxes of all materials supplying all labour and T&P required for the work etc. complete in all respect as per drawing and technical specification as directed by the Engineer-in-charge. |
| 8 | Filling in foundation and plinth with excavated earth including watering and rammingsupplying all labour and T&P required for the work etc. complete in all respect as directed by the Engineer in charge. |
| 9 | Earth work in hard soil or gravelly soil with allleads &lifts including rough dressing and breaking clouds to maximum 5 cm to 7cm and laying in layers not exceeding 0.30m in depth supplying all labour and T&P materials required for the work etc. complete in all respect as directed by the Engineer in charge. |