| 1 | Excavation in foundation in ordinary soil[ loame, clay or sand] inculuding lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches orinto the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30mfrom the foundation trenches. As per SI. No. 251 |
| 2 | Concrete with 40 mm. gauge brick ballast, fine sand of 1.25 FM and cement in proportion of 8:4:1in foundation and under floor, Including supply of all Material, Labour and T & P etc. required for proper completion the work.as per S I No.275 |
| 3 | R.C.C. work with cement approved coarse sand and 2cm (3/4\") gauge approved stone ballast in the proportion of 1:1.50:3 in the Columns excluding supply of reinforcement and its binding but including its fixing and binding the same with 24B.W.G.G.I.binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and T&P etc.required for proper completion of the work.asper SI No.289 |
| 4 | M-150) First class Brick work in 1:6 cement and coarse Sand of 2.25 F.M.mortar in foundation & Plinth inculding supply of all materials, Labour T & P etc. required for proper completion of work as per S.I. No.303 |
| 5 | R.C.C. work with cement approved coarse sand and 2cm (3/4\") guage approved stone grit in the proportion of 1:2:4 in lintel of doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completion of the work. as per SI No.283 |
| 6 | M-150 first class Brick work in 1:6 cement and coarse Sand morter in superstructure for one brickwork inculding supply of all materials Labour T & P etc. for proper completion of work based on S I No303+309+310 |
| 7 | M-150 first class Brick work in 1:4 cement and coarse Sand morter in superstructure for one brickwork inculding supply of all materials Labour T & P etc. for proper completion of work based on S I No303+309+310(a) |
| 8 | Same Item No.6But inLighter beamincluding all required as per S.I. No. 285 |
| 9 | R.C.C. work with cement approved coarse sand and 2cm (3/4\") guage approved stone grit in the proportion of 1:2:4 in the slab excluding supply of reinforcement and its binding but including its fixing and binding the same with 24B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completion of the work. as per SI No.284 |
| 10 | Mild steel or iron in plain work such as reinforced concrete or reinforced brickwork (when not including cutting and bending of bars in required shape and size as per SI No. 504 |
| 11 | C.C. work with 1:2:4 cement C-sand and stone grit 20mm concrete in holdfast including all required in complete work as per S.I. No. 279(i) |
| 12 | 12 mm thick Plaster 1:6 cement fine sand morter overBrick work minimum thickness not to be less than (3/8\") 10mm thick including supply of all materal,labour T&P etc.required for proper complition of thework as Per SI No.586 |
| 13 | Mild steel or iron work in heavy sizes such as trusses, builtup gate, door, frames, record racks roof work, gates etc. wrought to required from including driling holes, rivetting or welding where necessary, and also including supply of steel, bolts, nuts etc. their fixing required for proper completion of work. as per SI No. 502(b) |
| 14 | Supply & Fixing of 100mm initial dia A.C.down pipe including all |